COST (In Thousands) | FY 1995 Actual | FY 1996 Estimate | FY 1997 Estimate | FY 1998 Estimate | FY 1999 Estimate | FY 2000 Estimate | FY 2001 Estimate | Cost to Complete | Total Cost | ||
D907 | Tactical Electronic Surveillance System - Adv Dev | 14519 | 27460 | 26060 | 23200 | 27094 | 28151 | 32668 | ----- | Continuing | Continuing |
A. Mission Description and Budget Item Justification: Supports the tactical commander's intelligence requirements for contingency force development and deep battle targeting as stated in Field Manual 100-5. Specific developments are managed within the Army's Tactical Exploitation of National Capabilities (TENCAP) program. The scope of the program is to leverage specific data and capabilities available from existing and emerging National and selected theater capabilities that meet stated Army tactical intelligence information and targeting needs to correct deficiencies, and develop concepts, techniques and prototype processors to exploit critical data for near-real time integration into the appropriate tactical echelon. This project supports the advanced development/enhancement of the Electronic Tactical User Terminal (ETUT), Mobile Integrated Tactical Terminal (MITT) (replaces the Tactical High Mobility Terminal (THMT)), Forward Area Support Terminal (FAST), Tactical Exploitation System (TES), and Electronic Processing and Dissemination System (EPDS). The Army's emerging TES will incorporate the standards and protocols dictated by the Common Imagery Ground Surface System (CIGSS) program. TES brings all of the existing and emerging Army TENCAP capabilities (EPDS, MIES, and ETRAC) into an integrated common baseline; downsized modular and scaleable to meet a wide range of contingency requirements. TENCAP Common Baseline addresses common subsystems, planned improvements, key activities and ongoing/planned initiatives determined to have potential application to multiple TENCAP systems, including MIES and ETRAC that are funded under the Defense Airborne Reconnaissance Program (DARP) (PE 0305154D). Specific details are provided in the Tactical Intelligence and Related Activities (TIARA) Congressional Justification Book, Volume II, and in the Army TENCAP Master Plan. This Program Element (PE) focuses on efforts associated with advanced technology development used to demonstrate general military utility to include demonstration and validation in the area of TENCAP and is correctly placed in Budget Activity 4.
Acquisition Strategy: As pioneers in rapid acquisition, ASPO's success in delivering systems as those described above to warfighters can be directly attributed to an environment emphasizing stable funding, low density acquisition, minimal use of MILSPECS, and managed competition. By tailoring existing technology, leveraging the best commercial practices, and using commercial and government-off the shelf software, ASPO minimizes risk while maximizing efficiency. Strong user involvement and a robust operations and maintenance program and a vigorous P3I effort ensure programmatic success. Finally, dedicated cradle to grave Integrated Logistics Support (ILS) for TENCAP systems is accomplished through a coordinated effort by Government and contractor personnel and facilities.
FY 1995 Accomplishments:
8790 | Continued to pursue technology for the refinement of the TENCAP Common Baseline for fully exploiting National Capabilities to meet the changing environment (to include Demand Assign Multiple Access (DAMA) Appliqué into Common Baseline Synthesized UHF Computer Controlled Sub-System (SUCCESS) radios and support to the Joint Collection Management Tool (JCMT), the follow-on to the Army's Collection Management Support Tools (CMST). | |
736 | Initiated study for concept design of the TES. | |
664 | Continued advanced development efforts to retrofit ETUTs with enhanced MITT hardware and software. | |
836 | Conducted concept design study for incorporating EPDS functionality into ETUT. | |
3493 | Continued support to TENCAP program management with administrative activities (e.g. FFRDC (Aerospace), ARL support, ASPO support and Contractor SETA support). | |
Total | 14519 |
FY 1996 Planned Program:
10696 | Continue to pursue technology for the refinement of the TENCAP Common Baseline for fully exploiting National Capabilities to meet emerging worldwide contingency scenarios such as upgrades to Communication System Processor (CSP) to incorporate Tactical Packet Network (TPN) and Defense Switched Network (DSNET) connectivity, DAMA appliqué to SUCCESS radios and support to JCMT. | |
