SBIRS Low SBIRS Low Library List
These documents are provided in this library for information purposes only. The government's requirements will be contained in the official Request for Proposals (RFP) when it is released. Contractors are cautioned that should they submit a proposal, it must comply with all aspects of the official RFP.
Any offeror who uses the information contained in these documents or
relies on them in any fashion to formulate its proposal or to perform any subsequent
contract should it be the successful offeror, does so at its own risk.
| DOC # | DOCUMENT TITLE | DATE | VERSION STATUS | STATUS |
SBIRS LIB REF. # (T2) | LIBRARY NUMBER | SEARCH KEY |
1 |
SBIRS-LEO Dem/Val Phase Statement Of Objectives (SOO) (Word 6.0 - 5KB) | 2-Apr-96 |
Final |
Available |
5868.1 | Acquisition |
|
2 |
Space Based Infrared System (SBIRS) Single Acquisition And Management Plan (SAMP) Version 6 (Appendix's A, B, & C Are Classified Documents) (Word 6.0) | 1-Oct-96 |
Available |
29 |
5476.1 |
Acquisition |
|
3 |
SBIRS Capstone Requirements Document (CRD) | 16-Dec-94 |
Final |
Available |
2 |
5407.1 |
Requirements |
4 |
SBIRS Operational Requirements Document, (ORD) - Ref ORD Annex #353 | 5389.1 |
Requirements |
||||
| a. 15 Aug 96 - Signed ORD | 15-Aug-96 | Final | Available | ||||
| b. 4 May 98 (Cover dated 3 Apr 98) | 4-May-98 | Draft | Available | ||||
5 |
Reserved | ||||||
6 |
SBIRS Concept Of Operations (CONOPS)--AFSPC | 1-Oct-96 |
Final |
Available |
23 |
5447.1 |
CONOPS |
7 |
SBIRS Capstone CONOPS (version 8.4) | 27-May-96 |
Final |
Available |
5868.1 |
CONOPS |
|
8 |
SBIRS System Threat Assessment Report (STAR) - Ref #351 | 1-Sep-96 |
Final |
Available |
195 |
5883.1 |
Threat |
9 |
Superseded by final version dated 24 aug 96 - Doc #313 - United States Space Command National Ballistic Missile Defense (NBMD) Capstone Requirements Document (CRD) Coordinating Draft Version 1.4 | 12-Feb-96 |
Draft |
Deleted |
183 |
5812.1 |
Requirements |
10 |
Replaced by Doc #313 dated 24 Aug 96 - Ballistic Missile Defense (BMD)Capstone ORD (Still applies to TMD requirements. NMD rqmts now captured in draft NBMD CRD, 27 Feb 96) | 9-Dec-94 |
Final |
Replaced |
83 |
5620.1 |
Requirements |
11 |
Replaced by Doc #313 dated 24 Aug 96 - National Ballistic Missile Defense (NBMD) Capstone Requirements Document (CRD) | 27-Feb-96 |
Final Draft |
Replaced |
5863.1 | Requirements |
|
12 |
This Draft has been superseded by newer versions. This version of the SRD is OBE. New Version to be published June 98 - National Missile Defense (NMD) System Requirements Document (SRD) | 29-Aug-95 |
Draft (In Revision) |
Deleted |
82 |
5619.1 |
Requirements |
13 |
Replaced with Doc #314 - Ballistic Missile Defense (BMD) Communication, Command and Control (C3) ORD | 31-Aug-95 |
Draft |
Replaced |
5891.1 | Requirements |
|
14 |
This document is OBE. Bidders asked not to reference this document. Replacement out June 98 - Ballistic Missile Defense Orgranization (BMDO) Ballistic Missile Defense (BMD) Space-Based Missile Tracking System (SMTS) Element Requirements Document (ERD) | 22-May-95 |
Final (New Revision In Work) |
Deleted |
86 |
5623.1 |
Requirements |
15 |
SBIRS Technical Intelligence (TI) Requirements Doc | 7-Sep-95 |
Final |
NOT Available |
81 |
5618.1 |
Requirements |
16 |
Clarification Of TI Requirements (Including: Attachments 1, 2, 3 And 4, (2) Diskettes, (1) 8mm Tape) (Unable to reproduce) | 4-Jan-96 |
Available |
163 |
5747.1 |
Requirements |
|
17 |
Replaced with Doc #315 - Concept Of Operations (CONOPS) for Ballistic Missile Defense of North America | 3-Jan-96 |
Draft |
Replaced |
5877.1 | CONOPS |
|
18 |
Scenario Threat Tape Request Form | 17-Feb-95 |
Available |
41 |
5454.1 |
Scenario |
|
19 |
Threat Scenarios & Threat Tapes Description Document, Global Protection Against Limited Strikes Non-Campaign Threat Scenarios (GPALS 91-2) Vol I & II | 1-Sep-92 |
Final |
Available |
5872.1 / 5873.1 | Scenario |
|
20 |
North East Asia (NEA) Campaign Scenario Vol 1 and 2 | 1 Mar 96 |
Final |
Available |
77 |
5614.1 |
Scenario |
21 |
Same as #22 below - Vol 1 | ||||||
22 |
South West Asia (SWA) North Campaign Scenario Vol 1 & Vol 2 | 25 Aug 95 1 Jun 96 |
Final |
Available |
78 79 |
5615.1 5616.1 |
Scenario |
23 |
South West Asia (SWA) South Campaign Scenario Vol 1 and 2 - See #294 |
15 Apr 96 |
Final |
Available |
80 |
5617.1 |
Scenario |
24 |
Major Regional Contingencies (East)/(West) - Threat Documentation 2005-2010 | 1-Aug-94 |
Draft |
Available |
160 |
5743.1 |
Scenario |
25 |
SBIRS Technical Intelligence (TI) Requirements Rationale | 1-Dec-96 |
Final |
Available |
|
5612.1 |
Scenario |
26 |
NMD System Analysis Scenarios | 22-Mar-96 |
Draft |
Available |
|
5879.1 |
Scenario |
27 |
USSTRATCOMJ61 Scenario Briefing (7, 9, 11, 13, 13A) | 30-Aug-95 |
Available |
56 |
5597.1 |
Threat/Scenario |
|
28 |
BMD Engineering Requirements Baseline Scenarios, Vol I, Scenario Descriptions (BERBS) | 30-Sep-95 |
Draft |
Available |
5878.1 | Scenario |
|
29 |
Theater Missile Capstone STAR | 1-Apr-96 |
Draft |
Available |
164 |
5753.1 |
Threat |
30 |
Emerging Missile Threats To North America During The Next 15 Years | 1-Nov-95 |
Available |
170 |
5759.1 |
Threat |
|
31 |
Prioritized List of NMD And TMD Threats | 29-Sep-95 |
Available |
157 |
5740.1 |
Threat |
|
32 |
Defense Intelligence Reference Document Theater Ballistic Missile Threat Characteristics | 15-Sep-95 |
Available |
159 |
5742.1 |
Threat |
|
33 |
Characteristics Of Scud-Derivative Missiles | 9-Oct-95 |
Available |
158 |
5741.1 |
Threat |
