Basis of Issue Plan - BOIP
A. DESCRIPTION:
A LOADER TRANSPORTER TRACK VEHICLE, CONTAINING THE NECESSARY
HYDRAULIC COMPONENTS TO PROVIDE THE REQUIRED LIFT AND
MOVEMENTS TO TRANSPORT/ LOAD THREE (3) READY TO FIRE HAWK
MISSILES ON A LAUNCHER/ PALLET.
B. CAPABILITIES:
PROVIDES THE ABILITY TO TRAIN LOADING/TRANSFER OF UP TO THREE
EACH READY TO FIRE HAWK MISSILES ON A LAUNCHER/PALLET BOTH ON
THE GROUND OR WHILE TIED DOWN ON A FIVE (5) TON TRUCK.
C. EMPLOYMENT:
EMPLOYED WITH HAWK MISSILE TDA SITES TO PROVIDE THE ABILITY
TO TRAIN LOADING AND UNLOADING PROCEEDURES OF UP TO THREE
READY TO FIRE MISSILES.
D. BASIS OF ISSUE:
SIX (6) EACH PER TDA W1D2AA AND SIX (6) EACH PER TDA W1EAAA.
E. POWER REQUIREMENTS:
NONE.
F. TRANSPORTATION REQUIREMENTS:
5-TON TRUCK.
G. PERSONNEL/MAINTENANCE IMPACTS:
(1) OPERATOR:
A. MOS: 14D1O
B. TRAINING: (MOS GENERAL, REQUIRED TRAINING FOR AWARD OF
MOS 14D)
(2) MAINTAINERS:
A. UNIT LEVEL MAINTENANCE:
MOS: 23R (HAWK FIRING SECTION MECHANIC)
MOS: 63Y (TRACK VEHICLE MECHANIC)
B. DS-LEVEL MAINTENANCE:
MOS: 27H (HAWK FIRING SECTION REPAIRER)
MOS: 63H (TRACK VEHICLE REPAIRER)
C. GS-LEVEL MAINTENANCE:
N/A
H. SPECIAL NOTES:
NO ASOIE LINS EXIST FOR THE PRIME LIN. THIS ITEM IS BEING
PROCURED FOR THE U.S. MARINE CORPS. TRAINING REQUIREMENTS
FOR THE U.S. MARINE CORPS ON HAWK EQUIPMENT IS CONDUCTED BY
THE U.S. ARMY. THIS ITEM WILL BE FIELDED ONLY FOR TDA UNITS,
WHERE IT IS REQUIRED FOR TRAINING. THIS BOIP IS APPROPRIATE
PUBLICATION IN AR 71-13.