Clean Energy

DOE 4.0: Rethinking Program Design for a Clean Energy Future

01.26.26 | 27 min read | Text by Alice Wu & Addy Smith & Megan Husted

DOE’s mission and operations have undergone at least three iterations: starting as the Atomic Energy Commission after World War II (1.0), evolving into the Department of Energy during the 1970s Energy Crisis to focus on a wider range of energy research & development (2.0), and then expanding into demonstration and deployment over the last 20 years (3.0). The evolution into DOE 3.0 began with the Energy Policy Act of 2005, which authorized the Loan Programs Office (LPO), and accelerated with the infusion of funding from the American Recovery and Reinvestment Act of 2009. Finally, the Bipartisan Infrastructure Law (BIL) and the Inflation Reduction Act (IRA) crystallized DOE 3.0’s dual mandate to not only drive U.S. leadership in science and technology innovation (as under DOE 1.0 and 2.0), but also directly advance U.S. industrial development and decarbonization through project financing and other support for infrastructure deployment.

While DOE continues to support the full spectrum of research, development, demonstration, and deployment (RDD&D) activities under this dual mandate, the agency is now undergoing another transformation under the Trump administration, as a large number of career staff leave the agency and programs and budgets are overhauled. The Federation of American Scientists (FAS) is launching a new initiative to envision the DOE 4.0 that emerges after these upheavals, with the goals of identifying where DOE 3.0 missed opportunities and how DOE 4.0 can achieve the real-world change needed to address the interlocking crises of energy affordability, U.S. competitiveness, and climate change. 

Crucial to these goals is rethinking program design and implementation to ensure that DOE’s tools are fit for purpose. BIL and IRA introduced new types of programs and assistance mechanisms, such as Regional Hubs and “anchor customer” capacity contracts, to try to meet the differing needs of demonstration and deployment activities compared to R&D. Some were a clear success, while others faced implementation challenges. At the same time, the majority of funding from these two bills was still implemented using traditional grants and cooperative agreements, which did not always align with the needs of the commercial-scale projects they sought to support. Based on lessons learned from the Biden administration, this report provides recommendations to DOE to improve the implementation of different types of assistance and identifies opportunities to expand the use of flexible and novel approaches. To that end, this report also advises Congress on how to improve the design of legislation for more effective implementation.

The ideas and insights in this report were informed by conversations with former DOE staff who played a role in implementing many of these programs and experts from the broader clean energy policy community.


Distribution of BIL and IRA Funding

Before diving into program design, it’s helpful to first understand the range of technologies and activities that BIL and IRA programs were meant to address, especially where that funding was concentrated and where there may have been gaps, since programs should be tailored to the purpose.

Authorizations and Appropriations

Congress intentionally provided the lion’s share of BIL and IRA funding to demonstration and deployment activities. The table above shows the distribution of BIL and IRA authorizations and appropriations for DOE. The table excludes DOE’s revolving loan programs – the Tribal Energy Financing Program (TEFP), the Advanced Technology Vehicles Manufacturing Loan Program (ATVM), the Title XVII Innovative Energy Loan Guarantee Program (Title 1703), the Title XVII Energy Infrastructure Reinvestment Financing Program (Title 1706) – which are discussed in the following section.1 The Carbon Dioxide Transportation infrastructure Finance and Innovation program (CIFIA) was included in the table above because that program’s appropriations could be used for both grants and loan credit subsidies. 

The technology areas that received the most DOE funding from BIL and IRA (excluding loans) were building decarbonization, grid infrastructure, clean power – combining solar, wind, water, geothermal, and nuclear power, energy storage systems, and technology neutral programs – carbon management, and manufacturing and supply chains, which each received over $10 billion in funding. 

Below is a breakdown of the funding distribution for each sector/technology. 

Grid Infrastructure received a total of $14.9 billion, second only to building decarbonization. All of the funding went towards demonstration and deployment programs, the majority ($10.5 billion) of which went towards the Grid Resilience and Innovation Partnerships (GRIP) program. The remainder of the funding went towards Grid Resilience State and Tribal formula grants, the Energy Improvement in Rural and Remote Areas, Transmission Facilitation Program, and transmission siting and planning programs. No funding went to R&D or workforce programs. Grid infrastructure was also eligible for the Title 17 and Tribal loans programs.