|
34 |
SBIRS Target Book, Version II, Part III | 1-Oct-95 |
Draft |
Available |
116 |
5647.1 |
Threat |
35 |
Target Data (1) (Disk) | 5-Mar-96 |
Available |
180 |
5808.1 |
Threat |
|
36 |
Trajectory & Intensity Profiles: Disks A2-2, Dt-2, Cq-2, Y4-2, Z9-2, Qo-2, Cx-2, Pi-2, T9-2, H9-2, I0-2, V7-2, Z7-2, A7-2 | 30-Aug-95 |
Available |
59 |
5594.1 |
Threat |
|
37 |
SBIRS Target Book Version II Draft Part II | 1-Aug-95 |
Available |
58 |
5593.1 |
Threat |
|
38 |
SBIRS Target Book Version II | 1-Aug-95 |
Available |
57 |
5592.1 |
Threat |
|
39 |
Technical Intelligence/Battlespace Characterization Threat Data, Version 2 | 17-Jan-96 |
Available |
181 |
5809.1 |
Threat |
|
40 |
Technical Intelligence/Battlespace Characterization Threat Data, Version 1 | 18-Sep-95 |
Final |
Available |
74 |
5611.1 |
Threat |
41 |
Slowwalker Aspect Angle Data, NAIC, Susan Boyd | 1-Oct-95 |
Available |
122 |
5686.1 |
Threat |
|
42 |
Slowwalker Intensity Information For SBIRS TI Minimum Threats | 8-Feb-95 |
Available |
177 |
5803.1 |
Threat |
|
43 |
Space Systems Threat Environment Description (TED) | 24-Jul-95 |
Available |
131 |
5701.1 |
Threat |
|
44 |
Command, Control, Communications, Computers And Intelligence (C4I) Systems And Networks; Telecommunications Networks; And Automated Information Systems (AIS Threat Environment Description) | 15-Jan-94 |
Available |
132 |
5702.1 |
Threat |
|
45 |
Strategic Systems TED Threat To US Strategic Defensive Systems | 1-Feb-94 |
Available |
161 |
5744.1 |
Threat |
|
46 |
OBE, Superseded by Doc #246 - BMDO NMD System Threat Assessment Report (STAR) | 16-Jul-95 |
Final |
Delete |
91 |
5628.1 |
Threat |
47 |
OBE, Superseded by Doc #246 -National Missile Defense Threat Assessment Report | 27-Dec-95 |
Draft |
Delete |
5879.1 | Threat |
|
48 |
SMTS Typical Threat Payloads | 15-Apr-96 |
Final |
Available |
5862.1 | Threat |
|
49 |
Ascent Heating Modifications for OPTISIG 4.0 | 1-Mar-96 |
Final |
Available |
5874.1 | Threat |
|
50 |
BE Flight Demo System Performance Specifications (SPS) | 19-Mar-92 |
Final |
Available |
10 |
5351.1 |
FDS |
51 |
Space & Missile Tracking System (SMTS) Flight Demonstration System (FDS) Preliminary Design Review (PDR), Vol I & II | 7-8 Nov 95 |
Final |
Available |
5864.1 | FDS |
|
52 |
BE Cost Analysis Requirements Document (CARD) | 10-Aug-95 |
Final |
Available |
5860.1 | FDS |
|
53 |
Brilliant Eyes (BE) Simulation (8 mm tape) - (unable to reporduce) | 9-Nov-95 |
Final |
Available |
5871.1 | FDS |
|
54 |
BE Request for Proposal (RFP) (Wang Image File - 20,288KB) | 1-Feb-91 |
Final |
Available |
25 |
5358.1 |
FDS |
55 |
BE Letter RFP (Wang Image File - 4,449KB) | 6-May-94 |
Final |
Available |
28 |
5346.1 |
FDS |
56 |
BE Letter RFP Change Package (Wang Image File - 2,785KB) | 9-Dec-94 |
Final |
Available |
5870.1 | FDS |
|
57 |
SBIRS Security Classification Guide (Classified And Unclassified Versions) See Document #139 and 140 also | 15-Jan-96 |
Draft |
Available |
43 |
5460.1 & 5461.1 |
Security |
58 |
Space And Missile Systems Center Brilliant Eyes (BE) Security Classification Guide | 31-May-94 |
Final |
Available |
44 -T1 |
5471.1 |
Security |
59 |
1994 SBIRS Architecture Study Analysis Scope And Key Assumptions | 16-Mar-95 |
Available |
48 |
5481.1 |
||
60 |
Air Force Space Command 02-88, Statement Of Operational Need (SON) for Space Surveillance | 21-Sep-89 |
Final |
Available |
87 |
5624.1 |
|
61 |
SBIRS Support To BMD | 28-Aug-95 |
Final |
Available |
90 |
5627.1 |
|
62 |
SBIRS Performance Parameters | N/A |
Final |
Available |
92 |
5629.1 |
|
63 |
Conceptual Architecture For SBIRS Increment II TI Operations | 25-Oct-95 |
Available |
121 |
5678.1 |
||
64 |
SBIRS System External Interface Roadmap | 21-Feb-95 |
Final |
Available |
24 |
5410.1 |
|
65 |
SBIRS Communication Roadmap | 27-Dec-95 |
Available |
136 |
5716.1 |
||
66 |
SDIO Communications Standard - Global Protection Against Limited Strikes (GPALS) - Effectivity #1 for Initial NMD | 12-Jan-92 |
Draft |
Available |
5886.1 | Communication Std |
|
67 |
Reserved |
|
|
|
|
||
68 |
GRANITE SHIELD 95 Mid 1990's Integrated Strategic Threat Scenario | 31-Jan-94 |
Available |
261 |
5791.1 |
||
69 |
GRANITE SHIELD 95 Mid 1990's Integrated Strategic Threat Tape Description | 31-Jan-94 |
Available |
262 |
5792.1 |
||
70 |
SMTS System Specification CDRL A008 (FDS A - Specification) | 13-Sep-96 |
Final |
Available |
6339.1 | Specifications |
|
71 |
SBIRS Contract Work Breakdown Structure (CWBS) and Contract Cost Data Reporting Plan (CCDRP) | 7-Mar-97 |
Final |
Available |
5931.1 | Cost |
|
72 |
SBIRS Requirements Allocation Document (RAD) | 21-Apr 98 | Final |
Available |
342 | 6318.1 | |
73 |
Brilliant Eyes ORD | 95 |
Draft |
NOT Available | |||
74 |
Brilliant Eyes Additional Mission (BEAM) Study Executive Brief | 94 |
Final |
Available |
6340.1 | ||
75 |
Flight Demonstration System (FDS) Mission Performance Specification (MP) | 22-Jul-96 |
Final |
Available |
|||
76 |
NORAD/USSPACECOM Interoperability & Standardization Guidance Portfolio | 31-Aug-94 |
Final |
Available |
204 | 5668.1 | |
77 |
Ballistic Missiles Payloads (current and projected) Update (U) | 1-Mar-95 |
Final |
NOT Available | |||
78 |
SBIRS Low CARD | 27-Mar-98 | Draft |
Available | 6325.1 | Cost | |
| 79 | Radiation Scattering from Particulate-Contaminated Mirrors | 1-Mar-94 | Final | Available | 6326.1 | ||
| 80 | Contamination Effects on Surveillance Telescopes | 1-Oct-93 | Final | Available | 6327.1 | ||
81 |
February/ March SBIRS Technology Report (Word 6.0) | 1-Mar-97 | Final | Available | 6333.1 | ||
