We Want Better Data Center Deals. We Need Your Help.

Join the FAS National Task Force to Establish a Model Community Benefits Agreement for Data Centers – Sign Ups by October 30

Our work starts with listening to state and local governments, understanding their challenges, and connecting research to practical solutions. 

When we began researching data center Community Benefits Agreements (CBAs), we heard a consistent need: local governments wanted insight into how peer communities were approaching negotiations with data center developers. Which elements were most important to address in an agreement? Which CBAs were protecting communities the most? Which were yielding the most durable benefits to residents? But many agreements are negotiated confidentially, making them difficult to access and compare. That means too many communities are lacking a clear picture of emerging practices and their options at the negotiating table. 

To help close that gap, we published  Before Breaking Ground: A Local Government Guide to Better Data Center Policy and Community Benefits.  Our team took a close look at 10 CBAs (eight of which were only uncovered through Freedom of Information Act requests) from a diverse slate of communities across the country, providing one of the first comparisons of the agreements that can impact communities for decades into the future.

Today we are announcing the next step into this work –  developing a model CBA template. But we need help from the people who are facing these new challenges first hand.

That’s why FAS is launching a national task force to bring together state and local government officials, subject-matter experts, and community practitioners. 

How to Get Involved: Sign up by Friday, October 30, 2026 

Become a Task Force Member 

We’re looking for state and local government leaders who can bring firsthand experience, policy expertise, and practical perspectives to the template’s development. 

Time Commitment: Two meetings per month through April 2027 – one full-group meeting and one committee meeting focused on a specific topic, plus written feedback on draft templates. 

Sign up for the FAS Template CBA Task Force 

FAS will not publicly identify participating individuals or organizations without their permission. 

Join the On-Call Expert Panel 

We’re also seeking academic, non-profit, and other subject matter experts to help address knowledge gaps and contribute relevant research, legal expertise, and historical context as the template develops. 

Join the On-Call Expert Panel

Participate in Public Comment

FAS expects to release a draft for public comment in March 2027. Residents and other interested stakeholders, including people living near data centers or in communities negotiating with developers, will have an opportunity to share feedback. 

How the Task Force Will Work  

FAS has developed an initial draft CBA template based on our research. Task force participants will help refine it, identify knowledge gaps, and develop recommendations that reflect the realities of local policymaking. 

The process will include three ways to participate:

Drawing on the collaborative In the Lab model, FAS will prioritize evidence-based recommendations, transparency, an efficient timeline, and a community of practice among governments navigating data center development. 

What Will the Task Force Cover? 

Committee discussions will explore key provisions of a model CBA, including: 

What Success Looks Like

By combining research with the experience of local leaders and subject matter experts, FAS aims to give communities practical tools for more informed negotiations. 

The resulting template will help local governments evaluate proposals, identify potential community benefits, set clearer expectations, and strengthen accountability.

The goal: help communities approach data center development with stronger negotiating tools and a clearer understanding of what’s possible.

Our In the Lab initiative demonstrates the value of this collaborative approach. Our Model Data Governance Policy and Practice Guide for Cities and Counties remains the most robust publicly available guide even years later. Our Gen-AI initiative was one of the first task forces created by a national organization that brought together more than 45 unique local governments, 30 universities, four federal agencies, and philanthropic organizations to develop resources on AI community engagement, AI cybersecurity risks, and AI research priorities. 

The CBA task force applies this same approach to a growing local policy challenge: bring the right people together, connect research with practical experience, and create the tools government can use. 

Why a Model CBA?

To date, many negotiation efforts between local governments and data centers have been held confidentially. This makes  it difficult for communities to see what others have secured or proactively identify  emerging best practices. Without access to comparable agreements, local governments lack a clear baseline for negotiations. A model CBA can help communities: 

The goal isn’t a one-size-fits-all agreement. It’s a flexible starting point grounded in research and shaped by experience. 

Why work with us? 

The shared  experience and perspective will shape a practical, adaptable template that communities can tailor to their own laws, needs, and policy goals. This is yet another form of FAS’s model of policy entrepreneurship: the practice of taking good policy ideas and turning them into actionable policy using science and evidence, and an understanding of how governments actually work. We know there are local residents and leaders already practicing policy entrepreneurship on this issue, and we want to collaborate.

If you have any questions about joining the FAS Template CBA Task Force, please contact metrolab@fas.org.

Before Breaking Ground: A Local Government Guide to Better Data Center Policy and Community Benefits

Download the full report here

Data center development has outpaced most local governments’ capacity to respond to it, as evidenced by the increasing amount of moratoria legislation to give time for policy development and conversations with communities.1 As data center applications ramp, so have requests for policy guidance by local governments. Broadly, we are starting to see nascent best practices, understanding more clearly the knowledge gaps and research needs, and building a community of practice across industries. This report provides new information for local government policy makers, including property value impacts and a robust collection and analysis of community benefit agreements. 

Over the course of 2026, the Federation of American Scientists (FAS) has conducted primary research, including interviews in the field, issued public records requests for difficult-to-find agreements, and created a series of trackers on new ordinances, state legislation, and moratoriums. This report serves as a landscape assessment and toolbox from which local governments can negotiate an informed position when it comes to the levers available to them and includes a first-of-its kind analysis of ten executed agreements between local governments and data center developers.

This report includes three sections:

Ordinances Analysis: provides a brief overview of what local governments are already doing through a landscape scan of 42 local ordinances and 12 state actions.

Data Center Property Values: provides a sampling of data for taxable value over time across six jurisdictions.

Community Benefits Agreements (CBA) – Review and Comparison: provides a comparative review of ten CBAs, identifying common requirements, what is offered as a benefit to the local government and to the developer, and what policy considerations are included within the agreement.

What We Heard: Perspectives From the Field

Alongside the desk research in this report, FAS conducted interviews with elected officials, economic development leaders, water utility staff, community advocates, and other stakeholders across multiple states currently experiencing rapid data center growth. Interviews were conducted under the Chatham House Rule. Insights below include recurring themes across these interviews rather than specific details regarding any one person, jurisdiction, or organization.

Public sentiment has recently changed 

Several individuals described a shift in public sentiment over the past six to twelve months. Prior to this, complaints had been specific, including noise, proximity of data centers to homes, and air pollution concerns. More recently, sentiment has broadened into blanket opposition unrelated to any specific project. One local government interviewee noted, “Interest [in data centers] has increased and there is an entire population that hates it.” This interviewee said that they are spending most of their time “trying to establish a common understanding of facts” and that “the general national movement is largely misinformed or uninformed.”

CBAs should supplement ordinances

Even local government practitioners with years of data center development experience noted that their understanding of CBAs as a tool was knowledge they had acquired only within the past six months. In locations where CBAs had been adopted, interviewees noted that a CBA supplements an ordinance but does not replace it. They also noted that the two need to be written to reinforce each other because a CBA cannot fix a zoning gap and a zoning ordinance cannot capture specific project commitments like a CBA can.