Power Generation received a total of $13.2 billion, with funding unevenly distributed across technologies and stages of innovation. Nuclear power received the largest share, with over $9.2 billion allocated to the Advanced Reactor Demonstration Program and the Civil Nuclear Credit Program, supporting demonstration of advanced reactors and production incentives to maintain existing nuclear plants, respectively. Geothermal energy received the least funding among power generation technologies, with only $84 million allocated to the Enhanced Geothermal Systems (EGS) Demonstration Program and no other support for R&D or deployment. 

Modest amounts were provided for RD&D in solar ($80 million), wind ($100 million), and water power technologies ($146 million). For deployment, hydropower also received production and efficiency incentives to support existing facilities ($754 million); wind energy received funding for Interregional and Offshore Wind Electricity Transmission Planning and Development ($100 million); and solar qualified for the Renew America’s Schools program ($500 million). To complement these technologies, $505 was provided for energy storage demonstration programs to enable reliable deployment of variable renewables. 

Power generation was also eligible for the Title 17 and Tribal loan programs.

Manufacturing and Supply Chains received $10.8 billion in funding from BIL and IRA. The majority of that funding, $6.3 billion, went towards battery supply chains, primarily for the Battery Materials Processing Program ($3 billion) and the Battery Manufacturing and Recycling Program ($3 billion). Additional focus areas for funding included EV manufacturing ($2 billion), advanced energy manufacturing and recycling ($750 million), high-assay low-enriched uranium (HALEU) supply chains for nuclear power plants ($700 million), and heat pump manufacturing ($250 million). Energy manufacturing and supply chains are eligible for Title 1703 loans, while EV and battery manufacturing and supply chains are eligible for ATVM loans. 

Critical Minerals received a total of $6.9 billion, of which $6 billion was allocated for the Battery Materials Processing Program and the Battery Manufacturing and Recycling Program, which funded demonstration and commercial-scale critical minerals processing and recycling projects. The remainder of the funding went to R&D programs on mining, processing, and recycling technologies; technologies to recover critical minerals from coal-based industry, mining and mine waste, and other industries; and technologies that use less critical minerals or replace them with alternatives. Critical minerals were also eligible for all of DOE’s revolving loan programs, except for CIFIA.

Industrial Decarbonization and Efficiency received a total of $7.5 billion. Six ($6.0) billion of this funding went towards the Industrial Demonstrations Program (IDP), which was sector and solution agnostic and accepted projects for both new facilities and retrofits, making the money extremely flexible. Much smaller funding amounts were allocated to deployment and workforce programs like rebates for energy efficient technologies and systems, decarbonizing energy manufacturing and recycling facilities, and Industrial Training and Assessment Centers. No funding was allocated to R&D programs. 

Hydrogen and Clean Fuels received $8 billion for the Regional Clean Hydrogen Hubs program to support near-term demonstration and commercialization of hydrogen production, transportation, and usage. Hydrogen and clean fuels were also eligible for all of the loan programs, except for CIFIA. Investment across the full research-to-deployment (RDD&D) continuum was lacking. Dedicated funding for clean fuels besides hydrogen was also missing. 

EVs and Transportation funding from BIL and IRA was largely focused on light-duty personal EVs. By contrast, investments in medium- and heavy-duty vehicles and urban transportation were limited. 

EV manufacturing and supply chains received $8.3 billion in funding. The largest single allocations went to the Battery Materials Processing and Battery Manufacturing & Recycling Programs ($6 billion), strengthening domestic battery supply chains for EVs. Domestic Manufacturing Conversion grants ($5 billion), further supported downstream manufacturing of advanced EV technologies. Additional funding supported R&D for battery recycling and second-life applications. EV and battery manufacturing were also eligible for ATVM loans. 

A notable new focus for DOE under BIL was the deployment of EV charging infrastructure. Charging infrastructure was eligible for $1.05 billion in DOE funding through the Renew America’s Schools program and the Energy Efficiency and Conservation Block Grant Program. DOE played a key role in the Joint Office of Energy and Transportation’s implementation of the National Electric Vehicle Infrastructure (NEVI) Formula Program, funded by DOT ($5 billion), and other charging programs. This marks a shift from DOE’s previous focus on developing vehicle technologies and fuels to a broader focus on all of the technology and infrastructure needs for widespread EV adoption. 