| 82 | April 1997 SBIRS Technology Report (Word 6.0) | 1-Apr-97 | Final | Available | 6334.1 | ||
| 83 | Briefing Abstracts for SBIRS Technology Industry Day (Powerpoint 4.0) | 1-May-97 | Final | Available | 6335.1 | ||
| 84 | Government OCI Plan (Word 6.0) | 19-May-97 | Final | Available | 6347.1 |
||
| 85 | Avoidance of Organizational Conflict of Interest Regarding SBIRS Low Component Program Competition (Old Title: SBIRS High EMD Contract Clause (Word 6.0) | 15-May-97 | Final | Available | 6348.1 | ||
| 86 | Plan for Ensuring Fair and Open Competition for the SBIRS Low Component Acquisition (Word 6.0) | 11-Jul-97 | Final | Available | 6349.1 | ||
| 87 | Terms of Reference for the Independent Review Team (Word 6.0) | 16-May-97 | Final | Available | 6350.1 | ||
| 88 | SBIRS Technology Industry Day Presentations Part 1 | 1-May-97 | Final | Available | 6337.1 |
||
| 89 | SBIRS Technology Industry Day Presentations Part 2 | 1-May-97 | Final | Available | 6338.1 | ||
| 90 | Cobra Brass System Performance Analysis Report Version 1 | 2-Dec-96 | Final | Available | 6332.1 | ||
| 91 | SBIRS Low Altitude Study | 16-Apr-97 | Final | Available | 343 | 6324.1 | |
| 92 | May 1997 SBIRS Technology Report (Word 6.0) | 1-Jun-97 | Final | Available | 6341.1 | ||
| 93 | SBIRS High Component A-Spec | 27-Mar-98 | Draft | Available | 6323.1 | ||
| 94 | June 1997 SBIRS Technology Report (Word 6.0) | 1-Jul-97 | Final | Available | 63752.1 |
||
| 95 | SBIRS Industry Day Presentations (Powerpoint 4.0) | 26-Jun-97 | Final | Available | 6373.1 | ||
| 96 | Space Surveillance Requirements | 10-Jul-95 | Final | Available | 6374.1 | ||
| 97 | ICWG-12 Meeting Minutes and Topic Charts | 21-Jul-97 | Final | Available | 6376.1 | ||
| 98 | SBIRS System Implementation Document (SID) - L099061H | 1-Jun 98 | Final | Available | 6596.1 | ||
| 99 | System Specification for the SBIRS Low Altitude Demonstration System (LADS) | 1-Nov-96 | Draft | Available | 6376.1 | ||
| 100 | JTAGS ILSP SCANNED | 29-Sep-95 | Final | Available | 318 | 5934.1 | |
| 101 | JTAGS P3I Overview SCANNED | 27-Aug-93 | Final | Available | 319 | 5935.1 | |
| 102 | JTAGS TES Processing Element SCANNED | 1-Mar-96 | Final | Available | 320 | 5936.1 | |
| 103 | JTAGS Ground Station Smart Book SCANNED | 27-Aug-93 | Final | Available | 321 |
5937.1 | |
| 104 | JTAGS Theater Ballistic Missile TRAJ EST SCANNED | 13-Dec-95 | Final | Available | 322 | 5938.1 | |
| 105 | JTAGS Production Communication Subsystem SCANNED | 11-Jul-96 | Final | Available | 323 | 5939.1 | |
| 106 | JTAGS Operations Concept SCANNED | 30-Jan-95 | Final | Available | 324 | 5940.1 | |
| 107 | JTAG Level Of Repair Analysis (LORA) SCANNED | 28-Jul-95 | Final | Available | 325 | 5941.1 | |
| 108 | JTAGS Materiel Fielding Plan SCANNED | 18-Jan-96 | Final | Available | 326 | 5942.1 | |
| 109 | JTAGS Conformed Contract SCANNED | 8-Sep-94 | Final | Available | 327 | 5943.1 | |
| 110 | JTAGS Production & Deployment Option SOW SCANNED | 30-Mar-95 | Final | Available | 328 | 5944.1 | |
| 111 | JTAGS Production CDRLs SCANNED | 1-Jun-90 | Final | Available | 329 | 5945.1 | |
| 112 | JTAGS Trainee Guide SCANNED | 31-May-95 | Final | Available | 330 | 5946.1 | |
| 113 | JTAGS Processor Description SCANNED | 1-Jun-95 | Final | Available | 331 | 5947.1 | |
| 114 | JTAGS Detachment Standing Operating Procedures (SOP) | 26-Jul-95 | Final | Available | 266 | 5796.1 | |
| 115 | SBIRS TI Target Information W/Defense Planning Guidance | 24-Oct-95 | Final | Available | 260 | 5790.1 | |
| 116 | JTAGS PAC3 COEA Scenarios | 27-Oct-95 | Final | Available | 258 | 5788.1 | |
| 117 | Prioritized List Of NMD And TMD Threats For SMTS With SMC/IN Clarification Request | 5-Oct-95 | Final | Available | 259 | 5789.1 | |
| 118 | IR Masint for Single Sensor Altitude Determination | 30-Sep-94 | Final | Available | 190 |
5654.1 | |
| 119 | CTPP/JTAGS CSCI v10.0.2 Source, Executables and Data Tar Format, bs29 (8 mm tape) - (unable to reporduce) | 28-Sep-95 | Final | Available | 110 | 5641.1 | |
| 120 | ARMY Operational Requirements Document (ORD) For The Joint Tactical Ground Station (JTAGS) First To Fire | 23-Mar-94 | Final | Available | 175 | 5801.1 | |
| 121 | Joint Tactical Ground Station (JTAGS) Technical Requirements Document (TRD) Revision F | 24-Feb-95 | Final | Available | 176 | 5802.1 | |
| 122 | Draft Space-Based Infrared System (SBIRS) Capstone Concept Of Operations (CONOPS) Version: 9.8 | 27-May-96 | Final | Available | 206 | 5960.1 | |
| 123 | Space Based Infrared Systems (SBIRS) Cost Models Passive Sensor Cost Model (FOR SPACE SENSOR PAYLOAD APPLICATIONS) (except Appendix C) | 17-Jan-95 | Final | Available | 207 | 5970.1 | |
| 124 | Cost Estimating Relationships (CERs) For Software Development | 22-May-96 | Final | Available | 208 | 5971.1 | |
| 125 | Defense Communications Agency Cost And Planning Factors Manual (Includes Software Diskettes) | 1-Mar-83 | Final | Available | 209 | 5972.1 | |
| 126 | SBIRS Ground Segment IDR Charts Volume I | 11-Apr-97 | Final | Available | 6378.1 | ||
| 127 | SBIRS Ground Segment IDR Charts Volume II | 11-Apr-97 | Final | Available | 6378.1 | ||
| 128 | NMD (C2) Requirements Impacts to SBIRS | 19-Aug-97 | Final | Available | 6380.1 | ||
| 129 | ICWG-12 Meeting Minutes #3 and Topics Charts | 19-Aug-97 | Final | Available | 6381.1 | ||
| 130 | SBIRS Ground Segment Inc 1 FDR (CD-ROM) | 11-Sep-97 | Final | Available | 6387.1 | ||
| 131 | August 1997 SBIRS Technology Report (Word 6.0) | 31-Aug-97 | Final | Available | 6385.1 | ||