Enforcement around decommissioning is largely untested

Multiple interviewees stated they were not aware of a single case where a data center had ceased operations or been formally decommissioned. This indicates the enforcement provisions in most agreements and ordinances are theoretical to date, and one local government interviewee recommended other jurisdictions “approve a decommissioning plan when you approve a data center.”

Transparency is a recurring complaint 

The most consistent frustration from both water utilities and environmental advocates was the absence of standardized, facility-level reporting that would let a utility or community actually verify usage against what was promised at permitting. One noted, “Water demands of today are a function of air conditioning [in our climate]. Cooling methodologies of data centers becomes a topic: there are strategies to reduce this but until we have a more common framework and lexicon, we don’t have a single clearinghouse to share this information and better understand it.”

Structural channels for local governments to learn from each other are lacking 

Nearly every local government practitioner interviewed said they have wondered who else has dealt with this, and wanted to understand what others have learned in the process. Additionally, these same practitioners described primarily relying on informal calls with counterparts in other jurisdictions because no structured learning pathway or resource exists. 

Spend the time during a moratorium to address concerns

With the recent wave of moratoria, we asked interviewees how they would recommend others use this time. One interviewee recommended that other jurisdictions: “[Look] at the energy infrastructure because that touches everything else. It touches the air quality impact on the back-up systems. Same with the water supply concerns as well. Ensure that the industry is actually paying.”

Determine whether, where, and under what conditions before you need to 

Local government interviewees’ advice included to decide whether, where, and under what conditions your jurisdiction wants data centers before you are at the negotiating table with a developer. One noted, “Determine up front if you want them, where you want them, and under what conditions you will take them. Understand your taxing structure up front. If you give away the store, then you’re taking away the main reason you would want to get them. Incentives are necessary for data centers.” 

Ordinance Analysis

As state and local governments turn to legislative actions to regulate data centers, FAS examined and tracked 42 local ordinance measures. These 42 ordinances were collected during our research process as a starting place to analyze trends and compare themes. Our analysis looks at these ordinances to highlight what key areas of policy they cover (noise, environment, etc), and beginning trends. It is not an exhaustive list.2 

Local and state governments have increasingly been racing to regulate data center development: of 42 local ordinances and ballot measures reviewed, 33 of them were passed in 2026 alone, compared with two in 2024 and six in 2025. Only one action in the dataset predates the current wave (Chandler, Arizona in 2022). The local actions span 24 states and follow varying approaches. For instance, a jurisdiction receives an unexpected large-scale data center proposal. The zoning code may or may not classify data centers as a distinct use. Next, the council might enact an emergency moratorium to buy time. Alternatively, a permanent zoning ordinance may be enacted from the outset or after a temporary moratorium, which reclassifies data centers as an industrial use requiring special permits, subject to setbacks of varying degrees, noise limits, and water use/cooling restrictions.

Two major developments in the current dataset mark a genuine escalation beyond earlier trends. First, Monterey Park, California’s Measure NDC3 passed on June 2, 2026 with 86% of the vote, making it the first voter-enacted ban on data center construction in the country on a local level. Second, New York Governor Kathy Hochul’s Executive Order 62 (July 14, 2026) created the first statewide data center permitting moratorium in the country, a new category of wide-reaching executive action on this front. 

Of the 42 local ordinances FAS tracked, the following timeline highlights how quickly local action on data centers has escalated since 2022:

Local actions span 24 states. Georgia leads with 7 local actions (Atlanta with two separate ordinances, Clayton County, DeKalb County, Athens-Clarke County, Camden County, and Statesboro), reflecting Atlanta’s status as one of the fastest-growing data center markets in the country. Michigan follows with 4 (Springfield Township, Saline, Mason, Ypsilanti). Virginia (3) rounds out the top jurisdictions, unsurprising given Virginia’s “Data Center Alley” concentration in Loudoun and Fairfax counties.

Two Core Regulatory Approaches

Moratoria (14 of 42 actions)

Moratoria sometimes are the first tool jurisdictions tend to reach for, varying in length from a few months to over a year, in some cases. The stated rationale is almost identical across every entry: the zoning code does not yet define or address data centers as a specific land use, so the jurisdiction needs time to study impacts (water, noise, energy, property values) and draft permanent standards before more projects arrive. Examples include Denver (effective May 21, 2026 by unanimous vote), Minneapolis (six-month pause with a downtown carve-out), Seattle (finalized as Ordinance 127447, effective through June 2027), New Orleans (interim zoning district effectively banning data centers citywide for at least a year), and Wright County (emergency moratorium across all 18 townships).

Zoning ordinances (23 of 42 actions)

Zoning ordinances tend to follow an expired moratorium or are enacted directly, and contain many similarities:

Common Themes

Three community concerns are consistent: 1) noise; 2) water consumption (especially in drought-prone regions); and 3) increasing residential utility rates.4

Commons themes across CBAs

ThemeFrequency
(of 42 local actions)
Representative examples
Moratorium as first response14 (~33%)Denver, Minneapolis, Seattle, New Orleans, Wright County, Cumberland County, Clayton County, Monterey Park
Water use and/or cooling restrictions17 (~40%)Athens-Clarke County (closed-loop A/C), Little Rock (bans once-through/groundwater-well cooling), New Castle County, Bowling Green, Fayetteville
Noise limits / studies13 (~31%)Fairfax County (pre/post-construction studies), Statesboro (50 dB cap), Franklin Park (67 dB daytime), Linn County
Formal definition of “data center” added to code or measure directing the adoption of a definition9 (~21%)Atlanta, Chandler, Anchorage, Kansas City, Little Rock, Seattle
Residential setbacks8 (~19%)200 ft (Fairfax, Anchorage) up to 1,500-2,000 ft (Bowling Green, South Strabane)
Special use / special exception / conditional use permitting10 (~24%)Fairfax County, Loudoun County, Fayetteville, Franklin Park, Anchorage, Atlanta (25-O-1063)
Utility “will-serve” letters / capacity confirmation4 (~9%)Kansas City, Little Rock, Statesboro, Anchorage
Decommissioning / financial-assurance bonds4 (~9%)New Castle County, Statesboro, Franklin Park, Bowling Green
Data center restrictive ballot measures / citizen referenda4 (~9%)Monterey Park (passed with 86% of the vote), Boulder City, Port Washington (enacted), Frederick County
Energy generation/electrical grid capacity9 (~21%)Seattle, Loudoun County, Franklin Park, Atlanta

Ballot Measures

Direct voter action has now produced a concrete result rather than only proposals. Again highlighting that Monterey Park, California voters approved Measure NDC on June 2, 2026 by 86%, permanently prohibiting data center development within city limits. It is the first U.S. city to lock in such a ban by ballot rather than council vote. Boulder City, Nevada has a similar prohibition measure scheduled for the November 2026 ballot. Port Washington, Wisconsin voters already approved, with a 66% vote, a measure requiring voter approval before any tax incentive can be offered to a data center developer. Frederick County, Maryland residents were looking to vote  in a November 2026 referendum that would have  invalidated a 2,614 acre overlay zone the county council had already approved for data center development. However, the Maryland Supreme Court blocked the referendum citing that zoning ordinances are not subject to referendums and even if so, the referendum question was unclear. Since that time, Frederick County has executed an agreement benefit with the developer that is available for public comment. The recent “Development Rights and Responsibilities Agreement” – is included in the analysis below.

