CONTRACT SECURITY CLASSIFICATION SPECIFICATION (The requirements of the DoD Industrial Security Manual apply
|
|
|
|
|
|
|
1. CLEARANCE AND SAFEGUARDING |
|
|
||||
|
|
|
|
|
|
|
|
a. FACILITY CLEARANCE REQUIRED
|
|
|
||||
|
|
|
|
|
|
|
|
b. LEVEL OF SAFEGUARDING REQUIRED
|
|
|
||||
| 2. THIS SPECIFICATION IS FOR (x and complete as applicable) |
|
|
|
|
|
3. THIS SPECIFICATION IS: (x and complete as applicable) |
|
|
|
||||
|
|
a. PRIME CONTRACT NUMBER
|
|
|
|
|
X | a. ORIGINAL (Complete date in all cases) 31 Mar 2003 |
|
Date (YYMMDD)
31 Jan 1997 |
||||
|
|
b. SUBCONTRACT NUMBER
|
|
|
|
|
|
|
Revision No.
|
Date (YYMMDD)
|
||||
| X | c. SOLICITATION OR OTHER NUMBER F29601-96-R-0001 |
|
Due Date (YYMMDD) |
|
|
|
c. FINAL (Complete Item 5 in all cases) |
|
Date (YYMMDD) | ||||
| 4. IS THIS A FOLLOW-ON CONTRACT? |
|
X | YES |
|
NO. If Yes, complete the following: F29601-94-C-00XX |
|
|
|
|
||||
| Classified material received or generated under |
|
|
|
|
(Preceding Contract Number) is transferred to this follow-on contract. |
|
|
|
|
||||
| 5. IS THIS A FINAL DD FORM 254? |
|
|
YES | X | NO. If Yes, complete the following: |
|
|
|
|
||||
| In response to the contractor's request dated , retention of the identified classified material is authorized for the period of |
|
|
|
|
|
|
|
|
|
||||
| 6. CONTRACTOR (Include Commercial and Government Entity (CAGE) Code) |
|
|
|
|
|
|
|
|
|
||||
|
a. NAME, ADDRESS, AND ZIP CODE
|
|
|
b. CAGE CODE
|
c. COGNIZANT SECURITY OFFICE (Name, Address, and Zip Code)
SEE NEXT PAGE FOR LIST OF COGNIZANT SECURITY OFFICES |
|
|
|||||||
| 7. SUBCONTRACTOR |
|
|
|
|
|
|
|||||||
|
a. NAME, ADDRESS, AND ZIP CODE
|
|
|
b. CAGE CODE
|
c. COGNIZANT SECURITY OFFICE (Name, Address, and Zip Code)
|
|
|
|||||||
| 8. ACTUAL PERFORMANCE |
|
|
|
|
|
|
|||||||
| a. LOCATION |
|
|
b. CAGE CODE | c. COGNIZANT SECURITY OFFICE (Name, Address, and Zip Code) |
|
|
|||||||
|
9. GENERAL IDENTIFICATION OF THIS PROCUREMENT
The objectives of this acquisition are to develop a PDRR design for an EMD Airborne Laser (ABL) system for theater missile defense and develop a detailed concept design for an ABL PDRR aircraft. |
|
|
|
|
|
|
|||||||
| 10. THIS CONTRACT WILL REQUIRE ACCESS TO: |
|
|
11. IN PERFORMING THIS CONTRACT, THE CONTRACTOR WILL: |
|
YES | NO | |||||||
| a. COMMUNICATIONS SECURITY (COMSEC) INFORMATION |
|
|
|
|
|
X | |||||||
| b. RESTRICTED DATA |
|
|
b. RECEIVE CLASSIFIED DOCUMENTS ONLY |
|
|
X | |||||||
| c. CRITICAL NUCLEAR WEAPON DESIGN INFORMATION |
|
|
c. RECEIVE AND GENERATE CLASSIFIED MATERIAL |
|
X |
|
|||||||
| d. FORMERLY RESTRICTED DATA |
|
|
d. FABRICATE, MODIFY, OR STORE CLASSIFIED HARDWARE |
|
X |
|
|||||||
| e. INTELLIGENCE INFORMATION: |
|
|
e. PERFORM, SERVICES ONLY |
|
|
X | |||||||
| (1) Sensitive Compartmented Information (SCI) |
|
|
|
|
|
X | |||||||
| (2) Non-SCI |
|
|
|
|
X |
|
|||||||
| f.SPECIAL ACCESS INFORMATION |
|
|
h.REQUIRE A COMSEC ACCOUNT |
|
X |
|
|||||||
| g.NATO INFORMATION |
|
|
i.HAVE TEMPEST REQUIREMENTS |
|
X |
|
|||||||
| h.FOREIGN GOVERNMENT INFORMATION |
|
|
j.HAVE OPERATIONS SECURITY (OPSEC) REQUIREMENTS |
|
X |
|
|||||||
| i.LIMITED DISSEMINATION INFORMATION((do not use) |
|
|
k.BE AUTHORIZED TO USE THE DEFENSE COURIER SERVICE |
|
X |
|
|||||||
| j.FOR OFFICIAL USE ONLY INFORMATION |