Building Decarbonization and Efficiency received the most non-loan funding from BIL and IRA at $15.2 billion. The largest share of this funding, $12 billion, went towards deployment and affordability programs such as the Home Energy Efficiency Rebate Program, High-Efficiency Electric Home Rebate Program, and the Weatherization Assistance Program – all of which aim to reduce energy costs for low-income households by increasing the energy efficiency of their homes. Additional funding supported workforce training and the improvement of building codes. Little to no funding went to R&D and demonstration programs, signaling the relative maturity of building decarbonization and efficiency technologies compared to other sectors. District heating and cooling facilities are eligible for TEFP loans. 

Carbon Management received a total of $11.6 billion. The majority of the funding went towards demonstration and deployment activities, of which $2.1 billion went towards CIFIA to support the deployment of transportation infrastructure, $2.5 billion went towards carbon storage validation and testing, $3.0 billion went towards carbon capture pilots and demonstrations, and $3.5 billion went towards the development of Regional Direct Air Capture (DAC) Hubs. Carbon management was also eligible for loans from the Title 17 programs. 

Loans

DOE’s loan programs operate differently from the way authorizations and appropriations work for traditional assistance programs, which is why they are not included in the chart above. These programs receive both a certain amount of loan authority, which set limits on the size of their portfolios, and appropriations for program administration and credit subsidies, which allows the office to provide low-cost financing. The IRA appropriated $13.8 billion total for these four programs and provided an additional $310 billion in loan authority for Title 1703, Title 1706, and TFP. CIFIA was established in the IRA without a cap on its loan authority. The IRA also repealed the cap on ATVM’s loan authority, which remains uncapped.2

During the four years of the Biden administration, the Loan Programs Office (LPO), now renamed the Office of Energy Dominance Financing (EDF), issued a total of 24 loans and 28 conditional commitments, worth over $100 billion in total. Energy storage, battery manufacturing, clean power, and the grid received the greatest number of loans and conditional commitments, while nuclear energy, carbon management, and non-battery or EV manufacturing received the least. No loans were issued for CIFIA, which is why that program is not shown in the following figures.


Program Design & Implementation

Flexible Contracting Mechanisms: Grants vs. Other Transactions

The majority of BIL and IRA funding (excluding loans) was implemented in the form of grants and cooperative agreements governed by 2CFR 200 and 2CFR 910. Even for programs for which the legislation did not specify the exact type of assistance mechanism that DOE should use (i.e., unspecified or “financial assistance”), the agency largely defaulted to those grants and cooperative agreements. One argument for this approach was that program officers and contracting officers are trained and experienced in using these mechanisms, which may have helped programs deploy faster. 

However, these grants were originally designed for R&D programs and faced some drawbacks when used for demonstration and deployment programs. 2CFR 200 and 2CFR 910 are almost 200 pages long, requiring extensive compliance that smaller organizations and organizations new to federal applications may not be equipped to navigate. Additionally, some terms and conditions required by those rules (e.g. for intellectual property, real property, and program income) were not compatible with private sector needs for demonstration and commercial-scale projects. Most consequentially, they require a termination for convenience clause, which allows the government to cancel an award without providing a reason. The Trump administration is now using that clause to terminate awards. 

Alternatively, DOE could have more frequently used its Other Transaction Authority (OTA) to enter into contracts without 2CFR regulations, allowing the agency to negotiate contracts more like the private sector would, developing terms and conditions as they make sense for the purpose of the specific purpose. This can enable DOE to design and implement more creative arrangements, such as for demand-pull or market-shaping mechanisms. DOE could have also leveraged OTs to make process improvements, rethink the traditional solicitation and evaluation process, and potentially accelerate implementation.3

DOE 3.0 missed a major opportunity to leverage these benefits of OTs. The few exceptions were the Hydrogen Demand Initiative (H2DI), the Advanced Reactor Demonstration Program, and Partnership Intermediary Agreements. Towards the end of the Biden administration, DOE discussed transitioning some of OCED’s awards to OT agreements, but did not get a chance to follow through before the presidential transition.4

DOE 4.0 should pick up where DOE 3.0 and deploy OTs more broadly among demonstration and deployment programs to overcome the challenges of traditional financial assistance regulations and processes. Congress should ensure that future authorizing legislation is designed to enable this flexibility–for example, by not specifying the type of assistance that DOE should use to implement new programs. 

Flexible Funding

BIL and IRA authorized and appropriated funding for a wide range of programs, many with very specific goals and eligible uses. That approach allows Congress to provide detailed direction to DOE on legislators’ priorities. However, DOE should also be able to respond dynamically to industries and markets as they develop. For example, when BIL and IRA were being developed, next-generation geothermal technologies were still quite nascent and received very little funding from these bills. Within two years though, the technology rapidly advanced, thanks to the success of the first few demonstration projects, and now shows enormous potential for meeting clean, firm energy demand, but DOE has limited funding available to support the industry.