State and Executive Action

The 12 state-level bills and executive orders reviewed take a broader range of approaches than local ordinances. Most of the state legislative bills focus on who pays for the power, water, and grid infrastructure data centers require, rather than restricting where they can be built, which is a more localized issue. New York’s Executive Order 62, however, takes a more assertive approach: the first statewide permitting moratorium enacted by executive action rather than legislation.

State and Executive Actions on Data Centers

StateDocumentCore focus
New YorkExec. Order No. 62First statewide data center permitting moratorium in the U.S. (facilities 50+ MW); pauses DEC discretionary permits for up to a year while the state develops an environmental impact statement and ratepayer/community benefit standards
South CarolinaH. 5286Joint resolution for a statewide moratorium on permits/incentives for new data centers until Jan. 1, 2028 (companion bill – H. 5526)
OklahomaHB 2992Separate utility rate class for large loads (75+ MW) so costs aren’t shifted to residential ratepayers
IdahoHB 911“No harm test” before utilities serve new large loads (50+ MW)
VirginiaHB 507Tier-4-equivalent emissions standard for backup generators
VirginiaSB 94Requires a noise/community site assessment before rezoning approval for 100+ MW facilities
UtahHB 76Mandatory water-use reporting and public disclosure for large data centers
OregonHB 4084Restricts property-tax exemption periods and enterprise-zone eligibility for data centers
FloridaSB 484Transparency, ratepayer cost-shift protection, and a new water-permitting framework for large-scale facilities
PennsylvaniaHB 2151Directs the state to publish a voluntary model zoning ordinance for municipalities
PennsylvaniaExecutive OrderGovernor’s Responsible Infrastructure Development (GRID) Standards to Protect Pennsylvanians and Establish Strict Guardrails to hold data centers accountable
CaliforniaSB 887Removes CEQA categorical exemptions; offers an optional streamlined pathway for zero-carbon, water-efficient projects

Only South Carolina’s bill and New York’s executive order propose or impose an outright statewide moratorium; the remaining ten state bills aim to keep data centers financially self-contained through separate utility rate classes, mandatory water/energy reporting, environmental review requirements, and (in Pennsylvania’s case) a voluntary model ordinance municipalities can adopt. Note, Governor Shapiro did recently announce an Executive Order that requires data centers to provide information on energy affordability, transparency and community engagement, workforce, and environmental protections in order to be eligible for certain state tax incentives.5

Ordinance Analysis Conclusion

The data support a clear and intensifying narrative that data center regulation in the U.S. increased drastically in terms of moratoriums and permanent zoning overhauls in 2026, driven by community concern over noise, water, and energy costs. Local governments are largely using the same approach: pause first, then reclassify as industrial, require special-use review, and impose setback/noise/water conditions. Two recent developments suggest this wave is still escalating rather than levelling off: Monterey Park’s voter-enacted permanent ban shows communities are willing to go beyond temporary pauses when council action feels insufficient, and New York’s statewide executive-order moratorium shows state governments are now willing to intervene directly rather than leaving the issue to municipalities or the legislature alone.


Property Values Over Time

FAS examined empirical data to capture changes in property value over time for data centers. Why this matters: if local governments are going to abate a property in exchange for creating a betterment fund, it is essential to perform a cost benefit analysis to the greatest extent possible. 

What is a tax abatement? 

A tax abatement works differently in each jurisdiction, but generally, it means freezing a property value over a long period of time for the purpose of attracting business or development. For example, the Texas Comptroller6 defines it as “a local agreement between a taxpayer and a local taxing unit that exempts all or part of the increase in the value of property from taxation for a period not to exceed 10 years.” 

Increasingly, local governments are offering abatements or tax rebates in exchange for the creation of a “betterment fund.” For example, a developer can own abated property for ten years, in exchange for the obligation to contribute $20M to a betterment fund. An alternative is to offer no abatement, receive no money in support of a betterment fund, and to collect the standard rate of property taxes on a data center parcel. This tradeoff can be illustrated by the following:

The abatement offers the developer a savings of $90 per year. Therefore if the local government offers a 10 year tax abatement, a community betterment fund should receive at least $900 for the local government to be made whole. By understanding property values over time, we can start to see what kind of deals developers are actually receiving.

Historically, local governments have had challenges in understanding or assessing asset value over time. For example, the City of Chicago sold its parking to a private vendor for 75 years, and the private vendor recouped the costs and made a profit in under 10 years,7 illustrating the difficulty any level of government may have in assessing the property value of a parcel more than five years into the future. 

As evidenced by the CBAs FAS has collected, as well as some recent legislation, the deals being made for data centers have long runways. In 2025, the state of Kansas passed SB 98, the Data Center Sales Tax Exemption, establishing a 20-year state and local tax exemption for data centers with over $250M in capital costs. And many of the CBAs hold a term of 10-20 years. 

This report examines several properties to identify early trends in property values, a key component of the economic development equation. The report does not analyze neighboring property values, which may somewhat have an impact on the overall property tax collections for a jurisdiction, as well as on neighboring residential property values. This reduction in property value for nearby residential properties, or even entire neighborhoods, should be taken into consideration when contemplating a betterment fund. 

This report includes the following six U.S. jurisdictions with either existing and/or growing data center presence: 

Aggregate change in property value

LocationProperty Value Time Period AnalyzedAggregate Taxable Value Rate of Change
Loudoun County, Virginia2021-263.85
King County, Washington2021-26-44%
Cook County, Illinois2022-250.2
Montgomery County, Ohio2021-26-29%
Maricopa County, Arizona2023-260.2
Fulton County, Georgia2021-264.66

Loudoun County, Virginia 

Located in Northern Virginia, Loudoun County is home to “Data Center Alley”. This unique location attracts data centers due to the immense amount of fiber and connectivity. Beginning in 1997 with the arrival of AOL, Loudoun County is now home to more than 25 million square feet of data centers that are currently in operation, with 4 million square feet in construction.8

