(1 Data Item) |
Forms Approved
OMB No. 0704-0188 |
||||||||||||||||||||||
|
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
|
|||||||||||||||||||||||
|
A. CONTRACT LINE ITEM NO.
0002 |
B. EXHIBIT
A |
C. CATEGORY:
TDP TM OTHER X |
|
17. PRICE GROUP | |||||||||||||||||||
|
D. SYSTEM/ITEM
Airborne Laser |
E. CONTRACT/PR NO.
F29601-96-R-0001 |
F. CONTRACTOR |
|
|
|||||||||||||||||||
|
1. DATA ITEM NO.
A004 |
2. TITLE OF DATA ITEM
FUNCTIONAL COST-HOUR REPORT (FCHR) (DD FORM 1921-1) |
3. SUBTITLE |
|
18. EST TOTAL
PRICE |
|||||||||||||||||||
|
4. AUTHORITY (Data Acquisition Document No.)
DI-F-6007 |
5. CONTRACT REFERENCE
ITAMP Reference to be provided by offeror |
6. REQUIRING OFFICE
SMC/TM |
|
|
|||||||||||||||||||
|
7. DD 250 REQ
LT |
9. DIST STATEMENT
REQUIRED |
10. FREQUENCY
SEE 16 |
12. DATE OF FIRST SUBMISSION
SEE 16 |
14. DISTRIBUTION | |||||||||||||||||||
| 8. APP CODE NO | F | 11. AS OF DATE NONE | 13. DATE OF SUBSEQUENT SUBM. SEE 16 | a. ADDRESSEE |
b. COPIES
final draft reg repr |
||||||||||||||||||
|
16. REMARKS
BLOCK 4:
a. Contractor format is acceptable. Submittal shall be electronically using the ANSI ASC X 12 Transaction Set 196, Contractor Cost Data Reporting, Version 3040. The Government will have access, on an as-required basis, to electronic Contractor CCDR data. b. Reporting levels shall be in accordance with the government approved Contractor Cost Data Reporting Plan (CCDR). The approved CCDR Plan will be provided to the contractor 30 days after contract award. The contractor will map the Contract WBS to the CCDR Plan WBS 60 days after contract award. c. Critical/major subcontractor (team member) summary level data shall be reported and provided as an attachment. BLOCKS 10 - 13: Initial submission (hardcopy and electronic) shall be no later than 90 calendar days after contract award. Thereafter, subsequent submissions (hardcopy and electronic) shall be provided as follows: a. 60 calendar days following completion of the PDRR Phase I Preliminary Design Review
Blocks 14 and 15. Submit copy of transmittal letter, without data, to SMC/PK
|
|||||||||||||||||||||||
|
G. PREPARED BY
Capt Al Milton |
H. DATE 01 May 96 | I. APPROVED BY Del R. Patten // Signed // | |||||||||||||||||||||
|
|
SMC/TMP |
|
01 |
|
|||||||||||||||||||
|
|
SMC/TMC |
|
01 |
|
|||||||||||||||||||
|
|
ACO |
|
01 |
|
|||||||||||||||||||
|
|
OSD/PA&E |
|
01 |
|
|||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||
|
|
15. TOTAL -----> |
0 |
4 |
0 |
|||||||||||||||||||
|
|
|
J. DATE 04 Apr 96 |
|||||||||||||||||||||