COST (In Thousands) | FY 1995 Actual | FY 1996 Estimate | FY 1997 Estimate | FY 1998 Estimate | FY 1999 Estimate | FY 2000 Estimate | FY 2001 Estimate | Cost to Complete | Total Cost | ||
Total Program Element (PE) Cost | 28246 | 23861 | 15758 | 20631 | 21235 | 28299 | 27122 | ----- | Continuing | Continuing | |
D113 | Joint Tactical Ground Station | 9435 | 0 | 0 | 0 | 0 | 0 | 0 | ----- | 0 | 32527 |
D909 | Tactical Electronic Surveillance System - Eng Dev | 18811 | 23861 | 15758 | 20631 | 21235 | 28299 | 27122 | ----- | Continuing | Continuing |
Mission Description and Budget Item Justification: This Program Element (PE) supports the engineering development directed at meeting the tactical commanders intelligence mission requirements for contingency force deployment and deep battle surveillance and targeting - as stated in Field Manual 100-5. Specific Signals Intelligence (SIGINT) and multi-spectral developments are managed within the Army's Tactical Exploitation of National Capabilities (TENCAP) program. The scope of the program is directed towards advanced techniques and capabilities to exploit National and selected theater capabilities that uniquely meet stated Army tactical intelligence and targeting needs and deficiencies for near-real-time receipt, analysis, and dissemination to the appropriate tactical echelon. Further details may be found in the Tactical Intelligence and Related Activities (TIARA) Congressional Justification Book, Volume II and the TENCAP Master Plan. The projects in this PE support research efforts in the engineering and manufacturing development phases of the acquisition strategy and are therefore correctly placed in Budget Activity 5.
A. Mission Description and Budget Item Justification This project funds the development of two Engineering and Manufacturing Development (EMD) JTAGS units. The project is a follow-on to the Tactical Surveillance Demonstration (TSD) and Tactical Surveillance Demonstration Enhancement (TSDE) programs (Project D909). JTAGS is designed for in-theater receipt, processing and dissemination of warning and alerting data from Defense Support Program (DSP) sensors and follow-on space based sensors of major tactical events such as missile launches. JTAGS supports active defense, attack operations, and passive defense. By being located in-theater, the system improves the warning and alerting response time and eliminates several single-point-failure susceptible communications relay nodes. It also serves as the in-theater element of the USSPACECOM's Tactical Event System (TES). The warning and cueing information gathered will be disseminated via Tactical Information Broadcast System (TIBS), Tactical Related Application (TRAP) and other existing in-theater communication networks.
Acquisition Strategy: JTAGS transitioned into a formal ACAT III NDI acquisition program at the MS II In-Process Review (IPR) on 6 May 1994. Based on the decision made by the Milestone Decision Authority (MDA), JTAGS entered the Engineering and Manufacturing (EMD) phase. The EMD phase called for design, total integration and delivery of two EMD prototypes. Technical and operational testing was completed in Nov 95. Milestone III approval was obtained on 26 Feb 1996.
FY 1995 Accomplishments:
FY 1996 Planned Program: Project not funded in FY 1996
FY 1997 Planned Program: Project not funded in FY 1997
FY 1996 President's Budget Change Summary Explanation:
Funding: FY 1995: +770 were reprogrammed to support Army priority requirements
Compl Cost BZ8410 Joint Tactical Ground Station (JTAGS) 0208053A JTAGS (TIARA) * Milestones Completed
B. Budget Acquisition History and Planning Information: Not Applicable
6897
Developed and delivered two JTAGS EMD units.
1851
Completed developmental and operational testing of EMD units.
687
Prepared for MS III decision review.