Taxable Value Rate of Change: Loudoun County

Site2021 Taxable Value2022 Taxable Value2023 Taxable Value2024 Taxable Value2025 Taxable Value2026 Taxable Value2021-2026 Taxable Value Rate of Change
22291 SHELLHORN RD$51,084,160$113,281,250$96,478,200$341,988,120$472,659,020$487,513,210854.33%
21701 FILIGREE CT$276,693,060$320,705,880$366,281,020$461,679,100$599,023,560$759,384,260174.45%
44470 CHILUM PL$71,066,090$72,234,980$82,122,790$86,445,440$98,722,160$103,077,65045.04%
21571 BEAUMEADE CIR$51,916,540$50,443,010$54,819,540$68,221,690$77,311,690$81,269,50056.54%
21821 UUNET DR$10,257,000$283,203,130$461,948,000$447,841,580$981,594,000$1,003,533,1909683.89%
21745 SIR TIMOTHY DR$137,715,370$159,592,360$182,266,340$229,655,330$297,393,480$380,928,000176.10%
43830 DEVIN SHAFRON DR$48,868,780$38,515,630$43,412,230$54,962,380$105,307,860$133,104,930172.37%
20491 GOOSE LANDING LN$108,762,100$185,403,780$239,338,150$246,733,760$429,518,490$562,846,470417.50%
Total$756,363,100$1,223,380,020$1,526,666,270$1,968,888,960$3,174,769,030$3,667,885,130384.94%

It should be noted that Northern Virginia has unique assets, including an extensive fiber buildout thanks to AOL’s origin in 1997. To compare to other properties, below is data that pertains to Maricopa County, Arizona and Fulton County, Georgia.

Maricopa County, Arizona

Taxable Value Rate of Change: Maricopa County

Address2023 taxable value2024 taxable value2025 taxable value2026 taxable valueYear of data center construction (if indicated)2023-26 taxable value rate of change
2121 S PRICE RD, CHANDLER, AZ 85286$62,707,324$65,842,690$69,134,825$72,591,566200615.76%
120 E VAN BUREN ST PHOENIX, AZ 85004$32,403,411$34,023,582$35,724,761$37,510,999Converted in 200115.76%
8521 E PRINCESS DR SCOTTSDALE, AZ 852559,650,27010,132,78410,639,42311,171,394Built in 2007; acquired from LexisNexis in 201815.76%
3223 S ELLSWORTH RD MESA, AZ 85212$2,955,810$5,573,161$5,851,819$6,144,4102023107.88%
2475 W TOWNLEY AVE PHOENIX, AZ 85021$3,374,540$3,543,267$3,720,430$3,906,452201015.76%
2950 S LITCHFIELD RD GOODYEAR, AZ 85338$59,222,280$62,183,394$65,292,564$68,557,1922020, but will be expanded.15.76%
Total$184,312,822$197,831,976$211,299,174$221,864,13220.37%

Fulton County, Georgia

Taxable Value Rate of Change: Fulton County

Address2021 taxable value2022 taxable value2023 taxable value2024 taxable value2025 taxable value2026 taxable value2021-26 taxable value rate of change
56 MARIETTA ST NW
ATLANTA
$4,720,840$4,720,840$4,720,840$4,720,840$5,000,000$5,000,0005.91%
250 WILLIAMS ST NW
ATLANTA
$48,000,000$48,000,000$55,660,400$55,660,400$55,660,400$89,076,56085.58%
12655 EDISON DR
ALPHARETTA
$4,256,440$4,256,440$4,256,440$4,256,440$5,143,440$8,329,76095.70%
470 EAST PACES FERRY RD
ATLANTA
$5,735,040$5,735,040$5,735,040$5,735,040$5,735,040$5,871,0402.37%
760 DOUG DAVIS DR
HAPEVILLE
$18,389,680$18,389,680$18,389,680$16,752,000$16,752,000$16,752,000-8.91%
1760 THOMAS ST NW
ATLANTA
–––9,564,7909,564,800319,573,3403241.14%
4764 BAKERS FERRY RD SW LOT 2
SOUTH FULTON
–––4,837,7604,837,76014,582,320201.43%
Total81,102,00081,102,00088,762,40087,124,72088,290,880459,185,020466.18%

Key Considerations and Takeaways:

  1. Understanding property value over time is the most important component to the equation of any property tax deal. There are other factors to consider when calculating the entire financial impact of a data center that include personal property tax or use tax. Those are not considered in the above tables. 
  2. The variables with respect to property values of industrial or office buildings differ greatly, but especially with data centers. These numbers are early indicators of property values and should be regularly followed. 
  3. Data availability varied by jurisdiction, meaning not all jurisdictions have a complete data series from 2021-2026.

Community Benefits Agreements – Review and Comparison

Community Benefits Agreements (CBAs) have been used in numerous contexts to ensure that cities, counties, or local community groups obtain the benefit of the bargain when negotiating with a developer for large infrastructure projects. They ensure that developers of such projects act in the interest of the community that they are located in, such as building or upgrading infrastructure, hiring locally, and abiding by sustainable practices, for example. The proliferation of data centers across the United States in recent years provides a golden opportunity to employ CBAs as a method to level the playing field for communities that might otherwise receive little to no benefits from the presence of these data centers. 

As the country sees an exponential increase in data center applications, local governments have been considering CBAs. However, due to reasons such as confidentiality agreements, it has been difficult to find examples of executed agreements. Indeed, much analysis points to only one well known one, hailing from Lancaster, Pennsylvania. In late 2025, the City of Lancaster entered into a CBA with the developers of two AI data center campus hubs. 

The following review of Lancaster’s CBA and an additional nine agreements, obtained by FAS through public records requests as allowed via state “sunshine laws” or other similar open-records statutes, is a first-of-its-kind comparative analysis of executed agreements in terms of scope and data access given CBAs are rarely published. 

FAS pursued these records for the purpose of:

  1. Identifying the spectrum of options local governments are considering to include,
  2. Collecting best practices, and 
  3. Making more public these important agreements as policy makers across the country contemplate what a suggested approach should look like. 

This report compares ten community benefit agreements, covering the terms and conditions present in each, analyzing which are present, and which are not.

A note on scope and terminology: some municipalities like El Paso, Texas split terms and conditions up across multiple separate agreements, all of which taken in the aggregate constitute a binding contract among the parties. The majority of the agreements found are known by other names, often phrased as “Development Agreement” or “Memorandum of Agreement,” for example. Despite the disparate naming, their purpose matches that of a CBA: to serve as a legally binding document between a community and developers of large infrastructure projects ensuring certain terms are abided by for the community’s benefit over time. For the purpose of this report, we will refer to all of the referenced agreements below as a CBA. 

Through extensive research, this analysis examines CBAs from the following jurisdictions:

Given that Lancaster is the only explicitly named CBA, it will serve as the baseline to compare and contrast the other data center agreements in the subsections to follow. While the other agreements have community benefits provisions found throughout, it is not the overall theme of the contract, whereas Lancaster’s is specifically written around community benefits, and thus tends to be more in-depth regarding certain focus areas. Thus, some excerpts for Lancaster’s CBA will contain recommendations for future CBAs, based on what terms the agreement already contains, as well as where there may be room for growth. 

