FY98 Program Element Descriptive Summaries / RDDS

0604503N : Submarine System Equipment Development

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 5 PROGRAM ELEMENT: 0604503N

PROGRAM ELEMENT TITLE: Submarine System Equipment Development

(U) COST: (Dollars in Thousands)

PROJECT NUMBER & TITLEFY 1996 ACTUALFY 1997 ESTIMATEFY 1998 ESTIMATEFY 1999 ESTIMATEFY 2000 ESTIMATEFY 2001 ESTIMATEFY 2002 ESTIMATEFY 2003 ESTIMATETO COMPLETETOTAL PROGRAM
F0775 Submarine Support Equipment Program 16,105 11,522 0 0 0 0 0 0 0 73,791
S0219 Submarine Sonar Improvement 28,288 32,125 33,545 37,512 31,267 22,599 21,552 23,349 CONT. CONT.
X0742 Submarine Integrated Antenna Systems 16,79710,719 3,182 2,906 5,5295,6465,7733,196 CONT.CONT.
X1411 Submarine Tactical Communications System 5,0014,2725,5677,496 4,999 5,046 9,745 6,780 CONT. CONT.
TOTAL66,19158,63842,29447,91441,79533,29137,07033,325CONT.CONT.

(U) MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: The Submarine Support Equipment Program develops and improves submarine Electronic Warfare Support Measures (ESM) techniques and components, equipment, and systems that will increase submarine operational effectiveness in the increasingly dense and sophisticated electromagnetic environment caused by the proliferation of complex radar, communications, and navigation equipment of potential adversaries. Improvements are necessary for submarine ESM to be effective in conducting the following mission areas: Joint Littoral Warfare, Joint Surveillance, Space and Electronic Warfare and Intelligence Collection, Maritime Protection, and Joint Strike. The major efforts in this area are the Engineering and Manufacturing Development (EMD) of the Integrated ESM Mast (IEM), and the Periscope Monopulse Direction Finding (MDF) System for the Type 18 Periscope.

(U) The Submarine Sonar Improvement Program delivers block updates to Sonar Systems installed on SSN 688, 688I and TRIDENT Class Submarines to maintain clear acoustic, tactical and operational superiority over submarine and surface combatants in all scenarios through detection, classification, localization and contact following. Current developments are focused on supporting Littoral Warfare, Regional Sea Denial, Battle Group Support, Diesel Submarine Detection, Surveillance, and Peacetime Engagement.

Page 100-1 of 100-20 Pages Exhibit R-2

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 5 PROGRAM ELEMENT: 0604503N

PROGRAM ELEMENT TITLE: Submarine System Equipment Development

(U) The Submarine Integrated Antenna Systems (SIAS) project develops the antennas needed to communicate in networks such as Ultra High Frequency Satellite Communications, Extremely Low Frequency (ELF), Extremely High Frequency (EHF) and Global Positioning System. Hardware developments include: (a) mast-mounted systems; (b) buoyant cable systems; and (c) expendable buoy systems.

(U) The Submarine Tactical Communications Systems project provides attack submarines with an exterior communications system which: (a) minimizes the time required at communications depth; (b) enhances operability, reducing errors and manpower requirements; and (c) provides flexibility for low impact growth and change throughout the life of the submarine. Design efforts will provide increased antenna signal distribution and interconnection subsystems to accommodate ELF, EHF, and Mini-Demand Assigned Multiple Access and a message storage and processing subsystem.

(U) JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under ENGINEERING & MANUFACTURING DEVELOPMENT because it encompasses engineering and manufacturing development of new end-items prior to the production approval decision.

Page 100-2 of 100-20 Pages Exhibit R-2

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 5 PROGRAM ELEMENT: 0604503N

PROGRAM ELEMENT TITLE: Submarine System Equipment

Development

(U) COST (Dollars in thousands)

PROJECT NUMBER & TITLEFY 1996 ACTUALFY 1997 ESTIMATEFY 1998 ESTIMATEFY 1999 ESTIMATEFY 2000 ESTIMATEFY 2001 ESTIMATEFY 2002 ESTIMATEFY 2003 ESTIMATETO COMPLETETOTAL PROGRAM
S0219 Submarine Sonar Improvement 28,288 32,125 33,545 37,512 31,267 22,599 21,552 23,349 CONT. CONT.

