FY98 Program Element Descriptive Summaries / RDDS

0604507N Enhanced Modular Signal Processor (EMSP)

(U) COST (Dollars in Thousands)

PROJECT NUMBER & TITLEFY 1996 ACTUALFY 1997 ESTIMATEFY 1998 ESTIMATEFY 1999 ESTIMATEFY 2000 ESTIMATEFY 2001 ESTIMATEFY 2002 ESTIMATEFY 2003 ESTIMATETO COMPLETETOTAL PROGRAM
V1440 EMSP14,076 21,740 3,462 3,224 1,374 1,466 1,498 1,533 CONT. CONT.

A. (U) MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: The Enhanced Modular Signal Processor (EMSP) is a modular, distributed parallel state-of-the-art signal processor to provide increased performance capability for multi-platform ASW weapon systems.

(U) PROGRAM ACCOMPLISHMENTS AND PLANS:

1. (U) FY 1996 ACCOMPLISHMENTS:

(U) ($727) Completed DT-III Testing (Reliability Demonstration).

(U) ($5,280) Supported software development, integration, testing, and critical engineering design support for Development and Operational Testing (DT/OT) for Airborne Low Frequency Sonar (ALFS), SURTASS, AN/SQQ-89, P-3C, AN/BSY-2 and DDG 993 systems.

(U) ($1,569) Continued risk mitigation Independent Verification and Validation (IV&V) testing.

(U) ($5,500) Performed requirements review and developed a preliminary design to migrate UYS-2A Application Software from MIL proprietary closed systems to Commercial-Off-The-Shelf COTS) based Open Systems Architecture that reuses existing legacy AN/UYS-2A software.

(U) ($500) Performed a COTS characterization study of enclosures to determine extent and amount of environmental protection the enclosure can provide for COTS boards.

(U) ($500) Performed COTS Input Signal Conditioner (ISC) requirements review and developed a preliminary design.

1. (U) FY 1997 PLAN:

(U) ($13,464) Develop and test prototype middleware software that migrates AN/UYS-2A application from MIL proprietary closed systems to Commercial-Off-The-Shelf (COTS) based Open System Architecture that reuses existing legacy

AN/UYS-2A software.

(U) ($3,250) Develop and test prototype COTS Input Signal Conditioner (ISC) in support of the AN/UYS-2 COTS Variant (ACV) effort.

(U) ($750) Build a prototype ALFS/SH-60 COTS enclosure that reduces environmental conditions at the board level.

(U) ($3,718) Support software development, integration, testing, and critical engineering design support for

the Development and Operational Testing (DT/OT) for ALFS, AN/SQQ-89, P-3C, AN/BSY-2 and DDG 993 systems.

(U) ($558) Portion of extramural program reserved for Small Business Innovative Research (SBIR) assessment in accordance with 15 U.S.C. 638.

1. (U) FY 1998 PLAN:

(U) ($3,462) Support software changes for integration, testing, and critical engineering design support for

Development and Operational Testing (DT/OT) for ALFS, AN/SQQ-89, P-3C, AN/BSY-2 and DDG 993 systems.

4. (U) FY 1999 PLAN:

(U) ($3,224) Support software changes for integration, testing, and critical engineering design support for

Development and Operational Testing (DT/OT) for ALFS, AN/SQQ-89, P-3C, AN/BSY-2 and DDG 993 systems.

(A) JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under Engineering and Manufacturing Development because

it encompasses engineering and manufacturing development of new end-items prior to production approval decision.

B. (U) PROGRAM CHANGE SUMMARY: FY 1996 FY 1997 FY 1998 FY 1999

(U) FY 1997 President's Budget: 14,377 3,718 3,481 3,257

(B) Adjustments from FY 1997 PRESBUDG: -301 +18,022 -19 -33

(C) FY 1998/1999 PRESBUDG Submit: 14,076 21,740 3,462 3,224

(U) CHANGE SUMMARY EXPLANATION:

(U) Funding: Decrease of $301K in FY 1996 is due to minor pricing adjustments (-$17K) and SBIR Transfer (-$284K). Increase of $18,022K in FY 1997 is the result of a Congressional Plus Up of $19,000K and a decrease for Congressional undistributed reductions of $978K. Reduction of $19K in FY 1998 is due to minor pricing adjustments. Decrease of $33K in FY 1999 is due to minor pricing adjustments.

(U) Schedule: Not applicable.

(D) Technical: Not applicable.

C. (U) OTHER PROGRAM FUNDING SUMMARY: (Dollars in thousands)

PROJECT NUMBER & TITLEFY 1996 ACTUALFY 1997 ESTIMATEFY 1998 ESTIMATEFY 1999 ESTIMATEFY 2000 ESTIMATEFY 2001 ESTIMATEFY 2002 ESTIMATEFY 2003 ESTIMATETO COMPLETETOTAL PROGRAM
(U) OPN Line 1026,281 1,983 1,962 2,484 2,420 2,478 2,531 2,591 CONT. CONT.
(U) OPN Line 76 26,1000 0 0 0 0 0 0 CONT. CONT.

(U) RELATED RDT&E:

(E) PE 0204311N (Integrated Surveillance System) Provides funding for SURTASS unique interfaces.

(F) PE 0205620N (Surface ASW Combat System Integration) Provides funding for AN/SQQ-89 unique interfaces.

(U) PE 0604212N (Anti-Submarine Warfare and Other Helicopter Development) Provides funding for ALFS unique interfaces.

(G) (U) SCHEDULE PROFILE:

See attached.

A. (U) PROJECT COST BREAKDOWN: ($ in thousands)
PROJECT COST CATEGORIES FY 1996 FY 1997 FY 1998 FY 1999
a. Software Development 6,582 13,632 600 500
b. Systems Engineering 4,541 5,160 1,197 1,194
c. Integrated Logistics Support 1,200 900 600 500
d. Configuration Management 150 100 60 50
e. Project Management Support 1,425 1,200 800 800
f. Travel 78 70 70 70
g. Miscellaneous 100 120 135 110
h. SBIR 0 558 0 0
TOTAL 14,076 21,740 3,462 3,224

B. (U) BUDGET ACQUISITION HISTORY AND PLANNING INFORMATION ($ in thousands)
PERFORMING ORGANIZATIONS
Contractor/Government

Performing

Activity

Contract

Method/

Fund Type

Vehicle

Award/

Oblig

Date

Perform

Activity

EAC

Project

Office

EAC

Total

FY 1995

& Prior

FY 1996

Budget

FY 1997

Budget

FY 1998

Budget

FY 1999

Budget

To

Complete

Total

Program

Not applicable.