Overall, the CBAs pertaining to data centers analyzed in this report consider the following policy areas and sub-areas:10 

Policy themes across CBAs

Policy AreaTax and FinancingEnvironmental ProtectionsAccountabilityDeal Structure
Sub-policy AreasDuty for Public ImprovementsEnergy usage and Clean energyLegal ComplianceCorporate Restructuring
TaxesWater UsageEmploymentForeclosure, Mortgages, and Encumbrances
Financial ContributionsNoiseTransparencyEminent Domain
LightingRemedies
E-Waste

Trends in the Agreements on Data Centers

TopicPima Co., AZLancaster, PAMarysville, OHCedar Rapids, IADekalb, ILEl Paso, TXFestus, MOSt. Louis, MOFrederick Co., MDWarrenton, MOTotal (out of 10)
Duty for Public Improvementsyesyesyesyesyesyesyesyes8
Financial Contributionsyesyesyesyesyesyesyesyes8
Taxyesyesyesyesyesyesyesyesyes9
Energy Usage/Clean Energyyesyesyesyesyesyes6
Water Usageyesyesyesyesyesyes6
Noiseyesyesyesyesyes5
Lightingyesyesyes3
E-Wasteyesyes2
Compliance with Lawyesyesyesyesyesyesyesyesyesyes10
Employmentyesyesyesyesyesyesyes7
Transparencyyesyesyesyesyesyesyesyesyes9
Remediesyesyesyesyesyesyesyesyesyes9
Corporate Restructuringyesyesyesyesyesyesyesyesyes9
Foreclosure/Mortgagesyesyesyesyesyesyes6
Eminent Domainyesyesyes3

Duty for Public Improvements

Mentioned in 8 of the 10 jurisdictions

Financial Contributions

Mentioned in 8 of the 10 jurisdictions

Taxes

Mentioned in 9 of the 10 jurisdictions

NOTE: Terms and conditions surrounding tax exemptions or abatements are fully absent from the Lancaster CBA, unlike the other agreements discussed in this Report. Moving forward, future CBAs should consider emulating this, as many jurisdictions lose the opportunity for significant amounts of tax revenue due to abatements or exemptions that are enacted as part of the deal between the data center developers and the jurisdictions that will host them.13 For further information on this, please refer to the Tax Analysis Section of this Report. 

Energy Usage/Clean Energy

Mentioned in 6 of the 10 jurisdictions

Water Usage

Mentioned in 6 of the 10 jurisdictions 

Noise

Mentioned in 5 of the 10 jurisdictions

Lighting

Mentioned in 3 of the 10 jurisdictions

E-Waste

Mentioned in 2 of the 10 jurisdictions

Compliance with Law

Mentioned in 10 of the 10 jurisdictions

Employment

Mentioned in 7 of the 10 jurisdictions

Transparency

Mentioned in 9 of the 10 jurisdictions

Remedies

Mentioned in 9 of the 10 jurisdictions

Corporate Restructuring 

Mentioned in 9 of the 10 jurisdictions

Foreclosure/Mortgages/Encumbrances

Mentioned in 6 of the 10 jurisdictions

Eminent Domain 

Mentioned in 3 of the 10 jurisdictions

CBAs Summary and Recommendations

1. Tax and Financing

The overwhelming majority of agreements focus on money in a broad sense, whether addressing tax requirements or providing funding for infrastructure development or philanthropic causes. Funding requirements appear in the terms and conditions the most often, as most of the agreements are structured around a transactional relationship where monetary “benefits” are conferred in exchange for data center development. Communities should be mindful of the possibility that data center property values may increase to the point where such benefits are less than the government funding gained through property taxes. Thus, while some communities may receive some benefits, the benefits are less than what they could have been had there been no exemptions or abatements. 

Additionally, to say the size of these agreements is substantial for the size of the jurisdiction its being made in is an understatement. For example, the City of Warrenton, MO will issue $85 billion in bonds per the agreement. The 2020 census marks a population of 8,429 residents. Thus, Warrenton will issue bonds at a rate of approximately $10 million per resident.

2. Environmental Protections

Specific terms related to water, energy usage, noise, or any other concern about the data center on the surrounding lived environment are less frequent, presenting an opportunity for meaningful change. Whenever they are present, they are either broad, or in some cases are completely optional or otherwise have little to no enforcement mechanisms. 

Considerations for Future Agreements: 

3. Accountability

Agreements varied widely in their coverage of accountability provisions, with some expressing more detail than others in areas that necessarily need precision, such as transparency to the community and remedies for default. On the employment front, none of the agreements contained binding requirements; just projections, if at all. 

Considerations for Future Agreements: 

4. Deal Structure

Many agreements touched on what the protocols are for assigning interests to third parties. A common theme was that these assignments can largely take place without the consent of the host municipality. Over half mentioned mortgages and the rights and obligations that take place under those arrangements, including what happens during foreclosure. Three agreements mentioned eminent domain in some fashion, one of which was in the context of buying out residential properties for the data center development. 


Overall Recommendation and Outstanding Questions

Data centers touch on a wide range of policy areas. As the FAS team collected materials and information for this endeavor, we maintained a list of priority, time-sensitive knowledge gaps that, if research were conducted or translated to fill, would further support policy making as communities grapple with these decisions. 

We present these gaps below as research questions, a format FAS uses across its Civic Research Agenda work which identifies specific research needs from local governments to the university, national lab, and federal science communities best positioned to answer it. A research question in this sense is a concrete gap that a researcher could take on as a discrete study. Once answered, these findings must be adapted into plain-language guidance that local policymakers can act on directly.

Collectively, FAS recommends that state and local governments not allow for tax exemptions or provide economic incentives without the opportunity to open up negotiations beyond five years. The value of these properties may increase substantially. The number of employees required to maintain these facilities could decrease because of better technology. We simply do not have enough information to understand the true economics of these deals. 

FAS’ State and Local Innovation team intends to work with local government and university partners to continue this research on best practices, as well as considering template language for ordinances and community benefit agreements. 