| 132 | Architecture Charts excerpted from SFR presentation for SBIRS Low Industry Day | 26-Jun-97 | Final | Available | 6383.1 | ||
| 133 | Draft Proposed Language for SBIRS ORD | 14-Jun-97 | Draft | Available | 6384.1 | ||
| 134 | SBIRS System Testbed Schedule - Increment 1 | 5-Sep-97 | Draft | Available | 6388.1 | ||
| 135 | SBIRS System Testbed Schedule - Increments 2&3 | 5-Sep-97 | Draft | Available | 6389.1 | ||
| 136 | The Cost-Risk Identification and Management System | 1-Jul-95 | Final | Available | 6390.1 | ||
| 137 | Air Force Analysis Handbook; Volume 1: Cost Risk | 1-Jan-95 | Final | Available | 6391.1 | ||
| 138 | NMD Technical Report | 30-Apr-97 | Final | Available | 6392.1 | ||
| 139 | SBIRS Security Protection Guide (SPG)- w/12 Mar Notation (Also see Doc #57) | 1-Oct-97 | Final | Available | 5461.1 | ||
| 140 | SBIRS SPG - Annex 1 (Also see Doc #57) | 1-Oct-97 | Final | Available | 5460.1 | ||
| 141 | SBIRS Increment 1 Ground Segment Specification | 4-Sep-97 | Final | Available | 6394.1 | ||
| 142 | SBIRS MCS Element Specification | 1-Nov-97 | Final | Available | 6395.1 | ||
| 143 | SBIRS Ground segment Transition Plan - Increment 1 Baselines | 5-Aug-97 | Final | Available | 6396.1 | ||
| 144 | SBIRS Relay Ground Station Element Specification | 1-Nov-97 | Final | Available | 6397.1 | ||
| 145 | SBIRS Low Industry Day #2 - Presentations (16 Oct 97) | 16-Oct-97 | Final | Available | 6401.1 | ||
| 146 | ICWG-12 - SBIRS System Architecture Charts | 24-Sep-97 | Final | Available | 6402.1 | ||
| 147 | ICWG- 12 - Subject Meeting Presentations | 27-Sep-97 | Final | Available | 6411.1 | ||
| 148 | OBE Superseded by Doc #246 - 1996 National Missile Defense System Threat Assessment | 1-Oct-96 | Final | Delete | 5979.1 | ||
| 149 | Increment 1 Ground Segment Design Document - Volume 1: Overview | 29-Aug-97 | Final | Available | 6405.1 | ||
| 150 | Increment 1 Ground Segment Design Document - Volume 2: Application Software Items | 29-Aug-97 | Final | Available | 6406.1 | ||
| 151 | Increment 1 Ground Segment Design Document - Volume 3: Services and Infrastructure Software items | 29-Aug-97 | Final | Available | 6407.1 | ||
| 152 | Increment 1 Ground Segment Design Document - Volume 4: Hardware | 29-Aug-97 | Final | Available | 6408.1 | ||
| 153 | Increment 1 Ground Segment Design Document - Volume 5: Requirements Traceability | 29-Aug-97 | Final | Available | 6409.1 | ||
| 154 | Draft Low Technical Allocation Document (LTAD) | 9-Jan-98 | Draft | Available | 6412.1 | ||
| 155 | LTAD Issues Matrix | 10-Apr-98 | Draft | Available | 6404.1 | ||
| 156 | September SBIRS Technology Report (Word 6.0) | 15-Oct-97 | Final | Available | 6412.1 | ||
| 157 | SBIRS Integrated Test & Evaluation Plan - Zip Drive | 30-Sep-97 | Draft | Available | 6400.1 | ||
| 158 | Increment 1 - ICDs - Each on Separate Disk | 1-Jan-98 | Draft | Available | 6398.1 | ||
| 159 | Increment 1 - ICDs - Each on Separate Disk | Jan-98 | Draft | Available | 6399.1 | ||
| 160 | TI QDR Study Suggestions - for Industry Comment | 10-Nov-97 | Draft | Available | 6410.1 | ||
| 161 | Proposed Changes to the SBIRS ORD - TI QDR Study | 13-Nov-97 | Draft | Available | 6413.1 | ||
| 162 | SBIRS Interim Report to 13 Nov 97 AFSPC User's Meeting - TI/BSC QDR Requirements | 13-Nov-97 | Final | Available | 6414.1 | ||
| 163 | SBIRS CEIT Software | 8-Dec-97 | Final | Available | 6416.1 | ||
| 164 | SBIRS Scenario Description Document (SDD) | 1-Sep-95 | Final | Available | 6418.1 | ||
| 165 | SBIRS Increment 2 - Ground PDR | 17-Nov-97 | Final | Available | 6415.1 | ||
| 166 | Increment 1 and Increment 2 Report Time Allocation and Latency Analysis (L106299-1) | 15-Oct-97 | Final | Available | 6419.1 | ||
| 167 | LEO Performance Analysis | 7-Jul-97 | Final | Available | 6420.1 | ||
| 168 | Space Surveillance Astrodynamic Standards (AFSPCI60-102) | 11-Mar-96 | Final | Available | 6421.1 | ||
| 169 | Space Surveillance Operations (UI10-40) | 2-Sep-97 | Final | Available | 6422.1 | ||
| 170 | SBIRS High PDR (CD-ROM) | 12-Dec-97 | Final | Available | 6423.1 | ||
| 171 | October SBIRS Technology Report (Word 95) | 15-Nov-97 | Final | Available | 6424.1 | ||
| 172 | November SBIRS Technology Report (Word 95) | 15-Dec-97 | Final | Available | 6425.1 | ||
| 173 | Allocation of Probability of Warning (L106387) | 1-Dec-97 | Final | Available | 6426.1 | ||
| 174 | SBIRS Low Componenet Requirements Task Force: Technical Intelligence/ Battlespace Characterization Kickoff Presentation | 1-Sep-97 | Final | Available | 6427.1 | ||
| 175 | 2 Oct 97 IR Signature Request - NAIC-TANS (3.5" diskette) | 2-Oct-97 | Final | Available | 6428.1 | ||
| 176 | 4 Nov 97 IR Signature Request - NAIC-TANS (3.5" Diskette) | 4-Nov-97 | Final | Available | 6429.1 | ||
| 177 | MIG 21 Afterburning Signatures | 1-Dec-97 | Final | Available | 6430.1 | ||
| 178 | SBIRS Increment 3 Technical Requirements Document (TRD) | 8-Jan-98 | Draft | Available | 6431.1 | ||
| 179 | System Safety Plan | 3-Nov-97 | Draft | Available | 6433.1 | ||
| 180 | System Security Plan | 31-Mar-97 | Draft | Available | 6434.1 | ||
| 181 | System Transition Plan | 27-Oct-97 | Draft | Available | 6435.1 | ||
| 182 | System Transition Plan | 27-Oct-97 | Draft | Available | 6436.1 | ||
| 183 | System Risk Mitigation Plan | 5-Sep-97 | Draft | Available | 6437.1 | ||
| 184 | HOSV Risk Mitigation Plan | 30-Jan-98 | Draft | Available | 6438.1 | ||
| 185 | Ground Risk Mitigation Plan | 12-May-97 | Draft | Available | 6439.1 | ||