|
|
l.OTHER (Specify) Classified AIS |
|
|
|
|||||||
| k. OTHER (Specify) |
|
|
See block 13 |
|
X |
|
|||||||
|
|
|
|
|
|
|
|
|||||||
DD Form 254, DEC 90 Previous editions are obsolete. 805/340
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Direct | X | Through (Specify): |
|
|
|
|
|
|
|
|
|
Phillips Laboratory/PA, 3550 Aberdeen Ave SE, Kirtland AFB, NM 87117-5776. Provide 12 copies at least sixty (60) days before approval is required.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
X | Yes |
|
No |
| The minimum security requirements identified in COMSEC Addendum 1, INTELLIGENCE Addendum 2, OPSEC Addendum 3, and TEMPEST Addendum 4 require additional security procedures. These procedures must be determined prior to the establishment of the Special Access Program and require input from contractor security personnel. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
X | Yes |
|
No |
| SMC/TM retains security oversight for all SAR material provided to contractor visitor groups who support the ABL mission and occupy space at all government installations. The Defense Investigative Service (DIS) retains security oversight responsibility, excluding SAR material, for all contract performance not conducted at government installations. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| a. TYPED NAME OF CERTIFYING OFFICIAL Richard O. Conrad |
|
|
|
|
b. TITLE Chief, Acquisition Security, ABL Program |
|
|
c. TELEPHONE (Include Area Code) (505) 846-7675 |
|
|
|
|
|
d. ADDRESS (Include Zip Code)
|
|
|
|
|
|
17. REQUIRED DISTRIBUTION |
|
|
|
|
|
|
| Space and Missile Center/TM |
|
|
|
|
|
X | a. CONTRACTOR |
|
|
|
|
|
| 3550 Aberdeen Avenue SE, Bldg 760 |
|
|
|
|
|
X | b. SUBCONTRACTOR |
|
|
|
|
|
| Kirtland AFB, NM 87117-5776 |
|
|
|
|
|
X | c. COGNIZANT SECURITY OFFICE FOR PRIME AND SUBCONTRACTOR |
|
|
|
|
|
| e. SIGNATURE |
|
|
|
|
|
|
d. U.S. ACTIVITY RESPONSIBLE FOR OVERSEAS SECURITY ADMINISTRATION |
|
|
|
|
|
| /// Original Signed // |
|
|
|
|
|
X | e. ADMINISTRATIVE CONTRACTING OFFICER |
|
|
|
|
|
|
|
|
|
|
|
|
X | f. OTHERS AS NECESSARY |
|
|
|
|
|
DD Form 254 Reverse, DEC 90 *U.S. GPO: 1991-548-195/20024
F29601-96-R-0001Contract Expiration Date: 31 March 2003
Contract Monitor: Richard O. Conrad, Project Officer
Title: Chief, Acquisition Security
Organization: SMC/TMS
Phone Number: 505-846-7675
Addendum #1
COMSEC and/or Cryptographic Access
The contractor is governed by DoD 5220.22-S, COMSEC supplement to the Industrial Security Manual. Access to COMSEC material/information is restricted to U.S. citizens holding final U.S. Government clearances and is not releasable to personnel holding only a reciprocal clearance. Personnel requiring COMSEC access shall be briefed IAW DoD 5220.22-S. NOTE: The COMSEC/crypto briefing applies only to the use and control of crypto equipment and specialized COMSEC publications. NACSIM/NACSEM documents are not considered COMSEC controlled material. Additionally, cryptographic information/equipment shall be retained in a contractor facility COMSEC account IAW DoD 5220.22-S The Air Force program/project manager shall designate the number of personnel requiring cryptographic access. The number will be limited to the minimum necessary and will be on a strict need-to-know basis.