Community Benefits Agreement Examples

MunicipalityDocument DescriptionLink
Cedar Rapids, IASupporting document: Recording memorandumhttps://fas.org/wp-content/uploads/2026/08/Cedar-Rapids_-PROPERTY-DESCRIPTION-CP-Contr-Agree-Misc-TIF-0003-2024-0072-01-25-1-28-2025-MOA-QTS-CEDAR-RAPIDS-I-DATA-CENTER-CAMPUS-ALONG-76TH-AVE-SW.pdf
Cedar Rapids, IASupporting document: Recording memorandumhttps://fas.org/wp-content/uploads/2026/08/Cedar-Rapids_-MEMO-OF-AMENDED-AGREEMENT-CP-Contr-Agree-Misc-TIF-0003-2024-1409-12-25-12-2-2025-MOA-AMENDED-QTS-CEDAR-RAPIDS-I-76TH-AVE-SW.pdf
Cedar Rapids, IAAssignment of obligationshttps://fas.org/wp-content/uploads/2026/08/Cedar-Rapids_-ASSIGNMENT-OF-OBLIGATIONS-CP-Contr-Agree-Misc-TIF-0003-2024-0865-07-25-7-22-2025-DEV-AGR-ASSIGNMENT-QTS-CEDAR-RAPIDS-I-76TH-AVE-SW-DATA-CENTER.pdf
Cedar Rapids, IAPrimary agreementhttps://fas.org/wp-content/uploads/2026/08/Cedar-Rapids_-_DEVELOPMENT-AGREEMENT_-CP-Contr-Agree-Misc-TIF-0003-2024-0072-01-25-1-28-2025-DEV-AGR-QTS-CEDAR-RAPIDS-I-DATA-CENTER-CAMPUS-ALONG-76TH-AVE-SW.pdf
Cedar Rapids, IAAmendmenthttps://fas.org/wp-content/uploads/2026/08/Cedar-Rapids_-_AMENDED-DEVELOPMENT-AGREEMENT_-CP-Contr-Agree-Misc-TIF-0003-2024-1409-12-25-12-2-2025-DEV-AGR-AMENDED-QTS-CEDAR-RAPIDS-I-76TH-AVE-SW.pdf
Dekalb, ILPrimary agreementhttps://fas.org/wp-content/uploads/2026/08/Dekalb-IL-Project-Vector-Annexation-and-Dev-Agreement.pdf
El Paso, TXAncillary agreement: Tax abatementhttps://fas.org/wp-content/uploads/2026/08/El-Paso-TX-Seafox_City_312_Tax_Abatement_Agreement_4873-7616-2427_11.pdf
El Paso, TXAncillary agreement: Road improvementshttps://fas.org/wp-content/uploads/2026/08/El-Paso-TX-Road-Improvements-Ex._Development_Agreement_Stan_Roberts.pdf
El Paso, TXPrimary agreementhttps://fas.org/wp-content/uploads/2026/08/El-Paso-TX-Economic-Dev-Program-Agreement-MEMORANDUM-OF-UNDERSTANDING.pdf
Festus, MOAncillary agreement: Preliminary fundinghttps://fas.org/wp-content/uploads/2026/08/Festus-MO-Preliminary-Funding-Agreement-fully-executed-.pdf
Festus, MOPrimary agreementhttps://fas.org/wp-content/uploads/2026/08/Festus-MO-4876-Infrastructure-Development-and-Funding-Agreement-with-CRG-Acquisition-LLC-2.pdf
Festus, MOSupporting document: Public statement from Mayor Sam Richardshttps://fas.org/wp-content/uploads/2026/08/City-of-Festus-Public-Statement-from-Mayor-Richards-3202026-with-attachments.pdf
Frederick County, MDPrimary agreementhttps://fas.org/wp-content/uploads/2026/09/Frederick-County-MD-CBA.pdf
Lancaster, PAPrimary agreementhttps://fas.org/wp-content/uploads/2026/08/Lancaster-CBA-Draft.pdf
Marysville, OHPrimary agreementhttps://fas.org/wp-content/uploads/2026/08/Marysville_-2025-11-10-City-Council-Meeting-Agenda-Packet-_-MuniDocs-_-Marysville-OH-_-Municode-Library.pdf
Pima County, AZPrimary agreementhttps://fas.org/wp-content/uploads/2026/08/Pima-County-AZ-MOA_-File-ID-19642-CA_BindingMOAHumphreysPeakProperties.pdf
Pima County, AZSupporting document: Project update memorandumhttps://fas.org/wp-content/uploads/2026/08/Pima-County-AZ_-Update-on-Project-Blue.pdf
St. Louis, MOSupporting document: Toplines on project conditions, components, and benefitshttps://fas.org/wp-content/uploads/2026/08/St.-Louis_-Armory-Innovation-Data-Center-Toplines.pdf
St. Louis, MOSupporting document: Summary of CBA provisionshttps://fas.org/wp-content/uploads/2026/08/St.-Louis_-Armory-Innovation-Data-Center-Project_-Summary-of-CBA-Provisions.pdf
St. Louis, MOSupporting document: Project conditions, components, and benefitshttps://fas.org/wp-content/uploads/2026/08/St.-Louis_-Armory-Innovation-Data-Center-Details.pdf
St. Louis, MOSupporting document: Summary of conditional use provisionshttps://fas.org/wp-content/uploads/2026/08/St.-Louis_-AID-Conditional-Uses.pdf
Warrenton, MOSupporting document: Cost/Benefit Analysishttps://fas.org/wp-content/uploads/2026/09/City-of-Warrenton-MO.pdf

How We Found Eight Data Center Community Benefit Agreements and Why It Matters

READ THE FULL REPORT HERE

These days, data centers are the hot-button topic in policy circles everywhere. Between the explosion of AI and the sheer scale of some of these facilities, it seems like people cannot go a single day without hearing them come up in some capacity.

Communities weighing a data center project are considering real opportunities: construction jobs, new tax revenue, and the promise of economic development that comes with a major capital investment landing in town. But they are also considering real costs. Data centers bring elevated noise, especially for homes sitting close to a facility; they also can consume significant amounts of water and energy, affecting rates and the energy grid. And the tax breaks that some of the data centers receive could outweigh any financial benefits the community gets in return. 

Local governments face a surmounting number of questions, with best practices not readily available. The policy decisions we make today will affect much of the work that comes tomorrow and the decades after that. Beginning in early 2026, FAS began interviewing experts in the field, as well as searching for executed agreements on data center developments that were difficult to find. This included tracking local government ordinances as well as finding Community Benefit Agreements (CBAs). 

Many times, the negotiations between data center developers and officials from the municipality or county are conducted behind closed doors, protected by non-disclosure agreements (NDAs). As a result, community members have significantly fewer opportunities to influence the terms by which the data center should abide by as a fixture in the community. 

In the spirit of increased transparency, FAS wants to share our experience of “flipping over rocks” and discovering the hard-to-find contract. This is how we discovered eight community benefit agreements and why it matters.

Local Policy Levers: The Ordinance and The Contract 

Generally, local governments have two enforceable levers to create policies around data centers. First, an ordinance considers issues such as zoning, land use requirements, and other permitting features – ultimately providing a pathway to allowable activities (and specific limitations). The ordinance process includes a public comment period, and it applies to all projects that qualify under the definition of a “data center.”  

A CBA involves the power of contract law, crafting and entering into binding bilateral (or sometimes multilateral) agreements that dictate the expectations of each party. CBAs are helpful in cases where existing zoning and permitting do not specifically identify “data centers” as a specific type of property to regulate (this is most frequent as the proliferation of data centers is so new). However, CBAs can be negotiated with fewer public comment opportunities, and they are required on a case-by-case basis. 

CBAs are not a new legal concept, and they have been used for large scale projects before on major development projects, like airports or energy generation infrastructure. They very recently started to be used in the context of data centers, after the explosion in usage of AI. Thus, FAS went searching for every agreement that fit the CBA model.