A. (U) MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: This program delivers block updates to Sonar Systems installed on SSN 688, 688I and TRIDENT Class Submarines to maintain clear acoustical, tactical and operational superiority over submarine and surface combatants in all scenarios through detection, classification, localization and contact following. Current developments, detailed below, are focused on supporting Littoral Warfare, Regional Sea Denial, Battle Group Support, Diesel Submarine Detection, Surveillance, and Peacetime Engagement. OPEVAL for AN/BQQ-5E and the TB-29 Array will complete in FY 1997; these will provide quantum improvements in long-range detection and localization for SSN 688 and TRIDENT Class Submarines. Engineering Change Proposal (ECP) 7001 to AN/BQQ-5E will provide Low Frequency Active Interference Rejection, Dual Towed Array Processing and Full Spectrum Processing to SSN 688 and TRIDENT Class Submarines. The Onboard Trainer is being developed to provide pierside and at-sea operational and team training to improve operator efficiency. The AN/BSY-1 ECP 1000 and the AN/BQQ-5 Medium Frequency Active Improvement (MFAI) program 2nd Improved Control Display Concole Obsolete Equipment Replacement have been modified to become the basis of the Acoustics Rapid COTS Insertion (A-RCI) program. A-RCI is a multi-phased, evolutionary development effort geared toward addressing the Acoustic Superiority issue through the rapid introduction of interim development products applicable to SSN 688, 688I Flight and SSBN 726 Class Submarines. A-RCI Phase I and II introduce towed array processing improvements; A-RCI Phase III introduces spherical array processing improvements. The AN/BSY-1 HF Upgrade is a stand-alone program which will be introduced as A-RCI Phase IV for SSN 688I only. Towed array development will focus on (a) tow cable improvements for shallow water towing; (b) reliability improvements for couplings, connectors, strength members and hoses for all module types, (c) hydrophone and telemetry cost reduction alternatives; and (d) development of a TB-16 multi-line towed array for improved performance in littoral water operations.

(U) PROGRAM ACCOMPLISHMENTS AND PLANS:

1. (U) FY 1996 ACCOMPLISHMENTS:

(U) ($1,499) Completed development of AN/BQQ-5E ECP 7001.

Page 100-3 of 100-20 Pages Exhibit R-2

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 5 PROGRAM ELEMENT: 0604503N PROJECT NUMBER: S0219

PROGRAM ELEMENT TITLE: Submarine System Equipment PROJECT TITLE: Submarine Sonar Improvement

Development

(U) ($20,029) Restructured AN/BSY-1 ECP 1000 development into A-RCI Phases I and II and commenced development of A-RCI Phase III.

(U) ($4,515) Continued towed array development efforts to include initial at-sea testing and demonstrations of towed array/handling system improvements. Initiated technical demonstration efforts for designs prior to resuming TB-29 production.

(U) ($500) Continued development of Onboard Trainer.

(U) ($600) Continued development for Desk Top Calculator (DTC) Improvements.

(U) ($1,145) Developed specifications for AN/BSY-1 High Frequency (HF) Upgrade program and completed Cost and Operational Effectiveness Analysis (COEA).

2. (U) FY 1997 PLAN:

(U) ($21,892) Continue development of A-RCI Phases I, II and III. Conduct A-RCI Phase I and II Critical Design Review (CDR).

(U) ($5,832) Continue towed array development efforts. Conduct at-sea testing of improved towed array hardware. Continue technical demonstration efforts.

(U) ($439) Complete OPEVAL for TB-29 and AN/BQQ-5E.

(U) ($828) Continue development for DTC Improvements.

(U) ($2,510) Obtain MS II approval and begin transition of HF Upgrade Sensor and Transmit requirements to production for First Article Test.

(U) ($624) Portion of program reserved for Small Business Innovative Research(SBIR)assessment in accordance with 15 U.S.C. 638.

3. (U) FY 1998 PLAN:

(U) ($1,845) Conduct at-sea testing of A-RCI Phase I.

(U) ($20,653) Conduct A-RCI Phase III CDR.

(U) ($2,195) Continue First Article Test of HF Sensor and Transmit Equipment. Begin transition of NSSN C3I developed High Frequency Processing Software to A-RCI for system integration and test.

(U) ($7,952) Commence development of TB-16 multi-line towed array.

(U) ($900) Continue development for DTC Improvements.

Page 100-4 of 100-20 Pages Exhibit R-2

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 5 PROGRAM ELEMENT: 0604503N PROJECT NUMBER: S0219

PROGRAM ELEMENT TITLE: Submarine System Equipment PROJECT TITLE: Submarine Sonar Improvement

Development

4. (U) FY 1999 PLAN:

(U) ($1,902) Conduct at-sea testing of A-RCI Phases II.

(U) ($13,728) Continue development of A-RCI Phase III.

(U) ($12,132) Begin system integration testing of AN/BSY-1 HF Upgrade.

(U) ($8,850) Continue development of TB-16 multi-line towed array.

(U) ($900) Continue development for DTC Improvements.

B. (U) PROGRAM CHANGE SUMMARY:

FY 1996 FY 1997 FY 1998 FY 1999

(U) FY 1997 President's Budget: 29,060 33,562 34,306 38,750

(U) Adjustments from 1997 PRESBUDG: -772 -1,437 -761 -1,238

(U) FY 1998/1999 PRESBUDG Submit: 28,288 32,125 33,545 37,512

(U) CHANGE SUMMARY EXPLANATION:

(U) Funding: FY 1996 decreased $538K for SBIR and $234K for other minor pricing adjustments. FY 1997 decreased $1,437K for Congressional undistributed reductions. FY 1998 decreased $761K for NWCF carryover rates. FY 1999 decreased $1000 for Navy adjustments and $238K for NWCF carryover and rate adjustments.