| 186 | ADR (Anomaly Detection and Resolution) Verification Plan | 2-Mar-97 | Draft | Available | 6440.1 | ||
| 187 | EMC (Electromagnetic Capability) Control Plan | 1-Jul-97 | Draft | Available | 6441.1 | ||
| 188 | ESD (Electrostatic Discharge) Control Plan | 1-Jul-97 | Draft | Available | 6442.1 | ||
| 189 | M&P (Material & Processes) Control Plan | 5-Sep-97 | Draft | Available | 6443.1 | ||
| 190 | Contamination Control Plan | 5-Sep-97 | Draft | Available | 6444.1 | ||
| 191 | Parts, M&P Control Plan | 2-Sep-97 | Draft | Available | 6445.1 | ||
| 192 | SBIRS Ground Segment Transition Plan | 28-Oct-97 | Draft | Available | 6446.1 | ||
| 193 | P4I (Pre-Planned Product & Process Improvement) Plan | 15-Sep-97 | Draft | Available | 6447.1 | ||
| 194 | Risk Mitigation Plans | 22-Jun-96 | Draft | Available | 6448.1 | ||
| 195 | Integrated T&E (Test & Evaluation) Plan | 19-Dec-97 | Draft | Available | 6449.1 | ||
| 196 | Software Development Plan | 12-Nov-97 | Draft | Available | 6450.1 | ||
| 197 | SBIRS Interface Control Plan (ICP) | 24-Nov-97 | Draft | Available | 6451.1 | ||
| 198 | Mishap Risk Report Vol 1 | 24-Jun-97 | Draft | Available | 6452.1 | ||
| 199 | Mishap Risk Report Vol 2 | 29-Aug-97 | Draft | Available | 6453.1 | ||
| 200 | Range Safety Requirements | 15-Aug-97 | Draft | Available | 6454.1 | ||
| 201 | MTBCF (Mean Time Between Critical Failures) Requirements | 18-Feb-97 | Draft | Available | 6455.1 | ||
| 202 | Flash X-ray Test Requirement | 11-Mar-97 | Draft | Available | 6456.1 | ||
| 203 | Survivability Design Assessment | 30-May-97 | Draft | Available | 6457.1 | ||
| 204 | Ground & Space Vehicle Reliability & Dependability Assessment | 18-Sep-97 | Draft | Available | 6458.1 | ||
| 205 | FMECA (Failure Modes, Effects and Criticality Analysis) Dependability Calculations | 14-Aug-97 | Draft | Available | 6459.1 | ||
| 206 | Increment 2 - ICDs | 9-Jan-98 | Draft | Available-mstheme--> | 6460.1 | ||
| 207 | Increment 2 - ICDs | 9-Jan-98 | Draft | Available | 6461.1 | ||
| 208 | Logistics Planning Document | 20-Nov-97 | Draft | Available | 6462.1 | ||
| 209 | SEU Environment Modeling | 7-Mar-97 | Draft | Available | 6463.1 | ||
| 210 | Increment 1, System Performance in Threat Environment | 10-Jun-97 | Draft | Available | 6464.1 | ||
| 211 | Security Logistics Input | 25-Jun-97 | Draft | Available | 6465.1 | ||
| 212 | Dependability Metric | 24-Nov-97 | Draft | Available | 6466.1 | ||
| 213 | EMC/EMI Specification | 11-Aug-97 | Draft | Available | 6467.1 | ||
| 214 | Threat Excursion Analysis | 10-Feb-97 | Draft | Available | 6468.1 | ||
| 215 | HEO Dependability | 2-Sep-97 | Draft | Available | 6469.1 | ||
| 216 | Single Sat. Simultaneity Requirements | 25-Mar-97 | Draft | Available | 6470.1 | ||
| 217 | Payload LOS Requirements | 19-Aug-97 | Draft | Available | 6471.1 | ||
| 218 | Increment 1 Requirements VCRM (Verification Cross Reference Matrix) | 20-Nov-97 | Draft | Available | 6472.1 | ||
| 219 | Increment 2 Design VCRM | 21-Nov-97 | Draft | Available | 6473.1 | ||
| 220 | Increment 1 Requirement Verification Plan | 20-Nov-97 | Draft | Available | 6474.1 | ||
| 221 | Increment 2 Design Verification Plan | 21-Nov-97 | Draft | Available | 6475.1 | ||
| 222 | Min. Threat Intensity Profile | 8-Aug-97 | Draft | Available | 6476.1 | ||
| 223 | Functional Area (FA) Orientation | 15-Oct-97 | Draft | Available | 6477.1 | ||
| 224 | Theater FA Processing | 24-Jul-97 | Draft | Available | 6478.1 | ||
| 225 | EM Technical Performance Measures | 21-Aug-97 | Draft | Available | 6479.1 | ||
| 226 | System TPMs - SEIT Browser | Monthly | Draft | Available | 6480.1 | ||
| 227 | Space TPMs - SEIT Browser - Same as 226 above | Monthly | Draft | Available | 6481.1 | ||
| 228 | Ground TPMs | 14-Nov-97 | Draft | Available | 6482.1 | ||
| 229 | Laser Operations With DSP Satellites | 4-Feb-98 | Final | Available | 6483.1 | ||
| 230 | SBIRS STAR - Draft Revisions for July Release | Jul-98 | Draft | Available | 6484.1 | ||
| 231 | SBIRS Low Industry Day #3 Charts (Powerpoint 95 5.8MB) | 28-Jan-98 | Final | Available | 6485.1 | ||
| 232 | SBSSO ACTD Implementation Directive | Nov-97 | Final | Available | 6486.1 | ||
| 233 | MSX Space Based Visible CONOPS | 24-Nov-97 | Draft | Available | 6487.1 | ||
| 234 | SBSSO ACTD Management Plan | Jan-98 | Draft | Available | 6488.1 | ||
| 235 | SBIRS HOSV Specification | 12-Nov-97 | Final | Available | 6489.1 | ||
| 236 | SBIRS Ground Segment Specification | 12-Nov-97 | Final | Available | 6490.1 | ||
| 237 | SBIRS High CARD | Dec-97 | Final | Available | 6491.1 | ||
| 238 | ICWG 12 #6 - Presentations | 28-Jan-98 | Final | Available | 6492.1 | ||
| 239 | Same as #238 above | 6493.1 | |||||
| 240 | SBIRS Space - Ground Communication Link Budgets (EM-01038) | 14-Nov-97 | Draft | Available | 6494.1 | ||
| 241 | BE SIM License Agreement/ Request | 9-Feb-98 | Final | Available | 6495.1 | ||
| 242 | SBIRS TED (NAIC-1574-0727-98) | 1-Nov-97 | Draft | Available | 6496.1 | ||
| 243 | RRG Military Utility Charts | 17-Mar-96 | Final | Available | 5810.1 | ||
| 244 | SBIRS 1998 Draft ORD Update Requirements Correlation Matrix (RCM) | 20-Feb-98 | Draft | Available | 6502.1 | ||
| 245 | Proposed LTAD Issues Matrix Revisions | 6-Feb-98 | Draft | Available | |||
| 246 | NMD STAR (Replaces Docs #46, 47, 148) | 5-Dec-97 | Draft | Available | 6500.1 | ||
| 247 | TMD Capstone STAR (BMDO-DTC-0001-97) | 24-Nov-97 | Draft | Available | 6499.1 | ||
| 248 | NMD D & A C3 Document (SPC97-874) (CD-ROM) | 16-Oct-97 | Draft | Available | 6501.1 | ||