Total
9435
B. Project Change Summary
FY 1995
FY 1996
FY 1997
Previous President's Budget (FY 1996)
8851
0
0
Appropriated Amount (FY 1995)
8665
Adjustments to FY 1995
+770
Appropriated Amount (FY 1996)
Adjustments to FY 1996
Adjustments to Budget Year (FY 1997) since
0
Current Budget Submit
9435
0
0
C. Other Program Funding Summary
FY 1995
FY 1996
FY 1997
FY 1998
FY 1999
FY 2000
FY 2001
To
Total
Other Procurement Army, OPA-2
0
29950
0
3059
2846
0
0
0
35855
RDTE, A Budget Activity 7
2124
3192
5316
D. Schedule Profile
FY 1995
FY 1996
FY 1997
1
2
3
4
1
2
3
4
1
2
3
4
Deliver 1st EMD Prototype
X*
Begin Developmental Test
X*
Deliver 2nd EMD Prototype
X*
Begin Operational Tests
X*
Milestone III IPR
X*
A. Project Cost Breakdown
FY 1995
FY 1996
FY 1997
Prime Contractor
2199
0
0
Contract Engineering Support
2070
0
0
Program Management Support
2600
0
0
Government Engineering Support
2497
0
0
Government Furnished Equipment
69
0
0
Total
9435
0
A. Mission Description and Budget Item Justification: This project supports the engineering development/enhancement of the Electronic Tactical User Terminal (ETUT), Mobile Integrated Tactical Terminal (MITT) (replaces the Tactical High Mobility Terminal (THMT)), Forward Area Support Terminal (FAST), Electronic Processing Dissemination System (EPDS) and Tactical Exploitation System (TES). The Army's emerging TES will incorporate the standards and protocols dictated by the Common Imagery Ground/Surface System (CIG/SS) program. TES brings all of the existing and emerging Army TENCAP capabilities (EPDS, MIES, and ETRAC) into an integrated common baseline; downsized, modular and scaleable to meet a wide range of contingency requirements. TENCAP Common Baseline addresses common subsystems, planned improvements, key activities and ongoing/planned initiatives determined to have potential application to multiple TENCAP systems (including MIES and ETRAC that are funded under the Defense Airborne Reconnaissance Program (DARP) (PE 0305154D)). Graphic Situation Display (GSD) is a jointly funded program to develop a means to computer generate, transmit, and display graphical representations of the battle space thereby saving communicating bandwidth, manpower and time. The beta software portion of the GSD effort was funded with FY 1993 Military Exploitation of Reconnaissance and Intelligence Technology (MERIT) funds.
Acquisition Strategy: As pioneers in rapid acquisition, ASPO's success in delivering systems as those described above to warfighters can be directly attributed to an environment emphasizing stable funding, low density acquisition, minimal use of MILSPECS, and managed competition. By tailoring existing technology, leveraging the best commercial practices, and using commercial and government-off the shelf software, ASPO minimizes risk while maximizing efficiency. Finally, dedicated cradle to grave Integrated Logistics Support (ILS) for TENCAP systems is accomplished through a coordinated effort by Government and contractor personnel and facilities.
FY 1995 Accomplishments:
8980 | Continued software upgrades and enhancements for refinement of the TENCAP Common Baseline to fully exploit National capabilities to meet emerging worldwide contingency scenarios which includes major upgrades to communications component (SUCCESS Radio) which is common to all TENCAP systems. | |
1240 | Continued engineering development of five additional MITTs to replace existing THMT. | |
1330 | Continued the retrofit of ETUT's with enhanced MITT hardware and software. | |
4117 | Initiated effort to upgrade ETUT to include EPDS capabilities, which will allow for the defielding of EPDS systems in FY97. | |
3144 | Continued support to TENCAP program management and administrative activities (e.g. FFRDC (Aerospace), ARL support, ASPO support and Contractor SETA support). | |
Total | 18811 |
FY 1996 Planned Program:
11363 | Continue software upgrades and enhancements for the refinement of the TENCAP Common Baseline to fully exploit National capabilities such as integration of communications capabilities to meet changing architectures and implementation of software appliqué to provide the operational commander with enhanced battlefield intelligence products. | |