In future legislation, Congress should consider establishing a few flexible funding programs that would give DOE a greater range of options to support the development of energy technologies and infrastructure as the agency’s experts know best. This could look like a pooled pot of funding with broad authority for DOE to use across technologies and/or activities, such as a single fund for demonstration and deployment activities broadly, or a single fund for grid infrastructure needs. If Congress is wary about this, legislators could start with creating flexible funding programs designed to fit within the scope of a single DOE office, before testing programs that cross multiple offices, which may come with intra-agency coordination challenges.

Program Design: Regional Hubs

The Hydrogen Hubs and Regional Direct Air Capture (DAC) Hubs were a new type of program established by BIL, designed to fund clusters of projects located in different regions rather than individual, unrelated projects. BIL invested $7 billion and $3.5 billion in these programs, respectively, and they made some of the largest awards by dollar amount – on the order of $1 billion per award – out of all of the BIL and IRA programs. 

The hub approach aimed to foster an industrial ecosystem, including not only multiple projects aiming to deploy the technology, but also future suppliers, offtakers, labor organizations, academic partners, and state, local, and Tribal governments. Concentrated regional investment and greater coordination would not only accelerate commercialization of hydrogen and DAC technologies but also help distribute the benefits of new clean energy industries across the nation. 

Due to the ambitious size and complexity of their goals, the Hydrogen Hubs and DAC Hubs required, and still require, a long timeline to develop. The structure and oversight DOE applied to the hub development process also extended timelines further. When the Trump administration began re-evaluating Biden-era programs and Congress started looking for funds to rescind, these two programs became appealing targets because of the large amount of funding they held and the lack of on-the-ground deployment progress – even though that was to be expected based on the program timeline.5 

Project cancellations and funding rescissions are a massive waste of both federal and private sector resources. In the future, before creating any other large-scale programs modeled on the Hydrogen Hubs and DAC Hubs, policymakers should first determine whether there is long-term bipartisan commitment to the program’s goals to avoid the possibility that a change of administration will jeopardize the program. If that commitment isn’t guaranteed, this model may simply be too risky to use; other types of assistance may be easier to implement or more resilient to changes in administration.

An alternate regional hub model that Congress and DOE could consider is the CHIPS and Science Act’s Regional Technology and Innovation Hubs and NSF Engines. These programs had a much lower level of ambition, providing awards – on the order of tens of millions instead of one billion – to seed early-stage innovation, build a research ecosystem, and support workforce development, rather than deploying specific technologies. 

Program Design: Demand-Pull 

Demand-pull mechanisms have emerged in conversations between FAS and former DOE staff as a very underutilized but promising tool for enabling the scaling and deployment of clean energy technologies and large-scale infrastructure projects. Confidence in long-term offtake is a requirement for private lenders to provide financing at a viable rate for projects. DOE can help provide that certainty through a wide range of tools, including purchase commitments and capacity contracts, contracts-for-difference, and other financial arrangements. 

By unlocking private sector investment, demand-pull mechanisms can reduce or eliminate the need for DOE to provide additional financing for project construction. However, public sector funding is still useful for pre-construction stages of project development, such as planning, siting, and permitting, which can be hard to get private sector financing for when other risks to a long-term revenue model have not been addressed yet.  

There are three primary use cases for demand-pull mechanisms: building shared infrastructure, demonstrating innovative technologies, and expanding industrial capacity. 

Shared infrastructure projects require a large number of customers and can sometimes struggle with securing them: customers are afraid to commit without the developer demonstrating that they’ve secured other customers first. DOE can help address this challenge by serving as an anchor customer for these projects and help attract additional customers. This also makes it easier to finance the project. 

A successful example of this from BIL is the Transmission Facilitation Program, which authorized DOE to purchase up to 50% of the planned capacity of large-scale transmission lines for up to 40 years. Once the transmission line is built, DOE can then sell capacity contracts to actual customers who need to use the transmission line and recoup the agency’s investment. This approach could be used for other types of shared infrastructure, such as hydrogen or carbon dioxide transportation, or even large clean, firm power plants (e.g., nuclear) for their generation capacity. 