As of the time of this writing, only one fully executed and publicly posted CBA exists that pertains to data centers: The Lancaster AI Hub agreement entered into by the City of Lancaster, Pennsylvania and the developers of two large data center campuses in the city. Lancaster’s CBA contains many terms and conditions that are beneficial to a data center agreement with the host community. It covers community transparency, water use, energy, noise restrictions, funding for public works, decommissioning, and many more. However, this agreement appears to leave much of the substance to be decided later on. Oftentimes, it requires the parties to submit separate plans to the city which detail the specifics of how the developers will conduct themselves. 

Finding Agreements: Discovering CBAs

Finding executed CBAs took expertise, a concentrated effort, and follow-up. To expand beyond the Lancaster CBA, FAS first turned to blog posts that mentioned CBAs from sources like the Brookings Institution and Columbia University to see if there were any stories about localities that are negotiating terms with data center developers, or that have already done so. Initially, that is how FAS found Cedar Rapids, IA, St. Louis, MO, and El Paso, TX. Then, we looked for news articles referencing data center construction in these cities to see if they mentioned anything about an agreement between the city and the developers. If the terms of the agreement, or even discussion about its existence, were covered in these articles, that was where we knew we had to dig deeper. 

While the majority of agreements found were publicly available, the only way to obtain some of them was through a public records request. Thankfully, most states did not have such broad prohibitions on what can be public record, allowing FAS to uncover more contracts to serve as references. 

Over the summer of 2026, seven other agreements were uncovered besides the one in Lancaster between cities, counties, and data center developers that mention community benefits:

During the search for more agreements, FAS was making note of the trends in each one, and comparing trends among the different agreements. Many of these agreements contain a heavy focus on money and taxes. Tax abatements, exemptions, and Payment in Lieu of Taxes (PILOT) schemes served as incentives for the data centers to be built in various communities. In total, we found the following policy areas considered across multiple CBAs:

FAS’ Forthcoming Analysis + Next Steps

By putting a light on the language of multiple CBAs, we can start to understand what is commonplace, what sections need to be tailored to local needs, and where there is a need to consider more comprehensive policy requirements (e-waste, for example). In late Summer 2026, FAS will publish a report analyzing and comparing the various sections of each CBA. The report will also include a template CBA for the taking, and a summary of recent trends in local ordinances. 

In the meantime, we hope that others will continue to look for these agreements, and apply pressure to private partners in providing them. How can we have an informed debate, when we don’t know what’s on the table? 

If your community or local government has an executed CBA, please send it to metrolab@fas.org. 

This will enable us to build best practices and inform communities nationwide on how local governments are crafting policies. Every community is different, and will therefore have different needs, underscoring the necessity for thoughtful decision making, not hasty and impulsive actions. It is also imperative to learn from these early agreements. Comparing them against each other allows us to understand early norms, “extreme” ranges, and expected outcomes from various projects. And by having these baseline terms, governments can enter into agreements with data centers with a clearer sense of what can be negotiated on a local level, what is reasonable to require, which policy areas need strengthening, and how to enforce these agreements over time.

From Lab to Life: Research Questions for the Taking

For the last 4+ years, I’ve sat at the intersection of local governments and universities. That time has been used to be a convener, a communicator, and importantly, a student. These two types of institutions are critical to our communities. How do they work together? How can they support each other? How can we think differently about their relationship to one another – moving beyond big employers and land users to thinking about the fruits and labors of what the research community can do for local policy making. 

From my personal experience and that of my time at MetroLab, one thing was clear: we need to focus on the demand and supply for research to the local government community. While well intended, much of the research community assumes what local governments need. How can we break these assumptions and understand what the true research needs are for cities and counties across the country? 

Inspired by the annual Administration Research and Development Budget Priorities issued by the White House Office of Science and Technology Policy, MetroLab envisioned an opportunity for a priority research needs document that is informed by, and in the service of, local governments. 

This effort came with ambitious goals. First, it needed to represent local governments across the country. To do this, we knew we had to have a breadth of scale; we needed to talk to folks inside local governments that “live in the weeds.” We knew that it was important to get the perspective of local governments across all geographies with varying priority concerns and varying levels of resources. In-person workshops were a must to meet the community where they are.

Next, it needed to make sense to the research community. Each in-person workshop was hosted on a university campus. Every single research question that resulted from the workshops or the surveys has been reviewed to be presented in a way that can easily shape a research project or program. 

We set out to work, hosting workshops and surveys. At our in-person workshops across the country we had a total of 42 universities represented, 12 local governments (with 85 unique departments represented in total). We recovered hundreds of Post-it notes and created a master database of over one thousand research questions or points of feedback.

With gratitude and enthusiasm, we are publishing the results. In total, FAS is publishing nineteen reports, including the overarching findings  – The Civic Research Agenda. 

7 POLICY SPECIFIC RESEARCH AGENDAS9 CITY/COUNTY SPECIFIC SCIENCE R&D REPORTS1 RESEARCH TO-IMPACT-REPORT
HousingCity of Allentown, PAThe Research-to-Impact Ecosystem: Perceptions, Barriers, and Recommendations
Economic DevelopmentCity of Baltimore, MD
Human ServicesCity of Columbus, OH
Climate and EnergyGuilford County, NC
TransportationCity of Houston, TX
Community EngagementCity of Kansas City, MO
Service DeliveryCity of Lincoln, NE
City of Little Rock, AR
City of Syracuse, NY

Importantly, we learned more than just research questions. We studied how these institutions work together, what are friction points, and how transformative partnerships thrive between the research and local policy making communities. 

For example, we asked folks for both institutions, what myth do you want to bust? And this is what we found: 

Myths local governments would like to “bust” – in other words, statements they believe university communities believe but are untrue –include the following:

  1. [21%] that local governments have a lot of money available, are themselves adequately resourced, and have ample time to read large amounts of research
  2. [20%] that local government staff are uninformed, not smart, or not resourceful
  3. [16%] that local government staff lack motivation, are lazy or don’t care, and want to preserve bureaucracy
  4. [13%] that local governments cannot innovate and adapt
  5. [13%] that local governments are hard to work with, and in particular, they resist academic insight
  6. [6% ] that local governments are not data-driven 

Generally, local governments aimed to position themselves as capable partners, and to correct structural misconceptions. 

Myths universities would like to “bust” – in other words, statements they believe local government communities believe but are untrue include the following:.

  1. [25%] that universities are elite; faculty live in an ivory tower
  2. [19%] that universities produce research that is impractical, only theoretical, or not client-driven
  3. [15%] that universities only care about publishability, and faculty/staff do not care about their community
  4. [11%] that universities are slow, research takes a long time, and they can’t work quickly
  5. [11%] that universities have a lot of money and funding is not constrained
  6. [11%] that research only takes into account quantitative data

Almost half of all responses indicate that faculty and staff at a university feel they are perceived as detached, selfish, or difficult partners. University participants wanted to convey to the audience that research is indeed useful, applied work matters, and that research is impact-oriented.

Why does this matter? It’s a foundation on which to build. Bringing two institutions together should include the following considerations: how do you know who to talk to, what are the levels of trust to work together, and how do you consider potential road blocks from the start. 