| 249 | SBIRS Technical Intelligence QDR Study Final Briefing | Dec-98 | Final | Available | 6503.1 | ||
| 250 | The Spacecraft Attitude Control System | 8-Dec-97 | Final | Available | 6504.1 | ||
| 251 | The Enemy Missile Positioning System by the Space Based Infrared Sensor | 8-Dec-97 | Final | Available | 6505.1 | ||
| 252 | Ground Segment Interfaces for Inc 1 (HZ232660 sections 2, 4 - 10) | 12-Jan-98 | Final | Available | 6507.1 | ||
| 253 | Ground Segment Interfaces for Inc 1 (HZ232660 appendices B and C redlines) | 6-Jan-98 | Draft | Available | 6508.1 | ||
| 254 | Analysis of Laser Effects on SBIRS | 3-Mar-98 | Final | Available | 6509.1 | ||
| 255 | Ballistic Missile Reference Document: Theater Systems (PC-1030-0012-97) - CD ROM | Jul-97 | Final | Available | 6510.1 | ||
| 256 | Draft SBIRS ORD System Performance Requirements | 11-Mar-98 | Draft | Available | 6511.1 | ||
| 257 | LTAD Worst Day Analysis | 19-Feb-98 | Draft | Available | 6512.1 | ||
| 258 | NMD Design/ Analyze to Scenarios Version 6.2 (aka ISTC Test Data) SPC98-089A (CD-ROM) | 8-Jul-97 | Final | Available | 6513.1 | ||
| 259 | Interface Requirements Specification for the TM93 Threat Model, CSCI 020-47 | 15-Nov-95 | Final | Available | 6514.1 | ||
| 260 | Northeast Asia II (5 CD-ROMs and Documentation) SPC98-062 through 066, SPC98-096 | 24-Sep-96 | Final | Available | 6515.1 | ||
| 261 | Southwest Asia North (CD-ROM and Documentation) SPC97-577, SPC98-099 | 30-Jan-97 | Final | Available | 6516.1 | ||
| 262 | Northeast Asia (NEA) Campaign Scenario II, Volume II: 2005-2010 Era - Duplicate of Doc #20 | 1-Mar-96 | Final | Available | 6517.1 | ||
| 263 | Southwest Asia (SWA) North Campaign Scenario, Volume II: 2005-2010 Era - Duplicate of Doc #22 | 19-Jan-96 | Final | Available | 6518.1 | ||
| 264 | SBIRS Low SoS Briefing to the DoDSA | 24-Mar-98 | Available | 6519.1 | |||
| 265 | SBIRS High Satellite Subpoints (Combined on disk #265 & 266) | 30-Mar-98 | Available | 6520.1 | |||
| 266 | Shared Threshold Allocation (Combined on disk #265 & 266) | 31-Mar-98 | Available | 6521.1 | |||
| 267 | Recent MSX Analysis (AS-98-00066) | 5-Feb-98 | Available | 6522.1 | |||
| 268 | Draft Message-Embedded Cyclic Redundancy Check Standard for NORAD and USSPACECOM Missions (N/SP-STD-1500B) | 7-Nov-97 | Available | 6523.1 | |||
| 269 | Draft Advanced Data Communication Control Procedures (ADCCP) within the Integrated Tactical Warning/Attack Assessment (TW/AA) System (N/SP-STD-1200B) | 20-Nov-97 | Available | 6524.1 | |||
| 270 | Draft Standard Protocol for Survivable and Very Survivable Integrated Tactical Warning and Attack Assessment System Broadcast Communications N/SP-STD-1300A | 28-Feb-97 | Available | 6525.1 | |||
| 271 | Satellite Disposal Procedures | 3-Nov-97 | Available | 6526.1 | |||
| 272 | START II and ABM Treaty Protocol/Agreement | 2-Oct-97 | Available | 6527.1 | |||
| 273 | 2 Documents - Data Collection Exercise (DCE) - Post Test Report (U) and Post Test Summary Report - Zip Drive | Mar-98 | Available | 6528.1 | |||
| 274 | RFI Data - Contact Maj McIntyre (310-363-1194 for review) | Mar-98 | Draft | Restricted | 6529.1 | ||
| 275 | Flight Demonstration System (FDS) AP4 &ApS4/II - paper | 3-Feb-98 | Final | Available | 6530.1 | ||
| 276 | FDS Frequency Application (1494) - paper | 19-Nov-97 | Final | Available | 6531.1 | ||
| 277 | LADS Frequency Application (1494) - paper | 30-Oct-97 | Final | Available | 6532.1 | ||
| 278 | LADS AP4 & ApS4/II - paper | Feb-98 | Final | Available | 6533.1 | ||
| 279 | Charts from Industry Day #4 - RFI Slide Session - Maj McInTyre - Paper | 21-Apr-98 | Final | Available | 6534.1 | ||
| 280 | Frequency Management Meeting Minutes - paper | 21-Apr-98 | Final | Available | 6535.1 | ||
| 281 | Brilliant Eyes Frequency Application (1494) - paper | 4-May-94 | Final | Available | 6536.1 | ||
| 282 | SBIRS Low X-Link ApS4/II - paper | Apr-98 | Final | Available | 6537.1 | ||
| 283 | Inc 3 Revision of the TRD - Diskette | Final | Available | 6538.1 | |||
| 284 | Industry Day Briefings #4 - Draft STAR Changes - Lt King - paper | 21-Apr-98 | Final | Available | 6539.1 | ||
| 285 | Industry Day Briefings #4 - Unclassified (see below) | 21-Apr-98 | Final | Available | 6540.1 | ||
| Attendence List (Word 95 - 31K) | 21-Apr-98 | Final | Available | ||||
| RFP Update - Maj Nate Ply (Powerpoint 4.0 - 1069K) | 21-Apr-98 | Draft | Available | ||||
| Joint Spectrum Center (JSC) Overview Mr Richard DeSalvo (Powerpoint 4.0 - 517K) | 21-Apr-98 | Final | Available | ||||
| SBIRS Low PD Draft Requirements Study Plan - Maj Bryan Scruggs (Powerpoint 4.0 - 298K) | 21-Apr-98 | Draft | Available | ||||
| SBIRS Low Frequency Management - Mr Kevin Bell (Powerpoint 4.0 - 87K) | 21-Apr-98 | Final | Available | ||||
| EMD Risk Mitigation Matrix - Ms Michele Johnson (Powerpoint 4.0 - 866K) | 21-Apr-98 | Draft | Available | ||||
| OCI Refresher - Maj Paul McInTyre (Powerpoint 4.0 - 36K) | 21-Apr-98 | Draft | Available | ||||
| Agenda for Industry Day #4 - Patrick E. Garel (Powerpoint 4.0 - 170K) | 21-Apr-98 | Final | Available | ||||
| National Space Communications Program (NSCP) Overview - Capt Randy White - paper | 21-Apr-98 | Final | Available | ||||
| 286 | Data Collection Experiment Briefing (MiRACL/MSTI - paper | 12-Mar-98 | Final | Available | 6541.1 | ||
| 287 | PBV Description for NMD Capability 2 Desgin-To and Analyze-To Scenario Missile types - paper | 17-Feb-98 | Available | 6542.1 | |||
| 288 | Capability 1 Threat Extracts from Capability 1 NMD Sys Eng Notebook - Paper | 24-Apr-97 | Draft | Available | 6543.1 | ||