First-of-a-kind projects often struggle to secure offtakers due to the unproven nature of their technology and the lack of a pre-existing market. For example, H2DI was designed to complement the Hydrogen Hubs program by directly supporting demand for select hydrogen producers and also helping establish a transparent strike price for the nascent market that would benefit all hydrogen producers. Other demonstration programs (e.g. IDP) would have also benefited from DOE support for demand and market formation.

Lastly, the development of new industrial capacity for producing energy technologies and their inputs can also face demand challenges because while there may be a pre-existing global market, the domestic market may be small or nonexistent, and existing offtakers may not be willing to reroute their supply chains without market or policy pressure to do so. This was most obvious with the critical minerals and battery supply chain projects that DOE tried to support. 

One successful model from the IRA was the HALEU availability program. DOE set up indefinite delivery, indefinite quantity contracts with companies developing HALEU production capacity and set aside $1 billion to procure HALEU from the five fastest movers. The purchase commitment created demand certainty, while the competitive model incentivized faster project development and ensured that the DOE’s funding would only go towards the most viable projects. More programs like this would be transformative for domestic supply chain development.

In designing demand-side support programs for these latter two categories, DOE must tailor the programs to the unique challenges of different technologies or commodities, and whether or not there are additional goals of domestic market formation and/or market stabilization. For example, auctions are a great tool for price discovery, while contracts-for-difference can help projects hedge against price volatility and overcome domestic price premiums. 

There are also double-sided market maker programs where DOE serves as an intermediary between producers and buyers, entering into long-term offtake commitments with project developers up front to provide demand certainty, and then reselling the product to buyers on a shorter-term basis when the project comes online This helps make supply chain connections and address mismatches between project developer vs. buyer timelines. For example, for low-carbon cement and concrete, buyers typically procure building materials on a short-term basis as needed for each project, but developers of first-of-a-kind production facilities require long-term offtake commitments in order to secure project financing.

Authorizing language and/or appropriations can be a barrier to DOE using demand-pull mechanisms. To address this issue, Congress should factor the following considerations into the design of legislation:

  1. Flexible Authorities. Due to the variety of demand-pull mechanisms and the need to tailor them to the unique market challenges of different technologies or commodities, they are best implemented using OT agreements. Statutory language that prescribes the exact type(s) of assistance (e.g., grants) for a program can prevent DOE from using demand-pull. Instead, Congress should provide clear goals for a program to achieve and leave DOE with the flexibility to determine the best type of assistance mechanism. 
  2. Budget Scoring and Timelines. Demand-pull mechanisms often involve multi-year advance commitments of funding, but the exact amount and timing of transactions may be uncertain, since it is conditional upon project performance and overall market conditions (e.g. contracts-for-difference payments are based on the market price at the time of the transaction). This results in budget scoring issues. Legally binding commitments of money can typically only be made if the agency has enough funding to obligate the full amount of the contract when it is signed, even if that funding probably won’t be paid out until much later.6 This results in the need for a significant amount of upfront funding, which can be difficult to obtain from Congress, and long timelines before the outcome of that funding is fully realized, which can make it difficult to manage congressional expectations. These long timelines also mean that no-year funding is ideal for DOE to be able to run demand-pull programs without the funding expiring.7
  3. Revenue Management. Some demand-pull mechanisms are designed with the potential for revenue generation, so legislation should ideally be designed to include the authorization of a revolving fund to allow revenue to be reused for program costs. Alternatively, DOE may contract with an external entity to manage the program funds, as it did with H2DI, so that the revenue can stay with the partner entity and be reused. 

Program Design: Prizes

Unlike most financial assistance, which operates on a cost-reimbursement basis and requires cost-share, prizes reward performance and are awarded after activities are completed and criteria have been met. This means there are no strings attached to the funding and no IP requirements, making these programs easier for applicants to work with.8 Prizes are also of a fixed amount, which incentivizes innovators to find least-cost solutions in order to maximize revenue from the award. On the flip side, innovators are responsible for any cost overruns, and DOE is not required to shoulder that risk. 

In the past DOE has used prizes wrongly to try and reach potential applicants that struggle with the application process for traditional assistance. It’s important to keep in mind the best use cases for prize programs. For example, prize programs rely on clear milestones, but are agnostic on the approach, making them great for interdisciplinary innovation. They can be beneficial for incentivizing new innovators to get involved with problem areas that don’t have many pre-existing solvers. They are also well-suited for small dollar amount awards that otherwise may not be worth the administrative overhead, since the overhead costs for prize programs are lower than traditional assistance programs once they have been designed.