891 | Complete the retrofit of ETUT with enhanced MITT hardware and software. | |
3957 | Continue effort to upgrade ETUT to include EPDS capabilities. | |
900 | Complete building/fielding of five additional MITTs. | |
480 | Initiate engineering development of TES. | |
5675 | Continue support to TENCAP program management and administrative activities (e.g. FFRDC (Aerospace), ARL support, ASPO support , Army Topographic Engineering Center (TEC) and Contractor SETA support). | |
527 | Small Business Innovation Research (SBIR)/Small Business Technology Transfer (STTR) | |
68 | Revised Economic Assumptions amount not available for execution. | |
Total | 23861 |
FY 1997 Planned Program:
5556 | Continue software upgrades and enhancements for the refinement of the TENCAP Common Baseline to fully exploit National capabilities such as integration of communications capabilities to meet changing architectures and implementation of software appliqué to provide the operational commander with enhanced battlefield intelligence products. | |
5550 | Continue engineering development of TES. | |
1246 | Complete effort to upgrade ETUT to include EPDS capabilities. | |
3406 | Continue support to TENCAP program management and administrative activities (e.g. FFRDC (Aerospace), ARL support, ASPO support , Army Topographic Engineering Center (TEC) and Contractor SETA support). | |
Total | 15758 |
B. Project Change Summary | FY 1995 | FY 1996 | FY 1997 | |
Previous President's Budget (FY 1996) | 19214 | 24699 | 15302 | |
Appropriated Amount (FY 1995) | 18811 | |||
Adjustments to FY 1995 | ||||
Appropriated Amount (FY 1996) | 24101 | |||
Adjustments to FY 1996 | -240 | |||
Adjustments to Budget Year (FY 1997) since
FY 1996 President's Budget |
+456 | |||
Current Budget Submit/President's Budget | 18811 | 23861 | 15758 |
Change Summary Explanation: Funding: FY 1996: (-240) Revised Economic Assumptions inflation rates.
C. Other Program Funding Summary | FY 1995 | FY 1996 | FY 1997 | FY 1998 | FY 1999 | FY 2000 | FY 2001 | To
Compl |
Total
Cost | |
RDTE, A Budget Activity 4
PE 0603730A Project D560 Tact Surv Sys - Adv Dev |
11481 | 0 | 0 | 0 | 0 | 0 | ||||
PE 0603766A Project D907
TENCAP-Adv Dev |
14519 | 27460 | 26060 | 23200 | 27094 | 28151 | 32668 | Cont | Cont | |
RDTE, A Budget Activity 4
PE 0604740A Project D662 Tact Surv Sys - Eng Dev |
2049 | 0 | 0 | 0 | 0 | 0 | 0 | |||
RDTE, D Budget Activity 7
PE 0305154D Project P531 DARP |
39313 | 42737 | 47780 | 35264 | 13750 | 13824 | 13723 | Cont | Cont | |
Other Procurement Army, OPA-2 | 4636 | 4473 | 1758 | 1705 | 1758 | 4678 | 13936 | Cont | Cont | |
BA0329 DARP | 2411 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Procurement, Defense Wide
PE 0305154D |
51534 | 80822 | 98486 | 94583 | 76123 | 72124 | 67173 | Cont | Cont |
D. Schedule Profile | FY 1995 | FY 1996 | FY 1997 |
1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | |||||
Initiate upgrade to ETUT with EPDS capabilities | X* | |||||||||||||||
Complete Development and Field five Additional MITTs | X* | |||||||||||||||
Complete Retrofit and Refield ETUTs | X | |||||||||||||||
Complete and Field DAMA Appliqué into SUCCESS Radios | X | |||||||||||||||
Initiate Engineering Development of TES | X | |||||||||||||||
Install GSD into FAST Systems | X | |||||||||||||||
Complete upgrade to ETUT with EPDS capabilities | X |
* Milestone completed
A. Project Cost Breakdown | FY 1995 | FY 1996 | FY 1997 | |
MITT | 1240 | 900 | 0 | |
ETUT | 5447 | 4848 | 1246 | |
TES | 0 | 480 | 5550 | |
Common Baseline (*1) | 8980 | 11363 | 5556 | |
FFRDC (*2) | 995 | 1767 | 1326 | |
System Engineering (Contractor) (*2) | 2149 | 3908 | 2080 | |
SBIR/STTR | 527 | |||
Revised Economic Assumptions amount not available for
Execution |
68 | |||
Total | 18811 | 23861 | 15758 |
(*1) TENCAP Common Baseline addresses common subsystems, planned improvements, key activities and ongoing/planned initiatives determined to have potential application to multiple TENCAP systems (including MIES and ETRAC that are funded under the DARP (PE 0305154D)
(*2) In FY 1996 and beyond, efforts previously funded under 0604740A.D662 are consolidated into this project
B. Budget Acquisition History and Planning Information: Not Applicable