Recommendations

First, the primary goal of this report is to provide to the research community these questions that are in demand by local governments. But that is just the start. They must then get answered, and they have to be produced in a way that optimizes  the “supply” of research – will research publications be applied. 

Some top findings on how local governments want to ingest research: 

One hundred percent of respondents cited that a concise summary of results that is easy to understand is very important or important. No more than one page and no technical jargon.

One hundred percent of respondents also cited that research needs to be as specific to their community as possible. 

Local governments almost always want to see a comparison to their peer cities/counties.

As appropriate, research that goes beyond observation and makes recommendations is highly actionable. 

I’m going to say this again. ONE PAGE. Executive summary no more than one page. I know. Not the easiest. 

What’s Next

I hope these research questions get answered. Imagine the world of what’s possible if these questions are addressed. If these knowledge gaps close. We could have increased housing supply, understand the impacts of our policy interventions, and can do more with less.

The Civic Research Agenda considers civic research as infrastructure. Treating the pipeline as civic infrastructure means making collaboration predictable and durable. It could include elements such as:

These are solvable problems. If local governments and universities can commit to creating and maintaining the coordination and collaboration required, we can unlock policy innovation for communities across the country, starting at the state and local levels. 

This report is a roadmap that will move further the theory of change that our research ecosystem has a bounty of insights and policy interventions, and when done in partnership with local innovators, catalytic impact is in our grasp. 

FAS looks forward to continuing this work, and hopefully, bringing research problem statements and answers to communities across the country.

Feedback from Community Leaders

“As Kansas City’s top research university, the relationship between UMKC and the City of Kansas City is vital,” said UMKC Chancellor Mauli Agrawal. “When we closely collaborate with the community, we’re able to align UMKC’s advanced innovation capabilities with the city’s needs, ensuring that the solutions we generate have a direct, positive impact on the quality of lives of our residents. It’s important to note that our university’s community partnerships are not just about advancing academic inquiry — they are about building a stronger, more resilient Kansas City.”

“If we want to make positive, lasting progress on the most pressing challenges facing our cities—from gun violence and homelessness to transportation and traffic safety—we must be able to access and understand cutting-edge research and innovation,” said Kansas City Mayor Quinton Lucas. “MetroLab is working to make it possible for policymakers across the nation to influence the creation and pioneer the implementation of evidence-based solutions and research to help us build more equitable and thriving communities.”

“The City of Lincoln welcomed the opportunity this convening presented to catalyze our research partnership with the University of Nebraska-Lincoln. Following the workshop, we have continued to collaborate with UNL to develop the City’s Research Agenda.” – Mayor Leirion Gaylor Baird, Lincoln, NE

“Research is essential to us. We hosted six university institutions at our workshop and are keen on continuing these conversations. We want to have the data to provide tailored solutions to each of our individual neighborhoods, we want to know what programs get the best outcomes, and we hope to partner with our universities to better our evaluation capabilities so that we know what’s working and what needs to be improved.” – Mayor Matt Tuerk, City of Allentown, PA

“The event was a huge success, not only because it was well-attended and well-run, but because the participants responded with action.” – Dr. Ruth N. López Turley, Director, Kinder Institute for Urban Research

Local Government Research Needs Revealed in The Civic Research Agenda, a New Report Published by the Federation of American Scientists

Report provides research questions and calls to action that bring science closer to local communities

Washington, D.C. – April 7, 2026 – Today the Federation of American Scientists (FAS), a non-partisan, nonprofit science policy organization dedicated to developing evidence-based policies to address national challenges, released a long-anticipated report, The Civic Research Agenda: A national study of local government research needs and roadmap for university collaboration.

“Local governments are a juggernaut of policy delivery. The Civic Research Agenda underscores that giving cities and counties more ways to access the best and most relevant research produced by technical experts is crucial to driving that progress. Deeper connections between universities and local governments can unlock innovations from the mundane to the monumental,” says Dr. Jedidah Isler, Chief Science Officer at FAS. “Not only does this report include 432 research questions, it provides recommendations on how we can improve the actionability of research into communities.”

In addition to the Civic Research Agenda, this effort also produced seven (7) priority policy research agendas, one (1) Research-to-Impact Ecosystem report, and nine (9) city-specific science R&D reports.

“We know that science and research can bring catalytic impact to local policy making. Publishing an agenda to the university community breaks down the myths and assumptions of true knowledge gaps and research needs. Communities stand to benefit directly from the calls to action cited in this report.” says Kate Garman Burns, Director of State and Local Innovation at FAS.

Key Findings

The number one research need of cities and counties concerns housing. 

The other priority areas of research needs include: community engagement, economic development, service delivery, climate and energy, transportation, and human services (education, public safety, and health). 

Incorrect perceptions are stalling trust between these institutions. University faculty and staff fear being seen as too intellectual and disconnected. Local government staff fear being seen as not intellectual enough. 

Beyond any specific policy domain, local governments expressed the desire for support from the research community in three overarching areas: 1) evaluation; how can the research community measure and provide evidence that a policy intervention has achieved desired (or negative) impacts; 2) efficiency; how can the research community help local governments do more with less; and 3) data generation; how can the research community create and provide access to useful data that do not currently exist. 

“The City of Lincoln welcomed the opportunity this convening presented to catalyze our research partnership with the University of Nebraska-Lincoln. Following the workshop, we have continued to collaborate with UNL to develop the City’s Research Agenda.” – Mayor Leirion Gaylor Baird, Lincoln, NE

Tracking the Demand and Supply of Research

The Civic Research Agenda considers the demand and supply of research: what are the research needs of local governments, and how can research outputs improve to “supply” or provide answers to better serve that audience?  FAS’s State and Local Innovation team hosted nine (9) in-person workshops in cities/counties across the country, and partnered with the National League of Cities and Porchlight Insights to produce two (2) national surveys.

“Research is essential to us. We hosted six university institutions at our workshop and are keen on continuing these conversations. We want to have the data to provide tailored solutions to each of our individual neighborhoods, we want to know what programs get the best outcomes, and we hope to partner with our universities to better our evaluation capabilities so that we know what’s working and what needs to be improved.” – Mayor Matt Tuerk, City of Allentown, PA


###

ABOUT FAS

The Federation of American Scientists (FAS) works to advance progress on a broad suite of contemporary issues where science, technology, and innovation policy can deliver transformative impact, and seeks to ensure that scientific and technical expertise have a seat at the policymaking table. Established in 1945 by scientists in response to the atomic bomb, FAS continues to bring scientific rigor and analysis to address national challenges. More information about FAS’s work at fas.org.

The State and Local Innovation (formerly, MetroLab) team within FAS aims to take good ideas from the lab to local governments through intentional, regular and impact-driven policy alignment. This mission is two-fold: to put science in cities and to understand, support, and enable transformative partnerships between cities and universities. More information about the State and Local Innovation team’s work at https://fas.org/issue/metrolab/.