7600 | Initiate design concept and prototype development of Tactical Exploitation Systems (TES) with state-of-the-art hardware and software. | |
400 | Complete advanced development effort to retrofit ETUTs with enhanced MITT hardware and software. | |
5120 | Continue support to TENCAP program management with administrative activities (e.g., FFRDC (Aerospace), ASPO, SETA, and TEC). | |
2980 | Continue support to efforts being developed under PE 0305154D (DARP) Project P531 (e.g., FFRDC (Aerospace), ASPO, SETA, and TEC). | |
587 | Small Business Innovation Research (SBIR)/Small Business Technology Transfer (STTR). | |
77 | Revised Economic Assumptions amount not available for execution. | |
Total | 27460 |
FY 1997 Planned Program:
6917 | Continue to pursue technology for the refinement of the TENCAP Common Baseline for fully exploiting National Capabilities to meet emerging worldwide contingency scenarios | |
10899 | Initiate advanced development efforts for ground processing technologies for new National sensors capabilities that will be incorporated into TES | |
5270 | Continue support to TENCAP program management with administrative activities (e.g., FFRDC (Aerospace), ASPO, SETA, and TEC). | |
2974 | Continue support to efforts being developed under PE 0305154D (DARP) Project P531 (e.g., FFRDC (Aerospace), ASPO, SETA, and TEC). | |
Total | 26060 |
B. Project Change Summary | FY 1995 | FY 1996 | FY 1997 | |
Previous President's Budget (FY 1996) | 14815 | 28369 | 26913 | |
Appropriated Amount (FY 1995) | 14519 | |||
Adjustments to FY 1995 * | ||||
Appropriated Amount (FY 1996) | 27738 | |||
Adjustments to FY 1996 | -278 | |||
Adjustment to Budget Year (FY 1996) since
FY 1996 President's Budget |
-853 | |||
Current Budget Submit/President's Budget | 14519 | 27460 | 26060 |
Change Summary Explanation:
Funding: FY 1996: (-278) Revised economic assumptions
FY 1997: (-853) Revised inflation rate
C. Other Program Funding Summary | FY 1995 | FY 1996 | FY 1997 | FY 1998 | FY 1999 | FY 2000 | FY 2001 | To
Compl |
Total
Cost | |
RDTE, A Budget Activity 4 | ||||||||||
PE 0603730A Project D560
Tact Surv Sys - Adv Dev |
11481 | 0 | 0 | 0 | 0 | 0 | 0 | |||
RDTE, A Budget Activity 5 | ||||||||||
PE 0604740A Project D662
Tact Surv Sys - Eng Dev |
2049 | 0 | 0 | 0 | 0 | 0 | 0 | |||
PE 0604766A Project D909
TENCAP - Eng Dev |
18811 | 23861 | 15758 | 20631 | 21235 | 28299 | 27122 | Cont | Cont | |
RDTE, D Budget Activity 7 | ||||||||||
PE 0305154D Project P531
DARP |
39313 | 42737 | 47780 | 35264 | 13750 | 13824 | 13723 | Cont | Cont | |
Other Procurement Army, OPA-2 | ||||||||||
BZ 7315 TENCAP | 4636 | 4473 | 1758 | 1705 | 1758 | 4678 | 13936 | Cont | Cont | |
BA 0329 DARP | 2411 | 0 | 0 | 0 | 0 | 0 | 0 | |||
Procurement, Defense Wide | ||||||||||
PE 0305154D Project P531 | 51534 | 80822 | 98486 | 94583 | 76123 | 72124 | 67173 | Cont | Cont |
D. Schedule Profile | FY 1995 | FY 1996 | FY 1997 |
1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | |||||
Complete Adv Dev ETUT Retrofit | X* | |||||||||||||||
Initiate Analysis/Design Concept for TES | X* | |||||||||||||||
Initiate Prototype Development for TES | X | |||||||||||||||
Complete Adv Dev of DAMA Appliqué into TENCAP Common Baseline Success Radios | X | |||||||||||||||
Complete Adv Dev of 5 Additional MITTS | X* |
* Milestone Completed
A. Project Cost Breakdown | ||||
Common Baseline (*1, *2) | 8790 | 10696 | 6917 | |
TES (*2) | 736 | 7600 | 10899 | |
ETUT | 1500 | 400 | 0 | |
ASPO in- House (*2, *3, *4) | 1109 | 2541 | 2479 | |
FFRDC (*2) | 657 | 219 | 95 | |
System Engineering (Contractor) (*2, *3) | 1227 | 4115 | 4620 | |
System Engineering (Government) (*2, *3) | 500 | 1225 | 1050 | |
SBIR/STTR | 587 | |||
Revised Economic Assumptions amount not available for Execution | 77 | |||
Total | 14519 | 27460 | 26060 |
(*1) TENCAP Common Baseline addresses common subsystems, planned improvements, key activities and ongoing/planned initiatives determined to have potential application to multiple TENCAP systems (including MIES and ETRAC that are funded under the DARP (PE 0305154D).
(*2) In FY 1996 and beyond, efforts previously funded under 0603730A.D560 are consolidated into this project.
(*3) Approximately 40% of program management cost in FY 1996 and FY 1997 support efforts being developed under PE 0305154D.P531.
(*4) The ASPO In-House support in this project also supports efforts being developed under PE 0604766A.D909.
B. Budget Acquisition History and Planning Information: Not Applicable