| 289 | Capability 2 Threat Extracts from the NMD Sys Eng Notebook Draft - paper | 16-May-97 | Draft | Available | 6544.1 | ||
| 290 | SS-X-27 System Description - paper | 29-Dec-97 | Draft | Available | 6545.1 | ||
| 291 | Interface Requirements Document (IRD) between the SBIRS High Component and the Low Component | 22-May-98 | Draft | Available | 6546.1 | ||
| 292 | Low Backbone Allocation | 31-Mar-98 | Available | 6547.1 | |||
| 293 | SBIRS Database Binary File from RTM (L227909) - CD Rom | 6-May-98 | Final | Available | 6548.1 | ||
| 294a | South
West Asia (SWA) - South Campaign Scenario (U) Volume I: 1997-2002 ERA (U) - Paper - Updates #23 |
15-Dec-95 | Final | Available | 6549.1 | ||
| 294b | South West Asia (SWA) - South Campaign Scenario (U) Volume II: 2005-2010 ERA (U) - Paper -Updates #23 | 15-Apr-96 | Final | Available | 6550.1 | ||
| 295 | East Asia V2.0 - CD | 8-Aug-97 | Final | Available | 6551.1 | ||
| 296 | Southwest Asia South Documentation, V2.0 - CD | 5-Feb-97 | Final | Available | 6552.1 | ||
| 297 | SWA South Version 2.0 - CD | 27-Jun-97 | Final | Available | 6553.1 | ||
| 298 | RAD ORD Column Revisions - Disk | 14-May-97 | Draft | Available | 6554.1 | ||
| 299 | Projected Material Properties for Ballistic Missile Payload Aeroshells - paper | Apr-98 | Final | Available | 6555.1 | ||
| 300 | ICWG Meeting #12- #9 Minutes and Briefings | 30-Apr-98 | Final | Available | 6556.1 | ||
| 301 | Laser-Foreign Antisatellite Applications - Disk | 1-May-97 | Final | Available | 6557.1 | ||
| 302 | Information Warfare Threats to Automated Information Systems Threat Environment Description - Disk | 1-Apr-97 | Final | Available | 6558.1 | ||
| 303 | ICWG Meeting #12- #1 Minutes and Briefings - Disk | 17-Jun-97 | Final | Available | 6559.1 | ||
| 304 | ICWG Meeting #12- #5 Minutes and Briefings - Disk | 29-Oct-97 | Final | Available | 6560.1 | ||
| 305 | ICWG Meeting #12- #7 Minutes and Briefings - Disk | 25-Feb-98 | Final | Available | 6561.1 | ||
| 306 | ICWG Meeting #12- #8 Minutes and Briefings - Disk | 31-Mar-98 | Final | Available | 6562.1 | ||
| 307 | RFI Data - Contact Maj McIntyre (310-363-1194 for review) | May-98 | Draft | Restricted | 6563.1 | ||
| 308 | 3D-CMHD Simulation of 200 KT at 150 KM Volume 2 - Detailed Graphical Results - paper | Jun-95 | Final | Available | 6564.1 | ||
| 309 | KR/A7 Replacement Files - Disk | 14-May-98 | Final | Temp Hold | 6465.1 | ||
| 310 | Master Target File 1998A - CD Rom | 1-Apr-98 | Final | Temp Hold | 6466.1 | ||
| 311 | Generic Codes - Paper | Apr-98 | Final | Available | 6467.1 | ||
| 312 | Master Target File Summary - Paper | 1-Apr-98 | Final | Available | 6468.1 | ||
| 313 | National Ballistic Missile Defense (NBMD) Capstone Requirements Document (CRD - Paper (Supercedes Doc #9, Updates Doc #10, Replaces Doc #11) | 24-Aug-96 | Final | Available | 6469.1 | ||
| 314 | Ballistic Missile Defense (BMD) Command, Control, and Communications (C3) Operational Requirements Document (ORD) AFSPC 002-97-1 (U) - Paper (Updates #13) | 1-Apr-98 | Draft | Available | 6470.1 | ||
| 315 | Concept of Operations for Ballistic Missile Defense of North America - Paper (Updates #17) | 30-Jan-98 | Draft | Available | 6471.1 | ||
| 316 | Operational Requirements Document for National Missile Defense (U) - Paper | 10-Mar-97 | Final | Available | 6472.1 | ||
| 317 | NMD Capability 1 Target Descriptions (U) Revision 3 (U) - Paper | 21-Apr-98 | Final | Available | 6473.1 | ||
| 318 | NMD Capability 2 Target Descriptions (U) Revision3 (U) - Paper | 3-Apr-98 | Final | Available | 6474.1 | ||
| 319 | NMD Capability 3 Penaid Descriptions (U) Revision 3 (U) - Paper | 30-Mar-98 | Final | Available | 6475.1 | ||
| 320 | OPTISIG5.0 Archive Diskettes (3 Disks) + 2 Reports | May-98 | Available | 6576.1 | |||
| Report 1 - Optical Signatures Code, Vol 6 - FASTSIG/OPTISIG Algorithm Notes | Oct-97 | Final | |||||
| Report 2 - Optical Signatures Code, Vol 8 - OPTISIG User's Manual | Sep-97 | Final | |||||
| 321 | Hill AFB Farsite - Internet Address: Http://farsite.hill.af.mil | Updated Daily | Available | 6577.1 | |||
| 322 | System Performance of Proposed Satellite Nodes - 2 Presentations - ZIP | Available | |||||
| March Report - Ted Kelly | 17-Mar-98 | Final | 6578.1 | ||||
| April Report - Theresa Ito | 9-Apr-98 | Final | 6579.1 | ||||
| 323 | Sensor Criteria Computational Module | Oct-97 | Final | Available | 6580.1 | ||
| 324 | Space System End-to-End Module Development | Nov-97 | Final | Available | 6581.1 | ||
| 325 | Satellite Survivability Design Module - An Overview | Nov-97 | Final | Available | 6582.1 | ||
| 326 | The Impact of RF Noise Injection on Visible Band CCD Satellite Surveillance | 8-Nov-97 | Final | Available | 6583.1 | ||
| 327 | Space Systems Performance in Hostile Environments | Dec-97 | Final | Available | 6584.1 | ||
| 328 | Annex 1, Increment 3 (SBIRS Low Added) SBIRS ORD (Zip) | 3-Jun-98 | Available | 6585.1 | |||
| 329 | Use of Stars for Line of Sight Bias Error Reduction Briefing | 26-May-98 | Final | Available | 6586.1 | ||
| 330 | MSX Early Midcourse Team Analyses: Baseline Algorithms, Functional Demonstrations, and Target Signature Phenomenology Tasks | Jun-98 | Final | Available | 6587.1 | ||
| 331 | SBIRS Requirements Allocation Review Final Outbrie | 12-May-98 | Final | Available | 6588.1 | ||
| 332 | SBIRS QDR Short List Results | 15-May-98 | Final | Available | 6589.1 | ||
| 333 | June 3 Annex to Signed ORD to LCS | 19-Jun-98 | Final | Available | 6590.1 | ||