Addendum #2
Requirements for Handling Collateral Intelligence Information
1. The Air Force Instruction 14-303, applicable supplements and special Memorandum of Agreement (MOA) between SMC/TMS (PL/TMS) and PL/IN apply to this contract. Contractors must:
a. Maintain accountability for all intelligence released to their custody.
b. Not reproduce released intelligence documents without the written permission of the Senior Intelligence Officer (SIO), Phillips Laboratory, as defined under the Contractor/ PL/IN MOA. Reproductions must be controlled in the same manner as the original and are the property of Phillips Laboratory/IN, not the contractor.
c. Not to destroy any intelligence data provided under this contract without
advance approval of the SIO, Phillips Laboratory or as agreed in the MOA.
d. Restrict access only to those with the requisite security clearances and who are
providing services under this contract. Further dissemination to other
contractors, subcontractors, is limited to the terms of the MOA and with the
written permission of the SIO, Phillips Laboratory.
e. Not release intelligence material to foreign nationals or immigrant aliens without
the prior coordination and written approval of the SIO, Phillips Laboratory.
f. Maintain a record of individuals who access intelligence material in contractor
custody and to ensure that each assessor is knowledgeable of the requisite
security requirements. Provide reports to SMC/TMS for PL/IN as directed by the
MOA.
g. Ensure that all intelligence released to, reproductions of, and all intelligence
material generated under this contract remain the property of the U.S.
Government and are returned, upon request, to Phillips Laboratory/IN or is
destroyed when directed and destruction documented at the expiration of the
contract, whichever comes first.
Addendum #3
OPSEC Requirements
The contractor shall provide operations security (OPSEC) protection for all sensitive/ critical information in accordance with Air Force Instruction (AFI) 10-1101 paragraph(s) 2.6.2 and 3.2 and Phillips Laboratory Instruction 10-1101 paragraph(s) 1.4 - 1.4.4, 1.5.2, 2.2.1, 2.5, 5.1, 5.1.1, 5.1.2. The contractor shall describe the steps necessary to protect sensitive/critical information and comply on a non-interference basis with oversight from PL/INK.
Appendix 4
TEMPEST Security Requirements
a. The contractor shall ensure that compromising emanations (TEMPEST) conditions related to the contract are considered.
b. The contractor shall provide countermeasure assessment data to the Contracting Officer (CO), with an information copy to the AFSC field level TEMPEST manager, in the form of a TEMPEST Countermeasures Assessment Request (TCAR). The TCAR shall provide only specific responses to the data required on paragraph c. below; the contractor's standard security plan shall not be used as a "stand-alone" TCAR response. The contractor shall not submit a detailed facility analysis/assessment. The TCAR information will be used to complete a TEMPEST Countermeasures Assessment (TCA) of the contractor's facility to be performed by the government TEMPEST authority using current Air Force TEMPEST directives. TEMPEST is applied on a case-by-case basis and further information may be required to complete the TCA; should this be the case, the contractor shall provide this information to the contracting officer when requested. After evaluation of the TCAR by the government TEMPEST authority, additional TEMPEST requirements may be necessary. When changes to the information required in paragraph c. below occur (including, but not limited to, relocation of equipment from the originally approved room, or increasing the classification level or volume of processing), the contractor shall notify the contracting officer of these changes so that a new TCA may be accomplished. The contractor shall submit to the CO a new TCAR, with an information copy to the AFMC field level TEMPEST manager, identifying the new configuration at least thirty (30) days before the changes occur; the contractor shall not commence SECRET or higher processing with the new configuration until receiving approval to do so from the contracting officer.
c. TCAR Contents
(1) SYSTEM DESCRIPTION:
e. Classified processing shall not begin until specific written approval/authorization, including approval for changes required pursuant to paragraph c. above, is provided by the contracting officer.
Guidance For SPO/Contracting Officer
1. When the contractor provides the information required in paragraph c., the contracting officer/program manager/contract monitor shall make a determination of whether TEMPEST requirements have been adequately met. The AFMC field level TEMPEST office will perform the TCA and provide a written recommendation to the CO. NOTE: The contractor SHOULD NOT submit a detailed facility assessment/ analysis that he may have already completed; he should only submit the TCAR information required by paragraph c. for a TCA to be completed by the TEMPEST office.
The contractor shall direct comments/questions about any part of the TCA process to the contracting office and not to the local TEMPEST office.
2. The contracting officer will then provide the contractor with a written notification of TEMPEST compliance or will identify corrective measures required. When action is complete, no changes to the equipment or facility may be made unless prior approval is obtained from the contracting officer.
3. The TCAR should be submitted and approved as soon as it has been determined that classified processing will be required for contract performance, preferably at the RFP stage, before source selection/contract award in case additional cost will be incurred. The CO should NOT wait until just before the contractor begins classified processing to submit the TCAR to the contracting and TEMPEST offices.
Ordering/Delivering Documents
1. The government contracting officer and/or system program office are responsible for ordering and delivering applicable NACSEM/NACSIM documents to the contractor in accordance with provisions of the Federal Acquisition Regulation (FAR) 52.210-3, 10.008(d), and 10.011(c). The local TEMPEST office will provide guidance on requisition procedures. The documents are ordered through local Air Force Publication Distribution Office (PDO) channels using AF Form 764a, and shall be returned to the government upon completion of the contract.
2. See AFR 0-5 for the titles and classifications of the NACSEM/NACSIM documents.