Moving forward, DOE should keep in mind best practices for designing equitable prize programs. Prize programs should ideally be designed as stage-gated competitions with incremental prize payments for each phase, rather than one big payment at the end, so that innovators with fewer financial resources can participate. For example, the first stage could be the submission of a whitepaper with a proposed plan for developing and testing the technology, then the second stage could be lab work, and so on. Participants would be whittled down between each stage to hone in on the most competitive projects.

Program Design: Loans

DOE 4.0’s loan programs could be improved by setting clearer expectations on risk, clearer guidance on State Energy Financing Institution (SEFI) projects, and a strategy for using additional tools such as equity. 

Risk Tolerance. Discrepancies between statutory language and congressional oversight for DOE’s loan programs have historically made it difficult for the agency to determine the right balance of risk. For example, Title 1703 is designed by legislation to fund innovative, higher-risk, hard infrastructure projects that the private sector is typically reluctant to fund. A high-risk, high-reward program should, by nature, be allowed to have some failed projects and still be considered a success. However, Congress has historically been extremely critical of any defaulted loans, making DOE hesitant to use Title 1703 and ATVM to its full potential.

DOE 3.0 made some attempts to improve communications on its approach to risk management, but the agency could do more to communicate the success of its loan programs. Congressional authorizers should help the agency by building risk into the statute of DOE’s loan programs and budgets and better managing the expectations of oversight members.

State Energy Financing Institution (SEFI) Projects. Another area of reform that DOE 4.0 should tackle is the SEFI-supported projects under Title 17, authorized by BIL, which allows DOE to finance any energy project that also receives “meaningful financial support” from a SEFI, such as state energy offices or green banks. However, ambiguity in the statute behind this new carveout caused confusion among states on how exactly to partner with DOE’s loan program. What is considered meaningful financial support? What qualifies as a SEFI? To clarify these questions from states, either DOE 4.0 should create model SEFI guidance or Congress should amend the statute with clear definitions. 

Equity and Other Financing Tools. The Trump administration’s restructuring of the Lithium Americas Thacker Pass loan to include an equity warrant, which gives DOE the right to acquire equity of the company at a set price in the future, has raised questions as to what DOE’s role should be if it were to become an equity owner in a company and what guardrails and visibility is needed in such a scenario.9 Policymakers may also want to consider the risks and benefits of expanding DOE’s loan program authorities to include direct equity investments and other financing tools that agencies like the International Development Finance Corporation (DFC) have access to.10

Program Design: Technical Assistance

DOE 4.0 should expand its technical assistance offerings in three primary ways: technical advising and verification, navigating federal funding, and talent and workforce needs.

Technical Advising and Verification. DOE’s in-house scientific and engineering expertise is a major draw for funding applicants. For example, according to FAS conversations with former agency staff, the project developers behind Vogtle Units 3 and 4, which received a loan guarantee from DOE, would seek advice from LPO engineers when they had engineering questions. Private investors, who may lack the expertise needed for technical due diligence, often use DOE awards as a proxy for assessing project risk. As a result, some project developers will apply for DOE funding to prove their credibility to private financiers and negotiate lower financing rates. 

In the face of potential budget cuts, DOE 4.0 could leverage this strength by offering project certifications that would entail the same technical support and verification as a demonstration award or loan, without the funding support. This would provide a similar market signal to private investors, without costing DOE as much – just staff time. And since DOE is not taking on any project risk, the application and negotiation process could also be simplified and streamlined to align better with private-sector timelines. 

Navigating Federal Funding. DOE should dedicate increased resources to conducting outreach to underserved communities, small businesses, innovators, and new applicants about funding opportunities and shepherding them through the application process. For example, despite awareness of available funding opportunities, some Native American tribal organizations in Alaska were unable to pursue them due to a lack of bandwidth or expertise to participate in resource-intensive (and often times confusing) application processes, and the awards sizes were too small to make them worth the costs of external private consultants to support. Community Navigator Programs and other forms of technical assistance could help communities overcome these barriers to accessing federal support. PIAs can also help with reaching small businesses and new applicants to apply for programs.

Talent and Workforce Needs. DOE has had success with placing talent at state energy offices and other critical energy organizations like public utility commissions through the Energy Innovator Fellowship to embed expertise in under-resourced offices. DOE should consider expanding this program or establishing new programs to place experts at other institutions, such as grid operators, investor owned utilities, and local governments, to advise and support them in adopting new energy technologies and accelerating infrastructure deployment. 