(U) Schedule: This submit establishes A-RCI program schedule.

(U) Technical: A-RCI increases technical capabilities over programs through the use of commercial off the shelf components, open system architecture, and leveraging advanced development efforts.

C. (U) OTHER PROGRAM FUNDING SUMMARY: (Dollars in thousands)

PROJECT NUMBER & TITLEFY 1996 ACTUALFY 1997 ESTIMATEFY 1998 ESTIMATEFY 1999 ESTIMATEFY 2000 ESTIMATEFY 2001 ESTIMATEFY 2002 ESTIMATEFY 2003 ESTIMATETO COMPLETETOTAL PROGRAM
(U) OPN Line 21470 42,71144,18677,953116,310150,374159,952131,522144,761CONT.CONT.
Page 100-5 of 100-20 Pages Exhibit R-2

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 5 PROGRAM ELEMENT: 0604503N PROJECT NUMBER: S0219

PROGRAM ELEMENT TITLE: Submarine System Equipment PROJECT TITLE: Submarine Sonar Improvement

Development

(U) RELATED RDT&E:

(U) PE 0604524N (Submarine Combat System)

(U) PE 0604558N (New Design SSN Development)

(U) PE 0604561N (SSN-21 Development)

(U) PE 0604562N (Submarine Tactical Warfare System (Eng))

D. (U) SCHEDULE PROFILE: See attached.

Page 100-6 of 100-20 Pages Exhibit R-2

FY 1998/FY 1999 RDT&E,N PROGRAM ELEMENT/PROJECT COST BREAKDOWN DATE: February 1997

BUDGET ACTIVITY: 5 PROGRAM ELEMENT: 0604503N PROJECT NUMBER: S0219

PROGRAM ELEMENT TITLE: Submarine System Equipment PROJECT TITLE: Submarine Sonar Improvement

Development
A. (U) PROJECT COST BREAKDOWN: ($ in thousands)
PROJECT COST CATEGORIES FY 1996 FY 1997 FY 1998 FY 1999
a. Primary Hardware Development 20,795 24,815 25,313 28,404
b. Systems Engineering 4,661 5,126 5,353 6,004
c. Program Management Support 628 642 658 672
d. Test & Evaluation 600 130 760 812
e. Travel 195 120 120 120
f. Miscellaneous 1,409 1,292 1,341 1,500
TOTAL 28,288 32,125 33,545 37,512

Page 100-7 of 100-20 Pages Exhibit R-3

FY 1998/FY 1999 RDT&E,N PROGRAM ELEMENT/PROJECT COST BREAKDOWN DATE: February 1997

BUDGET ACTIVITY: 5 PROGRAM ELEMENT: 0604503N PROJECT NUMBER: S0219

PROGRAM ELEMENT TITLE: Submarine System Equipment PROJECT TITLE: Submarine Sonar Improvement

Development

B. (U) BUDGET ACQUISITION HISTORY AND PLANNING INFORMATION ($ in thousands)
PERFORMING ORGANIZATIONS
Contractor/

Government

Performing

Activity

Contract

Method/

Fund Type

Vehicle

Award/

Oblig

Date

Perform

Activity

EAC

Project

Office

EAC

Total

FY 1995

& Prior

FY 1996

Budget

FY 1997

Budget

FY 1998

Budget

FY 1999

Budget

To

Complete

Total

Program

Product Development
Lockheed Martin SS/CPAF 8/93 22,703 22,703 21,632 1,071 0 0 0 0 22,703
Manassas, Virginia
Martin Marietta C/CPIF 6/90 77,600 77,600 77,600 0 0 0 0 0 77,600
Glen Burnie, Maryland
Lockheed Martin SS/CPAF 1/95 76,209 76,209 6,000 17,182 19,201 17,519 10,556 5,751 76,209
Manassas, Virginia
Lockheed Martin C/CPIF 10/93 7,779 7,779 7,279 500 0 0 0 0 7,779
Manassas, Virginia
Lockheed Martin SS/CPAF 10/97 13,592 13,592 0 0 0 250 8,842 4,500 13,592
Manassas, Virginia
NUWC WR Various CONT. CONT. 37,926 5,302 6,931 10,395 10,743 CONT. CONT.
Newport, Rhode Island
NSWC WR Various 11,850 11,850 11,850 0 0 0 0 0 11,850
Carderock, Maryland
Misc Various Various CONT. CONT. 3,595 823 762 778 792 CONT. CONT.
Test and Evaluation
Misc Various Various CONT. CONT. 1,746 600 130 760 812 CONT. CONT.