| 334 | SBIRS Low Program Definition Requirements Study Plan (See 349) | 23-Jun-98 | Draft | Available | 6591.1 | ||
| 335 | SBIRS Low PD RFP Build v.15 | 26-Jun-98 | Draft | Available | 6591.2 | ||
| 336 | SBIRS Capstone Concept of Operations Version 3 | 8-Jun-98 | Available | 6594.1 | |||
| 337 | SBIRS Baseline Update Charts | 18-Jun-98 | Final | Available | 6595.1 | ||
| 338 | SBIRS low Industry Day #5: PD RFP Kickoff | 14-Jul-98 | Final | Available | 6597.1 | ||
| 339 | Lewis Spacecraft Failure Board Conclusions | 8-Jul-98 | Final | Available | 6598.1 | ||
| 340 | SBIRS Low PD Performance Parameters Matrix | 13-Jul-98 | Final | Available | 6599.1 | ||
| 341 | AFMCPAMPHLET 63-101, Risk Management | 14-Jul-98 | Final | Available | 6600.1 | ||
| 342 | SBIRS Requirements Allocation Document (RAD) (For Increment 3) (U) (Update to #72) | 15-Jul-98 | Final | Available | 6601.1 | ||
| 343 | SBIRS High Award Fee And Corporate Commitment | 16-Jul-98 | Available | 6602.1 | |||
| 344 | Corporate Commitment To Mission Readiness | 16-Jul-98 | Available | 6603.1 | |||
| 345 | 20/44 GHz EMI Assessment of Proposed SBIRS Low Fixed Ground Sites in the Continental United States | 16-Jul-98 | Available | 6604.1 | |||
| 346 | SBIRS Single Acquisition Management Plan (SAMP) Annex 1 - SBIRS Test and Evaluation Master Plan (TEMP) | 21-Apr-98 | Available | 6605.1 | |||
| 347 | SBIRS Acronym List | 16-Jul-98 | Available | 6606.1 | |||
| 348 | SBIRS ICD SS0019 Interface Requirements Document (IRD) between the Space Based Infrared System High Component and the Low Component | 17-Jul-98 | Draft | Available | 6607.1 | ||
| 349 | SBIRS Low Program Definition Requirements Study Plan - V6 (Updates 334) | 20-Jul-98 | Draft | Available | 6608.1 | ||
| 350 | Key Input To Reqmt Study Plan - Prior Trade Study Results | 21-Jul 98 | Final | Available | 6609.1 | ||
| 351 | SBIRS System Threat Assessment Report (Star) - Refer to #8 | 14-Jul-98 | Final | Available | 6610.1 | ||
| 352 | SBIRS Single Acquisition Management Plan (SAMP) | 15-Jun-98 | Draft | Available | 6611.1 | ||
| 353 | Annex 1, Increment 3 (SBIRS Low Added) SBIRS ORD (U) - Ref #4, #328 | 17-Jul-98 | Final | Available | 6612.1 | ||
| 354 | Additional Information On SBIRS Increment 3 | 22-Jul-98 | Final | Available | 6613.1 | ||
| 355 | SBIRS Target Intensity Files (U) | 3-Jun-98 | Final | Available | 6614.1 | ||
| 356 | SBIRS-Sim Description and Status | 26-Sep-97 | Final | Available | 6615.1 | ||
| 357 | Status - SBIRS-Sim User/Host Coordination | 30-Jan-98 | Final | Available | 6616.1 | ||
| 358 | Plan and Conduct SOC Demonstrations | 10-Jun-97 | Final | Available | 6617.1 | ||
| 359 | Final SBIRS Low PD RFP | 23-Jul 98 | Final | Available | 6619.1 | ||
| 360 | SBIRS Low Component Sufficiency Review (P483497) | 13-Jul-98 | Draft | Available | 6620.1 | ||
| 361 | SBIRS Sufficiency Review Meeting (P483496) | 13-Jul-98 | Final | Available | 6621.1 | ||
| 362 | December 1997 SBIRS Technology Program | Dec-97 | Available | 6622.1 | |||
| 363 | January 1998 SBIRS Technology Program | Jan-98 | Available | 6623.1 | |||
| 364 | February 1998 SBIRS Technology Program | Feb-98 | Available | 6624.1 | |||
| 365 | March 1998 SBIRS Technology Program BMDO Crycooler Programs | Mar-98 | Available | 6625.1 | |||
| 366 | July 1997 SBIRS Technology Program BMDO Crycooler Programs | Jul-97 | Available | 6626.1 | |||
| 367 | SS-X-27 ICBM Systems | Nov-97 | Final | Available | 6627.1 | ||
| 368 | SS-25 ICBM Characteristics | Nov-97 | Available | 6628.1 | |||
| 369 | SBIRS Ground Segment Transition Plan | 23-Jul-98 | Available | 6629.1 | |||
| 370 | SBIRS Low Altitude - Environment Trades | 18-Feb-97 | Final | Available | 6630.1 | ||
| 371 | Cooperative Engagement Capability (CEC) Briefing (5 Min Video and 57 PPT Briefing Charts | 24-Jul-98 | Final | Available | 6631.1 | ||
| 372 | Software Product Specification (SPS) for the Space Based Infrared System/Wargaming Model (SBIRS/WM) Version 3.0 | 23-Dec-97 | Final | Available | 6632.1 | ||
| 373 | Software Requirements Specification for SBIRS/Wargaming Model Version 3.0 | 29-May-97 | Final | Available | 6633.1 | ||
| 374 | Interface Design Document (IDD) for Space Based Infrared System Wargaming Model (SBIRS/WM) Version 3.0 | 1-Dec-97 | Final | Available | 6634.1 | ||
| 375 | Version Description Document (VDD) for the Space Based Infrared System/Wargaming Model (SBIRS/WM) Version 3.0 | 23-Dec-97 | Final | Available | 6635.1 | ||
| 376 | EELV Annex 6 System Performance Requirements for Development (Disk) | 18-Jun-98 | Available | 6636.1 | |||
| 377 | EELV Annex 1 to Annex 6 System Performance Requirements for Development (Disk) | 26-Jun-98 | Available | 6637.1 | |||
| 378 | EELV Amend #3 to Annex 6 System Performance requirements for Development (Disk) | 14-Jul-98 | Available | 6638.1 | |||
| 379 | EELV Annex 15 EELV Standard Interface Specification Version 5.0 (Disk) | 19-Jun-98 | Available | 6639.1 | |||
| 380 | System Operational Protection Guide (SOPG) for the Defense Support Program (DSP) | 16-Mar-98 | Available | 6640.1 |
Linked files can be accessed using the software indicated.
Wang Imaging Software can be downloaded from: Eastman Software
Date this page was last updated: 28 August 1998
SBIRS Low Technical Library Rules
Return To Sources Sought Synopsis for SBIRS Low Strategy
Return To SBIRS Business Opportunities and Information
SBIRS Program Office
185 Discoverer Blvd., Ste. 2512
El Segundo, CA 90245
Page OPR: Capt. Andy Ouimet
andrew.ouimet@losangeles.af.mil
DSN: 833-2021, Commercial (310)363-2021