Program Design: Community Benefit Plans

For all of its demonstration and deployment programs, DOE 3.0 introduced a new requirement that awardees create community benefit plans (CBPs) to ensure that communities would share in the benefits of local clean energy projects. CBPs have been both lauded and criticized by community and labor organizations: they praised their intent, but expressed frustration over their limited influence on companies’ plans and that allowable cost limits constrained what could be included in awards. Where CBPs were most effective, they encouraged developers to consider local communities and jobs, though this often required significant internal coordination to use DOE’s funding contracts as leverage. At the same time, CBPs were seen as an additional administrative burden on program implementation, contributing to delays. Under the Trump administration, CBPs will no longer be enforced and are no longer required for future funding opportunities. 

DOE 4.0 presents an opportunity to restore and improve CBPs as a mechanism for both distributing the benefits of federally-funded projects and improving project quality. To maximize impact, DOE 4.0 should focus on a smaller set of high-priority outcomes with clear, measurable success metrics. DOE 3.0’s broad mandate, which spanned jobs, justice, climate, and deployment across multiple programs, sometimes diluted effectiveness and created confusion for staff managing both program design and operations. In DOE 4.0, these outcomes should be closely linked to actual project success, whether through facilitating social license to ease permitting, or supporting workforce development to train and retain workers, as developers themselves emphasized when aligning with program goals. Providing actionable guidance, including templates and real-world examples of successful community benefits plans, can further improve project outcomes. The advocacy community can help lay the groundwork for DOE 4.0 by documenting successful case studies and model agreement language. Congress could help embed key priorities in statute, providing clear, practical guidance that reflects DOE’s administrative capacity and enhances the likelihood of successful implementation.

Additionally, it is critical that future CBP mechanisms account for community preferences, including local prohibitions on certain technologies and other expressions of community priorities. By proactively respecting local concerns, DOE can foster trust and strengthen the long-term impact of projects. DOE 4.0 will also need to navigate tensions around labor preferences. While the department cannot explicitly require union labor, questions about labor practices may signal preferences that vary across states, including right-to-work contexts. This underscores the importance of sensitivity to local norms and expectations.

Where resources allow, DOE 4.0 should hire and dedicate staff with expertise in labor engagement and community partnerships to review applications and provide technical assistance, supporting applicants in navigating the CBP process and designing high-quality, community-centered projects. Technical assistance needs to be done carefully though to avoid perceptions of bias and influencing the award selection process. 

Lastly, clear and consistent guidance across DOE offices is essential. For example, applicants have reported a lack of clarity about what activities qualify as “allowable costs” in CBPs, and different offices have applied inconsistent standards. Establishing a unified, expansive approach to allowable costs—including activities that indirectly support clean energy workforce development, such as community child care programs—can unlock transformative opportunities for local communities. This standardization should be done for other aspects as well. In general, official guidance needs to find a better middle ground between the overly technical, lengthy documents and vague webinars produced by DOE 3.0, so that ideally applicants can understand requirements without staff intervention. 


Conclusion

Good program design is fundamental to effectively engaging with researchers, industry, state and local governments, and communities, in order to realize the full potential of DOE funding. Though much of the real-world impact of BIL and IRA is still yet to come, DOE can already begin learning from the challenges and successes of program design and implementation under the Biden administration. The recommendations in this report are just as applicable to the remaining funding from BIL and IRA that DOE has yet to implement, as they are to future programs. Moving forward, Congress has the opportunity to reconsider the way that programs are designed in future legislation, especially those targeting demonstration and deployment activities, and make sure that DOE has clear direction and the right authorities and flexibility to maximize the impact of federal funding.


Acknowledgements

The authors would like to thank Arjun Krishnaswami for coining the idea of DOE 4.0 and his insightful feedback throughout the development and execution of this project. The authors would also like to thank Kelly Fleming for her leadership of the clean energy team while she was at FAS. Additional gratitude goes to Claire Cody at Clean Tomorrow, Gene Rodrigues, Keith Boyea, Kyle Winslow, Raven Graf and all the other individuals and organizations who helped inform this report through participating in workshops and interviews and reviewing an earlier draft.


