|
| Russian Navy |
Specifications | |||
| Designer: | |||
| Builder: | Shipyard 190 Zhdanov (Nothern Yard), Leningrad Shipyard 199 named Lenin Komsomol, Komsomolsk-on-Amur Shipyard 445 named 61 Kommunar (factory #200), Nikolayev |
||
| Project 56M Kildin | Project 56EM | Project 56U Kildin Mod | |
| Displacement (tons): |
2,767 tons standard 3,315 tons full load |
2,890 tons standard 3,447 tons full load |
2,940 tons standard 3,447 tons full load |
Dimensions (m): |
126.1 meters long 12.7 meters beam 4.3 meters draft |
| Complement | 19 officers 251 enlisted | 273 total in Pr.# 56U | |
| Propulsion | 2 geared steam 72,000 shp 2 Shafts | ||
| Endurance | 3,900 NM @ 14 knts 2,400 NM @ 18 knts | ||
| Max Speed | 39 knots | 35 knots | |
| Armament | |||
| Guns | |||
| Missiles | |||
| ASW | |||
| Torpedoes | 4 x 21" (533mm) in two twin launcher | ||
| Systems: |
|
||
Class Listing |
|||||||||
|---|---|---|---|---|---|---|---|---|---|
| Unit | Shipyard | Fleet | Chronology | Notes | |||||
| # | number | Name | Laid Down | Launched | Comm. | Stricken | |||
| 1 | Bedovy | SY 445 | BLACK | 12/01/1953 | 07/31/1955 | 06/30/1958 | 04/25/1989 | Project 56-EM 1972-74 modernized to Project 56-U 1989 scrapped | |
| 2 | Neulovimy | SY 190 | BLACK | 02/23/1957 | 02/27/1958 | 12/30/1958 | 04/19/1990 | completed as Project 56-M 1971-72 modernized to Project 56-U 1974-82 in reserve 1991 scrapped | |
| 3 | Neuderzhimy | SY 199 | PAC | 02/23/1957 | 05/25/1958 | 12/30/1958 | 04/10/1987 | completed as Project 56-M 1985 disarmed training station scrapped | |
| 4 | Prozorlivy | SY 445 | BALTIC | 09/01/1956 | 07/30/1957 | 12/30/1958 | 06/24/1991 | completed as Project 56-M 1976-77 modernized to Project 56-U 1991 scrapped | |
| 5 | Neukrotimy | SY 199 | construction cancelled | ||||||