Appendix A. Acronyms

ATVMAdvanced Technology Vehicles Manufacturing Loan Program
BILBipartisan Infrastructure Law (a.k.a the Infrastructure Investment and Jobs Act)
CBPsCommunity Benefits Plans
DACDirect Air Capture
DFCInternational Development Finance Corporation
DOEDepartment of Energy
DoWDepartment of War
EDFOffice of Energy Dominance Financing
EGSEnhanced Geothermal Systems
FEOCForeign Entity of Concern
FERCFederal Energy Regulatory Commission
FORGEFrontier Observatory for Research in Geothermal Energy
GDOGrid Deployment Office
GETsGrid Enhancing Technologies
GRIPGrid Resilience and Innovation Partnerships
GTOGeothermal Technologies Office
H2DIHydrogen Demand Initiative
HGEOHydrocarbons and Geothermal Energy Office
IDPIndustrial Demonstration Program
IRAInflation Reduction Act
LPOLoan Programs Office
NARUCNational Association of Regulatory Utility Commissioners
NASEONational Association of State Energy Officials
OBBBAOne Big Beautiful Bill Act
OCEDOffice of Clean Energy Demonstrations
ORISEOak Ridge Institute for Science and Education
OTOther Transactions
OTAOther Transactions Authority
PPAsPower Purchase Agreements
SEFIState Energy Financing Institution
TEFPTribal Energy Financing Program
TFPTransmission Facilitation Program
Title 1703Title XVII Innovative Energy Loan Guarantee Program
Title 1706Title XVII Energy Infrastructure Reinvestment Financing Program
USGSU.S. Geological Survey

Appendix B. BIL and IRA Funding Distribution Methodology

The funding distribution heat map at the beginning of the report includes all of the BIL and IRA programs with funding authorized and/or appropriated directly to DOE, excluding loan programs. The following were not included in this table:

  1. Loan programs, which are funded differently than traditional programs;
  2. Tax credits that DOE helped design (e.g., 45X), which are also funded through a different mechanism; and
  3. Programs implemented by DOE, but funded by other agencies’ appropriations, such as the Methane Emissions Reduction Program funded by the Environmental Protection Agency.

Programs were tagged according to their sector or technology area, their activity area, and type of assistance based on key words in their statutory language. Programs could be tagged with multiple sectors/technologies, activity areas, and/or types of assistance.

To determine the amount of funding for each sector/technology and activity area combination, all of the programs with the corresponding tags were included in the sum. Because of this duplicative counting, the sum of the dollar amounts in the table exceeds the total amount of funding for all of these programs. Sector/technology totals were calculated without this duplication, which is why those amounts are less than what one would obtain by summing all of the activity area amounts for a sector/technology. 

Activity area categories:

Sector/technology categories:

1
Title 1706 was renamed the Energy Dominance Financing Program by the One Big Beautiful Bill Act (OBBBA).
2
Though OBBBA repealed ATVM’s Section 50142 in the IRA, that does not reinstate the cap on ATVM’s loan authority due to the way repeals of repeals work. https://www.law.cornell.edu/uscode/text/1/108
3
Risk aversion within DOE can slow down the implementation of OTs though, requiring additional time to get decision makers on board. This was especially a challenge for H2DI.
4
The Trump administration did explicitly state that it would be using OT agreements for the one demonstration program it has announced so far. https://infrastructure-exchange.energy.gov/Default.aspx#FoaIdf868e23e-e2f0-43c9-8eaa-75b614d851f3
5
This is not to say that there weren’t also some things that could have been improved in the implementation of these programs to speed up timelines.
6
A notable recent exception to this is the Department of War’s (DoW) price floor and purchase commitments to MP Materials. MP Materials’ Securities and Exchange Commission filing on the deal noted as a risk DoW’s need “to secure additional funds in the future in order to meet its obligations,” suggesting that the agency did not have enough funding on hand to cover the entire deal when it was signed. https://fas.org/publication/unpacking-dod-and-mp-partnership/; https://d18rn0p25nwr6d.cloudfront.net/CIK-0001801368/6191cf7a-1cb7-4c45-a50a-72c98a0fbe86.pdf
7
This is the default for DOE’s recurring annual appropriations, but varies for one-off bills like BIL and IRA.
8
Prizes are not necessarily easier for DOE to implement. They can take a lot of staff time to design properly, but the results can be worth it.
9
According to DOE’s announcement, warrants are within the agency’s authority to use in loan agreements and have precedent in being included in DOE’s prior loan to Tesla.
10
Direct equity investments, independent of a loan agreement, are not currently within DOE’s loan program authorities.